LawSignals

Legislative tracking for compliance, operations, HR and legal teams

Data Centers and Energy Load Tracker

September 2026

State legislation on data center siting, tax incentives, large-load electricity costs, on-site power and water. Legislation only: utility commission dockets and tariff filings are not covered.

Data Centers and Energy Load Tracker is issued monthly. Receive each issue by email, with the bills behind it in your dashboard. 14-day trial.

In brief

California dominated September 2026 activity, enacting nine bills and vetoing one. The new laws impose water and energy reporting requirements on data centers (AB 1577, AB 2619, AB 2469), mandate separate retail electricity rate classifications and tariffs for large energy users (AB 2383, SB 886, SB 1168), and bring data centers under environmental review while allowing expedited certification for zero-carbon projects (SB 887). A federal ratepayer protection bill, H.R. 9340, passed one chamber; it would require utilities to charge large-load customers rates covering the full incremental cost of serving them. Pennsylvania advanced three bills through committee or one chamber, addressing emergency planning, zoning, and transparency for large-load facilities.

Key bills

This month in numbers

MeasureBills
Matched to this Tracker678
Signed into law in 202647
New this month31
Moved a stage15
Passed a chamber11
Signed into law this month9
Vetoed this month1

Where it happened

StateBills that moved
CA10
PA3
ND1
US1

By topic

TopicMovedSigned into law
Large-load tariffs and cost allocation518
Siting, zoning and permitting58
Tax incentives and clawbacks08
On-site and co-located generation13
Water, cooling and emissions514
Grid reliability and load flexibility310

The month in brief

California dominated September 2026 activity, enacting nine bills and vetoing one. The new laws impose water and energy reporting requirements on data centers (AB 1577, AB 2619, AB 2469), mandate separate retail electricity rate classifications and tariffs for large energy users (AB 2383, SB 886, SB 1168), and bring data centers under environmental review while allowing expedited certification for zero-carbon projects (SB 887). A federal ratepayer protection bill, H.R. 9340, passed one chamber; it would require utilities to charge large-load customers rates covering the full incremental cost of serving them. Pennsylvania advanced three bills through committee or one chamber, addressing emergency planning, zoning, and transparency for large-load facilities.

Taking effect

No law or rule matched to this Tracker has an effective date between 1 September 2026 and 29 December 2026. Of the 47 laws signed in 2026, 22 name no effective date that could be read and are not listed.

Signed into law in September 2026

StateBillTitleBecame law
CAAB 1577Data centers: reporting.
Siting, zoning and permitting, Water, cooling and emissions
21 September 2026
Requires data center owners to report energy and operational data to the State Energy Commission and local agencies. Signed into law.
CAAB 2383Electricity: data centers.
Large-load tariffs and cost allocation
21 September 2026
Requires a separate retail electricity rate classification for large energy use facilities with its own tariff. Signed into law.
CAAB 2469Data centers: water use disclosures.
Siting, zoning and permitting, Water, cooling and emissions
21 September 2026
Prohibits local approval of data center permits without water assessments and scarcity plans; requires separate water use classifications. Signed into law.
CAAB 2619Water resources: data centers.
Water, cooling and emissions
21 September 2026
Requires data centers to report water use estimates before licensing and actual use upon renewal. Signed into law.
CASB 1168 †Data centers: rate structures.
Large-load tariffs and cost allocation
21 September 2026
Requires assessment of rate structures ensuring data centers pay reasonable transmission and distribution costs. Signed into law.
CASB 886California Technology Innovation and Ratepayer Protection Act.
Large-load tariffs and cost allocation
21 September 2026
Requires separate tariffs for data center interconnection and grid services, with cost-shift protections and 10-year generation contracts. Signed into law.
CASB 887California Environmental Quality Act: environmental leadership development projects: data centers: geothermal powerplant projects.
Siting, zoning and permitting, On-site and co-located generation
21 September 2026
Prohibits CEQA categorical exemptions for data centers; allows expedited certification for zero-carbon projects meeting community benefit conditions. Signed into law.
CAAB 2266 †Electricity: load-serving entities.
Grid reliability and load flexibility
20 September 2026
Requires a uniform capacity valuation method for resource adequacy obligations and consolidated procurement reporting starting January 2030. Signed into law.
CAAB 2476Electricity: integrated resource plans: Department of Water Resources: procurement.
Grid reliability and load flexibility
18 September 2026
Eliminates a funding prerequisite for Department of Water Resources procurement from pumped hydroelectric facilities. Signed into law.

On the governor's desk

No bill in this Tracker is currently awaiting a governor's signature.

What else moved this month

Passed one chamber

StateBillTitleCurrent statusAction
PAHB 2535 †An Act providing for the public safety regulation of large load users; requiring the submission of emergency operations plans and generalized infrastructure inventories as a condition of occupancy; protecting confidential security information; and providing for enforcement and…
Grid reliability and load flexibility
Passed chamber30 September 2026
Would require large-load users to submit emergency operations plans and infrastructure inventories to local fire officials. Passed one chamber.
USH.R. 9340Ratepayer Protection Act
Large-load tariffs and cost allocation
Passed chamber16 September 2026
Would require utilities to charge large-load customers rates covering full incremental costs of upgrades needed to serve them. Passed one chamber.

Vetoed

StateBillTitleCurrent statusAction
CAAB 1761Electricity: calculation methodology: nonbypassable charges: data disclosure.
Large-load tariffs and cost allocation
Vetoed20 September 2026
Would have required disclosure of data underlying cost-recovery charge calculations to load-serving entities and ratepayer advocates. Vetoed.

Reported out of committee

StateBillTitleCurrent statusAction
NDSB 2406A BILL for an Act to create and enact chapter 44-04.1 of the North Dakota Century Code, relating to prohibiting agencies from entering nondisclosure agreements concerning data centers and industrial projects; to provide a penalty; to provide an effective date; and to provide an…
Water, cooling and emissions
Passed committee2 September 2026
Would prohibit state and local agencies from entering nondisclosure agreements with data center developers. Reported out of committee.
PAHB 2775An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, further providing for definitions; and, in zoning, further providing for ordinance provisions.
Siting, zoning and permitting
Passed committee30 September 2026
Would define commercial data centers and large load facilities in the planning code and require utility documentation before zoning approval. Reported out of committee.
PASB 1408An Act providing for data center transparency; prohibiting certain nondisclosure agreements between public agencies and data centers; providing for data centers and public input; prohibiting data centers from being developed or operated by certain foreign entities; and providing…
Siting, zoning and permitting, Water, cooling and emissions
Passed committee29 September 2026
Would prohibit public agencies from entering agreements restricting disclosure of data center information. Reported out of committee.

New and notable

StateBillTitleCurrent status
NDSB 2406A BILL for an Act to create and enact chapter 44-04.1 of the North Dakota Century Code, relating to prohibiting agencies from entering nondisclosure agreements concerning data centers and industrial projects; to provide a penalty; to provide an effective date; and to provide an…
Water, cooling and emissions
Passed committee
PAHB 2775An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, further providing for definitions; and, in zoning, further providing for ordinance provisions.
Siting, zoning and permitting
Passed committee
MIHB 6391 †Businesses: other; siting requirements for certain data centers; provide for. Creates new act. TIE BAR WITH: HB 6388'26
Siting, zoning and permitting
In committee
MIHB 6426 †Businesses: other; data center local decision protection act; create. Creates new act. TIE BAR WITH: HB 6427'26
Siting, zoning and permitting
In committee
MIHB 6427 †Businesses: other; Michigan zoning enabling act; make subject to the data center local decision protection act. Amends secs. 205 & 606 of 2006 PA 110 (MCL 125.3205 & 125.3606). TIE BAR WITH: HB 6426'26
Siting, zoning and permitting
In committee
MISB 1179 †Energy: other; reporting requirements for data centers; provide for. Creates new act.
Water, cooling and emissions
In committee
NJA 5373Concerns noise abatement of data centers.
Siting, zoning and permitting
In committee
NJA 5396Requires data centers to submit water supply emergency contingency plan to DEP.
Water, cooling and emissions
In committee
NJA 5397Requires data centers to submit construction phase water usage plan to DEP.
Water, cooling and emissions
In committee
NJA 5482Establishes six month moratorium on approvals, construction, expansion, subsidies, and tax incentives for certain artificial intelligence data centers; creates Artificial Intelligence Data Center Impact Commission.
Siting, zoning and permitting, Tax incentives and clawbacks
In committee

Regulatory Watch

None of the 1,639 federal documents published in September 2026 matched this Tracker, and no comment window or effective date is pending.

State rulemaking

State registers and regulators in Alabama, Arkansas, California, Florida, Idaho, Iowa, Kentucky, Louisiana, Maryland, Michigan, Minnesota, Nevada, New Hampshire, New Mexico, New York, Ohio, Rhode Island, South Dakota, Texas, Utah, Vermont, Virginia, Washington, West Virginia and Wisconsin were read for September 2026. Not yet covered: Alaska, Arizona, Colorado, Connecticut, Delaware, District of Columbia, Georgia, Hawaii, Illinois, Indiana, Kansas, Maine, Massachusetts, Mississippi, Missouri, Montana, Nebraska, New Jersey, North Carolina, North Dakota, Oklahoma, Oregon, Pennsylvania, South Carolina, Tennessee and Wyoming. None carried a rulemaking matched to this Tracker.

Watchlist for next month

StateBillTitleCurrent status
NDSB 2406A BILL for an Act to create and enact chapter 44-04.1 of the North Dakota Century Code, relating to prohibiting agencies from entering nondisclosure agreements concerning data centers and industrial projects; to provide a penalty; to provide an effective date; and to provide an…
Water, cooling and emissions
Passed committee
PAHB 2535 †An Act providing for the public safety regulation of large load users; requiring the submission of emergency operations plans and generalized infrastructure inventories as a condition of occupancy; protecting confidential security information; and providing for enforcement and…
Grid reliability and load flexibility
Passed chamber
PAHB 2775An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, further providing for definitions; and, in zoning, further providing for ordinance provisions.
Siting, zoning and permitting
Passed committee
PASB 1408An Act providing for data center transparency; prohibiting certain nondisclosure agreements between public agencies and data centers; providing for data centers and public input; prohibiting data centers from being developed or operated by certain foreign entities; and providing…
Siting, zoning and permitting, Water, cooling and emissions
Passed committee
USH.R. 9340Ratepayer Protection Act
Large-load tariffs and cost allocation
Passed chamber

Signed into law earlier in 2026

StateBillTitleBecame law
ALHB 399Tax abatements for data processing centers, exemption period limited, collection of certain taxes on purchases required, sunset date extended
Tax incentives and clawbacks
17 April 2026
ALSB 270 †Electric Utilities; review by Public Service Commission of certain contracts with large load data centers further provided for
Large-load tariffs and cost allocation
17 April 2026
DEHB 233AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO LARGE ENERGY USE FACILITIES.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
26 August 2026
DEHB 310 †AN ACT TO AMEND TITLE 30 OF THE DELAWARE CODE RELATING TO BUSINESS TAX CREDITS AND DEDUCTIONS.
Large-load tariffs and cost allocation, Tax incentives and clawbacks, Water, cooling and emissions
26 August 2026
DEHB 445AN ACT TO AMEND TITLE 26 AND TITLE 29 OF THE DELAWARE CODE RELATING TO LARGE ENERGY USE FACILITIES.
On-site and co-located generation, Grid reliability and load flexibility
26 August 2026
DESB 312AN ACT TO AMEND TITLE 9, TITLE 22, AND TITLE 29 OF THE DELAWARE CODE RELATING TO DATA CENTERS.
Siting, zoning and permitting
26 August 2026
DESB 308AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO THE LOAD FORECAST ACCOUNTABILITY ACT.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
23 July 2026
DESB 276 †AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO ELECTRIC UTILITIES.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
10 June 2026
FLSB 484Data Centers
Large-load tariffs and cost allocation, Siting, zoning and permitting, Water, cooling and emissions
7 May 2026
IDH 895DATA CENTERS – Adds to existing law to establish limitations on consumptive use of water for cooling certain data centers.
Water, cooling and emissions
2 April 2026
IDH 911PUBLIC UTILITIES – Adds to existing law to provide for new large loads.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
2 April 2026
INHB 1042Regulation and investment of cryptocurrency.
Siting, zoning and permitting
3 March 2026
KSSB 92Extending the expiration date for provisions that authorize an electric utility to not offer parallel generation service to certain large load customers and exempt certain large load customers from the determination of the utility's peak demand.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
9 April 2026
MDHB 1532Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) Act12 May 2026
MELD 713An Act Regarding Taxation
Tax incentives and clawbacks
23 April 2026
NELB 1010Adopt the Large Load Customer Regulation Act, provide for eminent domain relating to energy storage and regulation and taxation of energy storage resources, and change provisions relating to cryptocurrency mining operations and data centers
Large-load tariffs and cost allocation
17 April 2026
NJS 3379Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.
Water, cooling and emissions
27 August 2026
NJS 4390"End Data Center Tax Credits Act"; reduces tax credits available for Next New Jersey Program.*
Tax incentives and clawbacks
27 August 2026
NJA 796Requires electric public utilities to develop and apply special rules for certain data centers to protect non-data center customers from increased costs.**
Large-load tariffs and cost allocation
7 July 2026
OHSB 103Allow alternative rate plans for certain natural gas companies
Large-load tariffs and cost allocation
20 March 2026
OKHB 2992Corporation Commission; creating the Data Center Customer Ratepayer Protection Act of 2026; effective date; emergency.
Large-load tariffs and cost allocation
11 May 2026
SCH 5122Internet and Communications Service Providers Equipment
Tax incentives and clawbacks
19 May 2026
SCS 163Cryptocurrency
Grid reliability and load flexibility
19 May 2026
SDHB 1038allow the Public Utilities Commission to assess actual costs to data centers that are customers of public utilities.
Large-load tariffs and cost allocation
30 March 2026
SDSB 135protect residents from increased utility costs and utility shortages caused by data centers and clarify authority to regulate data centers.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
30 March 2026
TNHB 1847Computers and Electronic Processing - As enacted, generally prohibits a municipality or electric utility to pay or absorb the cost of electrical infrastructure incurred to serve a data center; makes related changes. - Amends TCA Title 5; Title 6; Title 7; Title 13 and Title 65.
Large-load tariffs and cost allocation
Companion: TN SB 2128
7 May 2026
UTHB 507State Coordination of Regional and Local Economic Development Projects Amendments25 March 2026
UTHB 76Data Center Water Transparency Amendments
Water, cooling and emissions
23 March 2026
VAHB 153Data centers; site assessment, sound profile of the high energy use facility.
Siting, zoning and permitting, Water, cooling and emissions
13 April 2026
VAHB 323Data centers; Department of Energy shall lead efforts to accelerate use of waste heat, report.
Water, cooling and emissions
13 April 2026
VAHB 496Certain data from water users; water use consumption for domestic, etc., purposes, data centers.
Water, cooling and emissions
13 April 2026
VASB 553Certain data from water users; water use consumption for domestic, etc., purposes, data centers.
Water, cooling and emissions
13 April 2026
VASB 94Data centers; site assessment, sound profile of the high energy use facility.
Siting, zoning and permitting, Water, cooling and emissions
13 April 2026
VAHB 507Data centers; permit requirements, emission limits for certain engine-generator sets.
Water, cooling and emissions
8 April 2026
VAHB 557Tangible personal property tax; establishes classification for electric landscaping equipment.8 April 2026
WASB 6231Removing a tax exemption for the replacement of equipment for data centers.
Tax incentives and clawbacks
1 April 2026
WIAB 657Relating to: a sales and use tax exemption for nuclear fusion technology projects. (FE)
Tax incentives and clawbacks
2 April 2026
WVHB 4983 †Authorizing the Department of Commerce to promulgate a legislative rule relating to certification of a microgrid district or certification as a high impact data center
Tax incentives and clawbacks, On-site and co-located generation
14 March 2026

Every matched bill

StateBillTitleCurrent statusLast action
AKHB 259An Act relating to large energy use facilities; relating to electric and gas utilities; relating to community benefit agreements with municipalities; and relating to the duties of the Regulatory Commission of Alaska.
Large-load tariffs and cost allocation, Siting, zoning and permitting
In committee3 February 2026
AKSB 250An Act relating to data centers; and relating to utility service for data centers.
Large-load tariffs and cost allocation, Tax incentives and clawbacks
Passed chamber18 May 2026
ALHB 399Tax abatements for data processing centers, exemption period limited, collection of certain taxes on purchases required, sunset date extended
Tax incentives and clawbacks
Enacted17 April 2026
ALSB 270 †Electric Utilities; review by Public Service Commission of certain contracts with large load data centers further provided for
Large-load tariffs and cost allocation
Enacted17 April 2026
ARHB 1444 †TO AMEND THE SALES AND USE TAX EXEMPTION FOR DATA CENTERS.
Tax incentives and clawbacks
Enacted10 April 2025
ARHB 1572TO CREATE A TECHNICAL FEASIBILITY STUDY ON NEW NUCLEAR ENERGY GENERATION; AND TO DECLARE AN EMERGENCY.
On-site and co-located generation
Enacted16 April 2025
ARHR 1009TO AUTHORIZE THE INTRODUCTION OF A NONAPPROPRIATION BILL TO REQUIRE A DIGITAL ASSET MINING BUSINESS TO PAY A FEE FOR EXTRAORDINARY ELECTRICAL ENERGY USAGE AND TO IMPLEMENT OVERSIGHT PROCEDURES.
Large-load tariffs and cost allocation
Companion: AR SR 8
In committee29 April 2026
ARHR 1010TO AUTHORIZE THE INTRODUCTION OF A NONAPPROPRIATION BILL TO PROHIBIT THE USE OF A COMPUTER MANUFACTURED BY A COVERED FOREIGN ENTITY IN DIGITAL ASSET MINING AND PROHIBIT THE USE OF CERTAIN SOFTWARE IN DIGITAL ASSET MINING.
Companion: AR SR 9
In committee29 April 2026
ARHR 1012TO AUTHORIZE THE INTRODUCTION OF A NONAPPROPRIATION BILL TO REGULATE THE IMPACT ON WATER USAGE AND THE ELECTRICAL GRID BY BLOCKCHAIN NETWORKS AND DIGITAL ASSET MINING.
Water, cooling and emissions, Grid reliability and load flexibility
Companion: AR SR 12
In committee29 April 2026
ARHR 1013TO AUTHORIZE THE INTRODUCTION OF A NONAPPROPRIATION BILL TO AMEND THE REQUIREMENTS FOR A DIGITAL ASSET MINING BUSINESS AND AMEND THE AUTHORITY OF A LOCAL GOVERNMENT WITH RESPECT TO A DIGITAL ASSET MINING BUSINESS.
Siting, zoning and permitting
Companion: AR SR 7
In committee29 April 2026
ARHR 1014TO AUTHORIZE THE INTRODUCTION OF A NONAPPROPRIATION BILL TO REQUIRE A DIGITAL ASSET MINING BUSINESS TO PROVIDE NOTIFICATION BEFORE PURCHASING OR LEASING LAND OR A BUILDING OR BEGINNING CONSTRUCTION.
Siting, zoning and permitting
Companion: AR SR 11
In committee29 April 2026
ARSB 10TO AMEND THE ARKANSAS DATA CENTERS ACT OF 2023; AND TO REGULATE THE IMPACT ON WATER USAGE AND THE ELECTRIC GRID BY BLOCKCHAIN NETWORKS AND DIGITAL ASSET MINING.
Water, cooling and emissions, Grid reliability and load flexibility
In committee5 May 2025
ARSB 60TO PROHIBIT A DIGITAL ASSET MINING BUSINESS FROM BEING LOCATED WITHIN A THIRTY-MILE RADIUS OF A MILITARY FACILITY; AND TO DECLARE AN EMERGENCY.
Siting, zoning and permitting
In committee5 May 2025
AZHB 2119computer data center; application; deadline
Tax incentives and clawbacks
Companion: AZ SB 1799
Dead22 January 2026
AZHB 2452comprehensive plans; data centers; nuclear
Siting, zoning and permitting, On-site and co-located generation
Companion: AZ HB 2456
Dead26 February 2026
AZHB 2457public utilities; plant construction; colocation
On-site and co-located generation
Dead10 June 2026
AZHB 2467data centers; incentives repeal; requirements
Tax incentives and clawbacks
Companion: AZ HB 2631, AZ HB 2820, AZ SB 1463, AZ SB 1467
Dead22 January 2026
AZHB 2738cost responsibility agreements; data centers
Large-load tariffs and cost allocation
Dead22 January 2026
AZHB 2949energy costs; large data centers
Large-load tariffs and cost allocation
In committee5 February 2026
AZHB 4009 †data centers; state lands; map
Siting, zoning and permitting
Dead26 February 2026
AZHB 4097large customer energy supply
Large-load tariffs and cost allocation, On-site and co-located generation
In committee16 February 2026
AZSB 1380large load customers; energy costs
Large-load tariffs and cost allocation
In committee27 January 2026
CAAB 1095Data centers: waste heat energy.
Water, cooling and emissions
Dead2 February 2026
CAAB 1577Data centers: reporting.
Siting, zoning and permitting, Water, cooling and emissions
Enacted21 September 2026
CAAB 1761Electricity: calculation methodology: nonbypassable charges: data disclosure.
Large-load tariffs and cost allocation
Vetoed20 September 2026
CAAB 222Data centers: power usage effectiveness: cost shifts.
Large-load tariffs and cost allocation, Water, cooling and emissions
Passed chamber29 August 2025
CAAB 2266 †Electricity: load-serving entities.
Grid reliability and load flexibility
Enacted20 September 2026
CAAB 2383Electricity: data centers.
Large-load tariffs and cost allocation
Enacted21 September 2026
CAAB 2469Data centers: water use disclosures.
Siting, zoning and permitting, Water, cooling and emissions
Enacted21 September 2026
CAAB 2476Electricity: integrated resource plans: Department of Water Resources: procurement.
Grid reliability and load flexibility
Enacted18 September 2026
CAAB 2619Water resources: data centers.
Water, cooling and emissions
Enacted21 September 2026
CAAB 388Electricity.
Large-load tariffs and cost allocation, On-site and co-located generation
Dead2 February 2026
CAAB 93Water resources: data centers.
Water, cooling and emissions
Vetoed22 January 2026
CASB 1168 †Data centers: rate structures.
Large-load tariffs and cost allocation
Enacted21 September 2026
CASB 57Electrical corporations: data centers: report.
Large-load tariffs and cost allocation
Enacted11 October 2025
CASB 886California Technology Innovation and Ratepayer Protection Act.
Large-load tariffs and cost allocation
Enacted21 September 2026
CASB 887California Environmental Quality Act: environmental leadership development projects: data centers: geothermal powerplant projects.
Siting, zoning and permitting, On-site and co-located generation
Enacted21 September 2026
CASB 978Data centers: labor: electricity rates.
Large-load tariffs and cost allocation
Passed committee14 May 2026
COHB 1030Data Center & Utility Modernization
Large-load tariffs and cost allocation, Tax incentives and clawbacks
Introduced7 May 2026
COHB 1246Consumer-Regulated Electric Utilities
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Introduced30 April 2026
COHB 25-1177Utility Economic Development Rate Tariff Adjustments
Large-load tariffs and cost allocation
Enacted19 May 2025
COSB 102Large-Load Data Centers
Large-load tariffs and cost allocation, Siting, zoning and permitting, Water, cooling and emissions, Grid reliability and load flexibility
Introduced11 May 2026
COSB 25-280Data Center Development & Grid Modernization Act
Large-load tariffs and cost allocation, Tax incentives and clawbacks, Grid reliability and load flexibility
In committee8 May 2025
CTHB 5076 †AN ACT CONCERNING ENERGY AND WATER EFFICIENCY REQUIREMENTS FOR ARTIFICIAL INTELLIGENCE DATA CENTERS.
Water, cooling and emissions
In committee10 January 2025
CTHB 5469AN ACT CONCERNING COLOCATED ELECTRIC SUPPLIERS AND LARGE ELECTRIC LOAD CUSTOMERS.
Large-load tariffs and cost allocation, On-site and co-located generation
Passed committee7 April 2026
CTHB 5926 †AN ACT IMPLEMENTING A SURCHARGE ON ELECTRICITY CONSUMED BY DATA CENTERS.
Large-load tariffs and cost allocation
In committee22 January 2025
CTHB 5955 †AN ACT REQUIRING AN IMPACT EVALUATION CONCERNING LARGE DATA CENTERS.
Grid reliability and load flexibility
In committee22 January 2025
CTSB 1292AN ACT REQUIRING A STUDY CONCERNING ENERGY EFFICIENCY REQUIREMENTS FOR ARTIFICIAL INTELLIGENCE DATA CENTERS.
Water, cooling and emissions
Passed committee7 April 2025
CTSB 1353AN ACT CONCERNING SUBSIDIES FOR NEW ELECTRICITY DEMAND.
Large-load tariffs and cost allocation
Passed committee25 March 2025
CTSB 245 †AN ACT ELIMINATING CERTAIN TAX INCENTIVES FOR DATA CENTERS.
Tax incentives and clawbacks
Passed committee23 March 2026
CTSB 544AN ACT REPEALING CERTAIN ELECTRIC SUBSIDIES, PROGRAMS AND TAX EXEMPTIONS.
Tax incentives and clawbacks
In committee14 January 2025
CTSB 892 †AN ACT REQUIRING AN EVALUATION OF THE IMPACT OF LARGE DATA CENTERS ON THE ELECTRIC DISTRIBUTION SYSTEM.
Grid reliability and load flexibility
In committee22 January 2025
DEHB 233AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO LARGE ENERGY USE FACILITIES.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Enacted26 August 2026
DEHB 310 †AN ACT TO AMEND TITLE 30 OF THE DELAWARE CODE RELATING TO BUSINESS TAX CREDITS AND DEDUCTIONS.
Large-load tariffs and cost allocation, Tax incentives and clawbacks, Water, cooling and emissions
Enacted26 August 2026
DEHB 445AN ACT TO AMEND TITLE 26 AND TITLE 29 OF THE DELAWARE CODE RELATING TO LARGE ENERGY USE FACILITIES.
On-site and co-located generation, Grid reliability and load flexibility
Enacted26 August 2026
DESB 276 †AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO ELECTRIC UTILITIES.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Enacted10 June 2026
DESB 308AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO THE LOAD FORECAST ACCOUNTABILITY ACT.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Enacted23 July 2026
DESB 312AN ACT TO AMEND TITLE 9, TITLE 22, AND TITLE 29 OF THE DELAWARE CODE RELATING TO DATA CENTERS.
Siting, zoning and permitting
Enacted26 August 2026
DESB 353 †AN ACT TO AMEND THE LAWS OF DELAWARE RELATING TO A MORATORIUM ON DATA CENTER DEVELOPMENT.
Siting, zoning and permitting
In committee30 June 2026
FLHB 1007Data Centers
Large-load tariffs and cost allocation, Siting, zoning and permitting, Water, cooling and emissions
Passed committee11 March 2026
FLHB 1517Approval of Data Center Facilities
Tax incentives and clawbacks, Water, cooling and emissions
Dead13 March 2026
FLHB 817Taxes on the Rental of Real PropertyDead16 June 2025
FLSB 1118Public Records/Data Centers
Siting, zoning and permitting
Dead13 March 2026
FLSB 484Data Centers
Large-load tariffs and cost allocation, Siting, zoning and permitting, Water, cooling and emissions
Enacted8 May 2026
GAHB 1012Local government; construction or development of new data centers for a specified time; prohibit
Siting, zoning and permitting
In committee28 January 2026
GAHB 1059Data Center Impact Assessment and Development Moratorium Act of 2026; enact
Siting, zoning and permitting, Grid reliability and load flexibility
In committee2 February 2026
GAHB 1063Electric utilities; protect residential and retail electricity customers from costs associated with data center construction and operation; require
Large-load tariffs and cost allocation
Passed chamber18 February 2026
GAHB 1323Electrical service; require new data centers to operate as hybrid power data centers
On-site and co-located generation
In committee19 February 2026
GAHB 1387Ad valorem tax; state-wide homestead exemption in an amount as determined from proceeds generated from collection of certain ad valorem property taxes on data centers
Tax incentives and clawbacks
In committee24 February 2026
GAHB 559 †Sales and use tax; exemption for certain high-technology data center equipment; revise sunset date
Tax incentives and clawbacks
In committee21 February 2025
GASB 34Public Service Commission; costs incurred by an electric utility as a result of providing electric services to commercial data centers from being included in any rates; prohibit
Large-load tariffs and cost allocation
Passed committee25 February 2026
GASB 408State Sales and Use Taxes; data center equipment sales and use tax exemption; advance the sunset date
Tax incentives and clawbacks
In committee16 January 2026
GASB 410State Sales and Use Taxes; the data center equipment sales and use tax exemption; repeal
Tax incentives and clawbacks
Passed chamber10 March 2026
GASB 421"The Data Center Transparency Act"; enact
Water, cooling and emissions
In committee27 January 2026
GASB 436Counties, Municipal Corporations; local governments and political subdivisions from entering into nondisclosure agreements regarding electricity usage or water usage of any entity; prohibit
Tax incentives and clawbacks, Water, cooling and emissions
In committee29 January 2026
GASB 530Georgia Property Tax Fairness Fund; create
Tax incentives and clawbacks
In committee19 February 2026
HIHCR 206REQUESTING THE HAWAII STATE ENERGY OFFICE TO CONVENE A WORKING GROUP TO STUDY THE POTENTIAL IMPACTS OF LARGE DATA CENTERS ON HAWAII'S ELECTRIC UTILITIES, RATEPAYERS, NATURAL RESOURCES, AND CLIMATE GOALS.
Large-load tariffs and cost allocation, Water, cooling and emissions, Grid reliability and load flexibility
Companion: HI HR 196, HI SCR 95, HI SR 90
Passed chamber27 April 2026
HISB 338RELATING TO TAXATION.
Tax incentives and clawbacks
Passed chamber8 December 2025
IAHF 2001A bill for an act relating to water efficiency of data centers, including requirements for water-efficient cooling technologies and encouragement for the use of nonpotable and recycled water sources, providing civil penalties, and including effective date and applicability…
Water, cooling and emissions
In committee13 January 2026
IAHF 2198A bill for an act relating to the disclosure of tax incentives provided to web search portal businesses and data center businesses, and including effective date provisions.
Tax incentives and clawbacks
In committee29 January 2026
IAHF 2261A bill for an act relating to customer classes for large energy use facilities, and including applicability provisions.
Large-load tariffs and cost allocation
In committee3 February 2026
IAHF 2391A bill for an act relating to water usage reporting requirements for large water use facilities.
Water, cooling and emissions
Companion: IA SF 2104
In committee11 February 2026
IAHF 2447A bill for an act relating to water and energy use for data centers, including reporting and tariff requirements, and including effective date provisions.
Large-load tariffs and cost allocation, Water, cooling and emissions
Passed committee23 February 2026
IAHF 2668A bill for an act relating to the regulation of public utilities, including virtual power plants and integrated resource planning.
Grid reliability and load flexibility
Introduced23 February 2026
IAHF 2690A bill for an act relating to water and energy use for data centers, including reporting and tariff requirements, and including effective date provisions.
Large-load tariffs and cost allocation, Water, cooling and emissions
Introduced12 March 2026
IAHSB 727A bill for an act relating to investment requirements for data center businesses that claim certain sales tax exemptions and sales and use tax refunds.
Tax incentives and clawbacks
Companion: IA HF 2688
Passed committee23 February 2026
IASF 2249A bill for an act relating to customer classes for large energy use facilities, and including applicability provisions.
Large-load tariffs and cost allocation
Companion: IA SF 2324
In committee12 February 2026
IASF 2273A bill for an act relating to the regulation of public utilities, including rate filings, rate adjustment mechanisms, virtual power plants, and integrated resource planning.
Grid reliability and load flexibility
In committee19 February 2026
IASSB 3181A bill for an act making certain sales and use tax exemptions relating to nuclear electric generation facilities, web search portal businesses, and data center businesses contingent upon making contributions to institutions of higher education governed by the state board of…
Tax incentives and clawbacks
Passed committee14 April 2026
IDH 315TAXATION – Amends existing law to revise provisions regarding the sales tax exemption for Idaho information technology equipment.
Tax incentives and clawbacks
In committee26 March 2025
IDH 395PUBLIC UTILITIES – Adds to existing law to provide for competitive procurement of electric services and electric ratepayer protection.
Large-load tariffs and cost allocation
Passed committee27 March 2025
IDH 609TAXATION – Amends existing law to revise a sales tax exemption for data center equipment and to revise a property tax exemption for certain capital investments.
Tax incentives and clawbacks
Introduced10 February 2026
IDH 756PUBLIC UTILITY – Amends and adds to existing law to provide for new large loads.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Introduced25 February 2026
IDH 895DATA CENTERS – Adds to existing law to establish limitations on consumptive use of water for cooling certain data centers.
Water, cooling and emissions
Enacted2 April 2026
IDH 897TAXATION – Amends existing law to revise a sales tax exemption for data center equipment and to revise a certain property tax exemption for certain capital investments.
Tax incentives and clawbacks
Companion: ID H 820
Passed chamber2 April 2026
IDH 911PUBLIC UTILITIES – Adds to existing law to provide for new large loads.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Enacted2 April 2026
IDHCR 19ELECTRICITY STUDY – States findings of the Legislature and authorizes the Legislative Council to appoint a committee to undertake and complete a study of new Idaho large electricity loads and rate payer protections.
Large-load tariffs and cost allocation
Passed committee4 April 2025
IDS 1368PUBLIC UTILITIES – Adds to existing law to provide for new large loads.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Introduced5 March 2026
ILHB 3565INC TX-DATA CENTERS
Tax incentives and clawbacks
Companion: IL SB 227
In committee21 March 2025
ILHB 3574PROCUREMENT-DATA RESIDENCY
Companion: IL HB 3587, IL SB 2502
Passed chamber2 June 2025
ILHB 4120UTILITIES-VARIOUSIntroduced15 October 2025
ILHB 4172UTILITY-PROJECT COST RECOVERYIntroduced28 October 2025
ILHB 4319DATA CENTER-PROPERTY RTSIntroduced14 January 2026
ILHB 4786REVENUE-VARIOUSPassed committee17 April 2026
ILHB 4989DATA CENTER HEATING/COOLING
Water, cooling and emissions
Introduced6 February 2026
ILHB 5607ADVANCED TECHNOLOGY LEADERSHIPIn committee27 March 2026
ILHB 5755MUNI CD-DATA CENTER REFERENDUM
Siting, zoning and permitting
Introduced5 May 2026
ILHB 5818LOC GOVT-DATA CENTERIntroduced2 October 2026
ILHB 5826DATA CENTER ENERGY ACCOUNTIntroduced19 October 2026
ILHR 744DATA CENTERS-SUPPLY OWN ENERGY
On-site and co-located generation
Introduced24 March 2026
ILSB 1050LOCAL GOVERNMENT-TECH
Siting, zoning and permitting
In committee2 September 2026
ILSB 1429EPA-NOISE-CRYPTO-MINING
Siting, zoning and permitting
Companion: IL SB 3030
Introduced31 January 2025
ILSB 2181DATA CENTER REPORTING
Water, cooling and emissions
In committee22 May 2026
ILSB 2290USE/OCC TX-QUANTUM COMPUTING
Tax incentives and clawbacks
In committee2 June 2025
ILSB 3120DCEO-DATA CENTERS
Tax incentives and clawbacks
In committee22 May 2026
ILSB 3578DATA CENTERS-FOREIGN OWNERSHIP
Siting, zoning and permitting
Companion: IL SB 94
Introduced1 July 2026
ILSB 3761DATA CENTERS-VARIOUS
Tax incentives and clawbacks
In committee22 May 2026
ILSB 3830DATA CENTERS-VARIOUS
Tax incentives and clawbacks
In committee22 May 2026
ILSB 4004AQUIFER PROTECTION ACT
Water, cooling and emissions
In committee2 September 2026
ILSB 4203DCEO-DATA CENTERS
Tax incentives and clawbacks
Introduced17 June 2026
ILSB 4206LOC GOVT-DATA CENTER
Siting, zoning and permitting
Introduced18 May 2026
INHB 1007Energy generation resources.
Large-load tariffs and cost allocation, On-site and co-located generation, Grid reliability and load flexibility
Enacted6 May 2025
INHB 1042Regulation and investment of cryptocurrency.
Siting, zoning and permitting
Enacted3 March 2026
INHB 1043Data center water regulation.
Water, cooling and emissions
In committee8 January 2026
INHB 1156Digital asset mining.
Siting, zoning and permitting
In committee21 January 2025
INHB 1189Labor requirements for data center incentives.
Tax incentives and clawbacks
In committee5 January 2026
INHB 1245IURC study of data centers.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee5 January 2026
INHB 1333Land use and development.
Siting, zoning and permitting, Tax incentives and clawbacks
Passed chamber5 February 2026
INSB 135Data center development.
Siting, zoning and permitting, Water, cooling and emissions, Grid reliability and load flexibility
In committee8 January 2025
INSB 234Energy utility matters.
Large-load tariffs and cost allocation
In committee8 January 2026
INSB 257Electricity rate increases due to data centers.
Large-load tariffs and cost allocation
In committee8 January 2026
INSB 431Construction of data center by foreign adversary.
On-site and co-located generation, Grid reliability and load flexibility
Enacted10 April 2025
INSB 79Data center development.
Siting, zoning and permitting, Water, cooling and emissions, Grid reliability and load flexibility
In committee6 January 2026
KSHB 2664Establishing the private energy campus and industrial host-site electric generation act to authorize the provision of energy services to private enterprises located on a private energy campus.Dead10 April 2026
KSSB 400Requiring data centers to use closed-loop cooling systems to mitigate water consumption.
Water, cooling and emissions
Dead10 April 2026
KSSB 526Requiring data centers to be located on land that was zoned for industrial or manufacturing uses or was not zoned on July 1, 2025, to qualify for the sales tax exemption for qualified data centers.
Siting, zoning and permitting, Tax incentives and clawbacks
Dead10 April 2026
KSSB 531Prohibiting the development or operation of any new large load data center in a county that has had a drought emergency declared for such county pursuant to the Kansas emergency management act within the preceding three years.
Siting, zoning and permitting, Water, cooling and emissions
Dead10 April 2026
KSSB 92Extending the expiration date for provisions that authorize an electric utility to not offer parallel generation service to certain large load customers and exempt certain large load customers from the determination of the utility's peak demand.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Enacted9 April 2026
KSSB 98 †Providing a sales tax exemption for the construction or remodeling of a qualified data center in Kansas and the purchase of data center equipment, eligible data center costs and certain labor costs to qualified firms that commit to a minimum investment of at least $250,000,000…
Tax incentives and clawbacks
Enacted11 April 2025
KYHB 544AN ACT relating to data centers.
Large-load tariffs and cost allocation
In committee10 February 2026
KYHB 593AN ACT relating to data centers.
Large-load tariffs and cost allocation, Tax incentives and clawbacks
Passed chamber31 March 2026
KYHB 701AN ACT relating to blockchain digital assets.
Siting, zoning and permitting
Enacted24 March 2025
KYHB 856AN ACT relating to data centers.
Water, cooling and emissions
In committee10 March 2026
KYHB 937AN ACT relating to high intensity technological infrastructure.
Siting, zoning and permitting, Water, cooling and emissions
In committee11 March 2026
KYSB 319AN ACT relating to data centers.
Siting, zoning and permitting, Water, cooling and emissions
In committee2 March 2026
KYSB 330AN ACT relating to data centers.
Siting, zoning and permitting
In committee2 March 2026
LAHB 1206WATER/DRINKING WATER: Provides relative to permitting and reporting of water usage at data centers
Water, cooling and emissions
In committee1 April 2026
LAHB 922UTILITY/RATES: Provides relative to increases for certain utility rates
Large-load tariffs and cost allocation
In committee9 March 2026
LAHCR 61 †WATER/RESOURCES: Creates a special task force to study the interagency consultation process for data centers to ensure more complete natural resource planning and management
Water, cooling and emissions
Passed chamber9 June 2025
LAHR 20 †WATER/RESOURCES: Urges and requests the Department of Conservation and Energy to study industrial use of water from Caddo Lake
Water, cooling and emissions
Floor vote9 April 2026
LAHR 249 †ENERGY PRODUCTION: Creates a task force to study and recommend policies to promote Small Nuclear Reactors in Louisiana
On-site and co-located generation
Passed both11 June 2025
LASB 490 †ENERGY DEVELOPMENT: Provides for private use electrical networks. (gov sig)Passed committee18 May 2026
LASB 79ECONOMIC DEVELOPMENT: Provides relative to requirements of industrial areas. (8/1/25) (EN NO IMPACT LF RV See Note)Enacted4 June 2025
LASR 174 †ENERGY PRODUCTION: Recreates the Task Force on Energy Infrastructure and Modernization to study polices that promote energy self-generation, industrial microgrids, and expedited permitting in the state of Louisiana.
Siting, zoning and permitting, On-site and co-located generation
Passed both1 June 2026
LASR 195ENERGY PRODUCTION: Creates a task force to study and make recommendations relative to polices that promote energy self-generation, industrial microgrids, and expedited permitting in the state of Louisiana.
Siting, zoning and permitting, On-site and co-located generation
Passed both12 June 2025
MAH 5175An Act relative to energy affordability, clean power and economic competitiveness
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Passed chamber16 July 2026
MAH 83An Act establishing a special legislative commission to study load growth due to AI and data centers
Grid reliability and load flexibility
Companion: MA HD 3378
Passed committee8 January 2026
MAHD 5404An Act relative to the cost of electricity at large and qualified data centers
Large-load tariffs and cost allocation
In committee11 December 2025
MAS 3213Amendment S.3213Introduced23 July 2026
MDHB 1082Large Load Customers - Data Centers and Rate Schedule Requirements
Large-load tariffs and cost allocation
In committee12 February 2026
MDHB 120Moratorium on Construction of New Data Centers - Co-Location and Generation Contingency
Siting, zoning and permitting, On-site and co-located generation
In committee19 January 2026
MDHB 1219Maryland Co-Location Energy Innovation and Reliability Act
On-site and co-located generation, Grid reliability and load flexibility
Companion: MD SB 947
In committee7 February 2025
MDHB 1287Certificate of Public Convenience and Necessity - BURDEN Analysis (CHERISH Our Communities Act)
Siting, zoning and permitting, Grid reliability and load flexibility
Companion: MD SB 780
In committee13 March 2026
MDHB 1338Public Utilities - Certificates of Public Convenience and Necessity - Energy Storage Devices
On-site and co-located generation
In committee7 February 2025
MDHB 1411Data Center Planning and Transparency Act
Water, cooling and emissions, Grid reliability and load flexibility
In committee13 February 2026
MDHB 1532Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) ActEnacted12 May 2026
MDHB 1534Data Centers - Standards for Operation and Siting
Siting, zoning and permitting, Water, cooling and emissions
In committee13 February 2026
MDHB 1595Property Taxes - Authority of Counties to Establish a Subclass and Set a Special Rate for Personal Property of Data Centers
Tax incentives and clawbacks
Companion: MD SB 427
In committee15 February 2026
MDHB 270Data Center Impact Analysis and Report
Water, cooling and emissions, Grid reliability and load flexibility
Companion: MD SB 116
Vetoed16 May 2025
MDHB 560Sales and Use Tax and Property Tax - Exemptions for Data Centers - Repeal
Tax incentives and clawbacks
In committee28 January 2026
MDHB 799Maryland Co-Location Energy Innovation and Reliability Act
On-site and co-located generation, Grid reliability and load flexibility
In committee5 February 2026
MDHB 900Electricity - Data Centers - Rate Schedule and Requirements
Large-load tariffs and cost allocation
In committee4 February 2025
MDHB 940Large Load Customers - Electric System Interconnection and Demand Response Program
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Companion: MD SB 596
In committee10 February 2026
MDHB 949Calvert County - Payment in Lieu of Taxes Agreements - Qualified Data Centers
Tax incentives and clawbacks
In committee4 February 2025
MDSB 1000Certificates of Public Convenience and Necessity and Construction of Data Centers
Siting, zoning and permitting
In committee23 February 2026
MDSB 26Public Utilities - Off-Grid Electricity Providers - Exemption
On-site and co-located generation
In committee9 February 2026
MDSB 853Economic Development Activity - Nondisclosure AgreementsIn committee16 February 2026
MDSB 903Data Centers - Fast Track Pass for Co-Location and Sales and Use Tax
Siting, zoning and permitting, Tax incentives and clawbacks
In committee4 March 2025
MDSB 952Certificate of Public Convenience and Necessity - Overhead Transmission Lines - Grid Enhancing Technologies
Grid reliability and load flexibility
In committee5 February 2025
MDSB 992Public Utilities - Large Load Customers - Registration and Demand Response Program
Grid reliability and load flexibility
In committee6 March 2026
MELD 713An Act Regarding Taxation
Tax incentives and clawbacks
Enacted23 April 2026
MELD 819An Act Concerning The Status Of Battery Storage Systems With Regard To The Business Equipment Tax Exemption
Tax incentives and clawbacks
Enacted1 July 2025
MELD 912An Act To Address The Use Of Electricity By Data Centers
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Enacted23 May 2025
MIHB 4085Land use: zoning and growth management; mining cryptocurrency inside of an area that is zoned for industrial use; allow. Amends 2006 PA 110 (MCL 125.3101 - 125.3702) by adding sec. 515.
Siting, zoning and permitting
In committee1 July 2026
MIHB 4087State finance: other; strategic bitcoin reserve; establish. Amends sec. 351 of 1984 PA 431 (MCL 18.1351) by adding sec. 351a.In committee1 July 2026
MIHB 5396Sales tax: exemptions; data center exemption; eliminate. Amends sec. 25 of 1933 PA 167 (MCL 205.75) & repeals sec. 4ee of 1933 PA 167 (MCL 205.54ee).
Tax incentives and clawbacks
In committee18 December 2025
MIHB 5397Use tax: exemptions; data center exemption; eliminate. Amends sec. 21 of 1937 PA 94 (MCL 205.111) & repeals sec. 4cc of 1937 PA 94 (MCL 205.94cc).
Tax incentives and clawbacks
In committee18 December 2025
MIHB 5398Property tax: exemptions; general property tax act; reflect repeal of data center tax exemptions. Amends sec. 7ff of 1893 PA 206 (MCL 211.7ff). TIE BAR WITH: HB 5396'25, HB 5397'25
Tax incentives and clawbacks
In committee18 December 2025
MIHB 5399Public employees and officers: other; local officials signing nondisclosure agreements related to the construction of data centers; prohibit. Creates new act.
Siting, zoning and permitting
In committee23 December 2025
MIHB 5594Businesses: other; moratorium on certain approvals for and operation of any new data centers; provide for. Creates new act. TIE BAR WITH: HB 5596'26
Siting, zoning and permitting
Companion: MI SB 1018
In committee3 March 2026
MIHB 5595Public utilities: public service commission; moratorium on approvals by the Michigan public service commission of any new enterprise data centers; provide for. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 10ii.
Grid reliability and load flexibility
Companion: MI SB 1020
In committee3 March 2026
MIHB 5596Businesses: other; Michigan zoning enabling act; make subject to the data center regulation act. Amends sec. 205 of 2006 PA 110 (MCL 125.3205). TIE BAR WITH: HB 5594'26
Siting, zoning and permitting
Companion: MI HB 5881, MI HB 6136, MI HB 6388, MI SB 1019, MI SB 1051
In committee3 March 2026
MIHB 5776Property tax: exemptions; exemption of certain facilities of a public university; prohibit if used solely to operate a data center. Amends sec. 7n of 1893 PA 206 (MCL 211.7n).
Tax incentives and clawbacks
In committee15 April 2026
MIHB 5777Businesses: other; large-scale data center life cycle financial responsibility act; create. Creates new act.
Siting, zoning and permitting
In committee15 April 2026
MIHB 5785Use tax: exemptions; compliance with enterprise data center construction labor act; require. Amends sec. 4cc of 1937 PA 94 (MCL 205.94cc). TIE BAR WITH: HB 5786'26, HB 5787'26
Tax incentives and clawbacks
Companion: MI HB 5787, MI HB 5790, MI HB 5791, MI SB 643, MI SB 645
In committee15 April 2026
MIHB 5846Land use: zoning and growth management; zoning overlay districts for data centers; provide for. Creates new act.
Siting, zoning and permitting
In committee23 April 2026
MIHB 5849Businesses: other; cyber-physical security and operational technology protections for data centers; provide for. Creates new act.In committee23 April 2026
MIHB 5882Local government: other; requirements for a moratorium imposed by a local unit of government on large-scale data centers or cryptocurrency mining facilities; provide for. Creates new act. TIE BAR WITH: HB 5881'26
Siting, zoning and permitting
In committee28 April 2026
MIHB 5982Public utilities: other; contracts to service data centers; require to be treated as a contested case. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 6bb.
Large-load tariffs and cost allocation
In committee19 May 2026
MIHB 6135Public utilities: rates; large load commercial rates for data centers; establish. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 10ii. TIE BAR WITH: HB 6140'26, HB 6141'26, HB 6137'26, HB 6138'26, HB 6142'26, HB 6139'26
Large-load tariffs and cost allocation
In committee30 June 2026
MIHB 6137Businesses: other; community benefit agreements; require certain data centers to be subject to. Creates new act. TIE BAR WITH: HB 6135'26, HB 6136'26, HB 6140'26, HB 6141'26, HB 6138'26, HB 6142'26, HB 6139'26
Siting, zoning and permitting
In committee30 June 2026
MIHB 6138Businesses: other; data center water usage requirements; provide for. Creates new act. TIE BAR WITH: HB 6135'26, HB 6140'26, HB 6141'26, HB 6137'26, HB 6142'26, HB 6139'26
Water, cooling and emissions
In committee30 June 2026
MIHB 6139Construction: permits; acoustic engineering report for data center; require to receive building permit. Amends 1972 PA 230 (MCL 125.1501 - 125.1531) by adding sec. 10a. TIE BAR WITH: HB 6135'26, HB 6140'26, HB 6141'26, HB 6137'26, HB 6138'26, HB 6142'26
Siting, zoning and permitting
In committee30 June 2026
MIHB 6140Public employees and officers: other; nondisclosure agreements related to the construction of data centers; prohibit. Creates new act. TIE BAR WITH: HB 6135'26, HB 6141'26, HB 6137'26, HB 6138'26, HB 6142'26, HB 6139'26
Siting, zoning and permitting
In committee30 June 2026
MIHB 6142Businesses: other; requirements for data center decommissioning, dismantling, and remediation; provide for. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 10jj. TIE BAR WITH: HB 6135'26, HB 6140'26, HB 6141'26, HB 6137'26, HB 6138'26, HB 6139'26
Siting, zoning and permitting
In committee30 June 2026
MIHB 6251 †Businesses: other; energy infrastructure and thermal management evaluation requirements for certain data centers; provide for. Creates new act.
Water, cooling and emissions, Grid reliability and load flexibility
In committee27 August 2026
MIHB 6252Businesses: other; thermal impact assessment requirements for certain data centers; provide for. Creates new act.
Water, cooling and emissions
In committee27 August 2026
MIHB 6264 †Businesses: other; clean and renewable energy requirements for data centers; provide for. Creates new act.
On-site and co-located generation, Grid reliability and load flexibility
In committee27 August 2026
MIHB 6265 †Businesses: other; water and electricity usage reporting requirements for data centers; provide for. Creates new act.
Water, cooling and emissions
In committee27 August 2026
MIHB 6391 †Businesses: other; siting requirements for certain data centers; provide for. Creates new act. TIE BAR WITH: HB 6388'26
Siting, zoning and permitting
In committee29 September 2026
MIHB 6426 †Businesses: other; data center local decision protection act; create. Creates new act. TIE BAR WITH: HB 6427'26
Siting, zoning and permitting
In committee1 October 2026
MIHB 6427 †Businesses: other; Michigan zoning enabling act; make subject to the data center local decision protection act. Amends secs. 205 & 606 of 2006 PA 110 (MCL 125.3205 & 125.3606). TIE BAR WITH: HB 6426'26
Siting, zoning and permitting
In committee1 October 2026
MIHR 240A resolution to urge a temporary pause on discretionary state-level incentives for data center construction, request a comprehensive review of the fiscal, utility, environmental, and local governance impacts of data center development in Michigan, and direct House committees to…
Tax incentives and clawbacks, Grid reliability and load flexibility
In committee4 February 2026
MISB 1047Public utilities: rates; separate rate class for large-load customers; require. Amends 1939 PA 3 (MCL 460.1 - 460.11) by adding sec. 10ii.
Large-load tariffs and cost allocation
In committee10 September 2026
MISB 1049Public employees and officers: other; certain nondisclosure agreements; prohibit. Creates new act.In committee10 September 2026
MISB 1050Businesses: other; community benefit agreements; require certain data centers to be subject to. Creates new act.
Siting, zoning and permitting
In committee10 September 2026
MISB 1179 †Energy: other; reporting requirements for data centers; provide for. Creates new act.
Water, cooling and emissions
In committee10 September 2026
MISB 762Energy: other; energy and water usage report requirements for data centers; provide for. Amends sec. 5a of 1939 PA 3 (MCL 460.5a).
Water, cooling and emissions
In committee1 July 2026
MNHF 3793Certain users of large amounts of groundwater required to apply for their own water-use permit instead of modifying an existing municipal permit.
Water, cooling and emissions
Companion: MN SF 3852
In committee13 May 2026
MNHF 4153Criteria for preapplication evaluations of water appropriations for data centers modified, data centers' electricity sales exempted in calculating a utility's solar energy standard, and data centers exempted from paying sales tax on electricity purchases.
Tax incentives and clawbacks, Water, cooling and emissions
Companion: MN HF 4990, MN SF 4681, MN SF 5100
In committee12 March 2026
MNHF 4173Certain defined terms maintained, and data center exemptions modified.
Tax incentives and clawbacks
Companion: MN SF 4203
In committee6 May 2026
MNHF 4703Funding for study evaluating the potential to construct nuclear-powered electric generating facilities provided, and money appropriated.
On-site and co-located generation
Companion: MN SF 4900
In committee16 May 2026
MNHF 4888New data center moratorium established, and Public Utility Commission required to submit a report.
Siting, zoning and permitting, Grid reliability and load flexibility
Companion: MN SF 4298
In committee5 May 2026
MNHF 5125Data centers sales and use tax exemption repealed, and contingent reduction in special education aid appropriations repealed.
Tax incentives and clawbacks
Companion: MN SF 5231
In committee17 May 2026
MNSF 1393Data center energy generation redundancy establishment
On-site and co-located generation
Companion: MN HF 2928, MN HF 3296, MN HF 3304, MN SF 3444
Passed committee28 April 2025
MNSF 19Requirements governing data centers modifications
Siting, zoning and permitting
Introduced9 June 2025
MNSF 3968Data centers provisions modification
Tax incentives and clawbacks
In committee26 February 2026
MNSF 4296Public hearings and certain disclosures prior to approval of data center development requirement
Siting, zoning and permitting, Water, cooling and emissions
Companion: MN HF 4512
Passed committee18 March 2026
MNSF 4548Ban local elected officials from entering certain nondisclosure agreements
Water, cooling and emissions
Companion: MN HF 4814, MN HF 4915, MN SF 5062
Passed committee25 March 2026
MNSF 4816 †Environmental impact statement for data centers requirement provision
Siting, zoning and permitting, Water, cooling and emissions
In committee25 March 2026
MNSF 4901Nuclear power inclusion as an optional resource in a utility's integrated resource plan requirement provision and state application for nuclear-powered electric generating plants requirement provision
On-site and co-located generation
In committee26 March 2026
MOHB 2239Creates the Artificial Intelligence Data Center Environmental Accountability Act
Water, cooling and emissions
In committee15 May 2026
MOHB 3369 †Prohibits the issuance of permits for construction of data centers for one year in St. Louis
Siting, zoning and permitting
In committee15 May 2026
MOHB 3390Creates new provisions related to the construction of data centers
Siting, zoning and permitting, Tax incentives and clawbacks
In committee15 May 2026
MOSB 1730Modifies provisions relating to the Missouri Technology Corporation
Tax incentives and clawbacks
In committee7 May 2026
MOSB 1750Creates provisions relating to the regulation of large load electric customers
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee7 May 2026
MSHB 1239Data center enterprises; revise certain definitions and other provisions relating to tax exemptions.
Tax incentives and clawbacks
Passed chamber29 March 2025
MSSB 3168Data center enterprises; revise certain definitions and other provisions relating to tax exemptions.
Tax incentives and clawbacks
Passed chamber18 March 2025
MTHB 263Generally revise digital asset mining and data center ratemaking laws
Large-load tariffs and cost allocation
Dead20 May 2025
MTHB 424Revise taxes for class 17 data center property
Tax incentives and clawbacks
Companion: MT SB 540
Enacted19 May 2025
MTHB 877Establish the Montana data center development act
Siting, zoning and permitting, Tax incentives and clawbacks
Dead20 May 2025
MTHJ 46Study resolution on data centersDead22 May 2025
MTLC 1870 †Revise property taxation of data centers
Tax incentives and clawbacks
Dead27 May 2025
MTLC 2604Establish the Montana data center development act
Siting, zoning and permitting, Tax incentives and clawbacks
Introduced25 March 2025
MTLC 3009Revise taxes for class 17 data center property
Tax incentives and clawbacks
Introduced5 February 2025
MTLC 4025 †Generally revise the taxation of data centers
Tax incentives and clawbacks
Dead22 May 2025
MTLC 636Generally revise digital asset mining and data center ratemaking laws
Large-load tariffs and cost allocation
Introduced13 January 2025
MTLC 933Study resolution on data centersIntroduced26 March 2025
MTLC 982Revise taxation of class 17 property
Tax incentives and clawbacks
Introduced24 March 2025
NCHB 1002Rate Payer Protection Act.
Large-load tariffs and cost allocation
In committee14 April 2025
NCHB 1063Ratepayer and Resource Protection Act.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee28 April 2026
NCHB 1180Data Center Amendments.
Tax incentives and clawbacks
In committee4 May 2026
NCHB 1189Datacenter Transparency Act.
Water, cooling and emissions
In committee5 May 2026
NCHB 1192Energy and Housing Affordability Act.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee7 May 2026
NCHB 1213 †Protect Taxpayers and Local Governments.
Tax incentives and clawbacks
Passed committee30 June 2026
NCHB 638Equitable Escalation of Electricity Demand Act.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee2 April 2025
NCSB 1026Power Bill Protection/Large Load Tariff.
Large-load tariffs and cost allocation
In committee5 May 2026
NCSB 844Affordable Energy Omnibus.In committee28 April 2026
NDHB 1239A BILL for an Act to create and enact a new section to chapter 11-33, a new section to chapter 40-47, a new chapter to title 51, and a new section to chapter 58-03 of the North Dakota Century Code, relating to blockchain technology and protection for digital asset mining.
Siting, zoning and permitting
Passed committee17 February 2025
NDHB 1427A BILL for an Act to amend and reenact sections 49-22-02, 49-22-03, 49-22-07, 49-22-07.2, 49-22-08, 49-22-08.2, 49-22-09, 49-22-09.2, 49-22-14, 49-22-16, 49-22-20, 49-22-21, 49-22-22, 49-22-24, and 49-22-25 of the North Dakota Century Code, relating to authorization for the…
Siting, zoning and permitting
Introduced17 January 2025
NDHB 1579AN ACT to provide for a legislative management study relating to the impact of large energy consumers on the state's electrical grid.
Grid reliability and load flexibility
Enacted30 April 2025
NDSB 2406A BILL for an Act to create and enact chapter 44-04.1 of the North Dakota Century Code, relating to prohibiting agencies from entering nondisclosure agreements concerning data centers and industrial projects; to provide a penalty; to provide an effective date; and to provide an…
Water, cooling and emissions
Passed committee3 September 2026
NELB 1010Adopt the Large Load Customer Regulation Act, provide for eminent domain relating to energy storage and regulation and taxation of energy storage resources, and change provisions relating to cryptocurrency mining operations and data centers
Large-load tariffs and cost allocation
Enacted17 April 2026
NELB 1064Adopt the Large Load Customer Regulation Act
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Dead17 April 2026
NELB 1111Require an annual data center load report to the Nebraska Power Review Board, provide powers and duties for public power suppliers, allow and require regulation of data centers, and change provisions relating to regulation of cryptocurrency mining operations
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Dead17 April 2026
NELB 1131Adopt the Domestic Violence and Human Trafficking Service Providers Tax Credit Act and eliminate personal property tax and sales and use tax exemptions relating to data centers
Tax incentives and clawbacks
Dead17 April 2026
NELB 1193Provide regulation of and requirements for energy storage resources and change provisions relating to property tax exemptions and the nameplate capacity tax
Tax incentives and clawbacks, On-site and co-located generation
Dead17 April 2026
NELB 1204Adopt the Nameplate Capacity Tax Facility Standards Act and change provisions relating to property tax exemptions and the nameplate capacity tax
Tax incentives and clawbacks
Dead17 April 2026
NELB 1259Adopt the Grid Modernization Act
Grid reliability and load flexibility
Dead17 April 2026
NELB 526Provide powers and duties for public power districts related to cryptocurrency mining operations
Large-load tariffs and cost allocation, Siting, zoning and permitting
Enacted21 May 2025
NHHB 1265prohibiting the construction of data centers in the state and establishing a committee to study the environmental impact of data centers.
Siting, zoning and permitting, Water, cooling and emissions
Dead11 March 2026
NHHB 1666requiring capacity planning in the state 10-year energy strategy.
Grid reliability and load flexibility
Dead5 March 2026
NHHB 1722relative to consumer protections and energy classifications for large-use electric facilities.
Large-load tariffs and cost allocation
Dead12 March 2026
NHHB 1724relative to public transparency of electric utility retail charges and cost reporting for transmission, wholesale electricity, capacity, and generation adequacy.
Large-load tariffs and cost allocation
Dead25 February 2026
NHHB 1739relative to energy infrastructure, economic development, and workforce training for large-scale data facilities.
Large-load tariffs and cost allocation, Siting, zoning and permitting, Tax incentives and clawbacks
Dead19 February 2026
NHSB 439relative to municipal data center zoning.
Siting, zoning and permitting
Dead20 August 2026
NJA 2491Concerns electricity load forecasting.
Grid reliability and load flexibility
In committee13 January 2026
NJA 2770Establishes surcharge for electric public utility service to certain data centers during certain periods; establishes "Grid Modernization Fund" in BPU.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee13 January 2026
NJA 2774Prohibits agreements intended to conceal certain information concerning development of data centers under MLUL.
Siting, zoning and permitting
In committee13 January 2026
NJA 3611Requires payment of prevailing wage for certain data center construction.In committee13 January 2026
NJA 3966Requires DEP to conduct study of short and long term effects of water use by large-scale data centers.
Water, cooling and emissions
Passed chamber29 October 2026
NJA 4096Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.
Water, cooling and emissions
Passed committee30 June 2026
NJA 4696Requires owner or operator of data center to submit water and energy usage report to BPU.
Water, cooling and emissions
In committee16 March 2026
NJA 4710"Clean Energy AI Incentivization Act"; directs BPU to incentivize artificial intelligence centers to bring their own self-sufficient, clean energy.
Tax incentives and clawbacks, On-site and co-located generation
In committee16 March 2026
NJA 4769Requires certain State agencies to establish expedited approval and permitting procedures for artificial intelligence data centers powered by small modular nuclear reactors.
Siting, zoning and permitting, On-site and co-located generation
In committee19 March 2026
NJA 4801Establishes certain protections against demand by large-load addition customers in State.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Passed chamber28 September 2026
NJA 4945Requires BPU to conduct study on environmental, infrastructural, and financial impacts of data center development in State.
Large-load tariffs and cost allocation, Water, cooling and emissions, Grid reliability and load flexibility
In committee7 May 2026
NJA 5165"End Data Center Tax Credits Act"; reduces tax credits available for Next New Jersey Program.*
Tax incentives and clawbacks
Passed committee30 June 2026
NJA 5224Requires data center developers to disclose certain information to public and elected officials before preliminary site plan consideration under MLUL.
Siting, zoning and permitting, Water, cooling and emissions
In committee8 June 2026
NJA 5294"Responsible Data Center Development and Resource Protection Act"; establishes Statewide framework concerning siting, land use approval, energy sourcing, water use, and environmental impacts of large load data center development.
Siting, zoning and permitting, Water, cooling and emissions
Companion: NJ S 4402
In committee18 June 2026
NJA 5373Concerns noise abatement of data centers.
Siting, zoning and permitting
In committee10 September 2026
NJA 5396Requires data centers to submit water supply emergency contingency plan to DEP.
Water, cooling and emissions
In committee10 September 2026
NJA 5397Requires data centers to submit construction phase water usage plan to DEP.
Water, cooling and emissions
In committee10 September 2026
NJA 5462Requires electric public utilities to develop and apply special rules for large load customers to protect non-large load customers from increased costs.**
Large-load tariffs and cost allocation
Passed chamber12 January 2026
NJA 5466Requires BPU to study effects of data centers on electricity costs.*
Large-load tariffs and cost allocation
Enacted8 July 2025
NJA 5482Establishes six month moratorium on approvals, construction, expansion, subsidies, and tax incentives for certain artificial intelligence data centers; creates Artificial Intelligence Data Center Impact Commission.
Siting, zoning and permitting, Tax incentives and clawbacks
In committee14 September 2026
NJA 5548Requires owner or operator of data center to submit water and energy usage report to BPU.
Water, cooling and emissions
Passed committee30 June 2025
NJA 5564Requires submission of energy usage plan to BPU for proposed artificial intelligence data centers; requires all electricity for artificial intelligence data centers to be derived from new clean energy sources.
Siting, zoning and permitting, Grid reliability and load flexibility
In committee10 April 2025
NJA 5586Requires data center developers to provide certain notice to public before preliminary site plan consideration and hearing under MLUL; requires DCA to maintain related public notice website.
Siting, zoning and permitting
In committee5 October 2026
NJA 5646Requires data centers to submit annual report to DEP; requires DEP to establish Data Center Transparency Dashboard.In committee19 October 2026
NJA 5662Establishes Energy Facilities Siting Commission.
Siting, zoning and permitting
In committee8 May 2025
NJA 5663Requires DEP to conduct study on environmental impacts of data center development in State; prohibits construction of new data centers until study is complete.
Siting, zoning and permitting, Water, cooling and emissions
Companion: NJ S 4659
In committee19 October 2026
NJA 5729 †Requires certain State agencies to establish expedited approval and permitting procedures for artificial intelligence data centers that bring their own power.
Siting, zoning and permitting, On-site and co-located generation
In committee29 October 2026
NJA 5892Requires DEP to conduct study of short and long term effects of water use by large-scale data centers.
Water, cooling and emissions
In committee27 June 2025
NJA 5898Requires BPU to study potential deployment of advanced transmission technologies in NJ.Passed committee18 December 2025
NJA 6040Establishes surcharge for electric public utility service to certain data centers during certain periods; establishes "Grid Modernization Fund" in BPU.
Large-load tariffs and cost allocation
In committee17 November 2025
NJA 6122Prohibits BPU from retiring electric generation facilities in certain circumstances.
On-site and co-located generation, Grid reliability and load flexibility
In committee24 November 2025
NJA 6156Concerns electricity load forecasting.
Grid reliability and load flexibility
In committee5 January 2026
NJA 6181Prohibits agreements intended to conceal certain information concerning the development of data centers under MLUL.
Siting, zoning and permitting
In committee8 December 2025
NJA 6237Requires payment of prevailing wage for certain data center construction.Passed committee12 January 2026
NJA 796Requires electric public utilities to develop and apply special rules for certain data centers to protect non-data center customers from increased costs.**
Large-load tariffs and cost allocation
Enacted7 July 2026
NJAR 188Urges Governor to declare energy generation emergency in New Jersey.
On-site and co-located generation
In committee8 May 2025
NJAR 93Urges Governor to declare energy generation emergency in New Jersey.
On-site and co-located generation
Companion: NJ SR 34
In committee13 January 2026
NJS 1213Establishes NJ Water Data Center at public institution of higher education; appropriates $1 million.In committee13 January 2026
NJS 2274Requires owner or operator of data center to submit water and energy usage report to BPU.
Water, cooling and emissions
In committee13 January 2026
NJS 3370"Load Forecast Accountability Act"; requires BPU to review electricity load forecasting in State.
Grid reliability and load flexibility
In committee5 February 2026
NJS 3379Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.
Water, cooling and emissions
Enacted27 August 2026
NJS 3611Directs planning boards to submit certain data center development plans to BPU and State Planning Commission and requires State Planning Commission approval for data center development under MLUL; excludes data centers from economic development subsidies.
Siting, zoning and permitting, Tax incentives and clawbacks
In committee19 February 2026
NJS 3623Establishes Fusion Energy and Technology Incentive Program in EDA to encourage use of power plants for fusion energy and technology purposes; authorizes funds in Global Warming Solutions Fund to support fusion energy and technology facilities.
On-site and co-located generation
In committee19 February 2026
NJS 3639Requires BPU, DCA, and DEP to establish expedited approval and permitting procedures for artificial intelligence data centers powered by small modular nuclear reactors.
Siting, zoning and permitting, On-site and co-located generation
In committee24 February 2026
NJS 3784Concerns electricity load forecasting.
Grid reliability and load flexibility
In committee5 March 2026
NJS 4062Establishes certain protections against demand by large-load addition customers in State.
Large-load tariffs and cost allocation
In committee23 March 2026
NJS 4143Requires energy usage plan for proposed artificial intelligence data centers and cryptocurrency mining facilities; requires all electricity for artificial intelligence data centers and cryptocurrency mining facilities to be derived from new clean energy sources.*
On-site and co-located generation, Grid reliability and load flexibility
Passed committee2 June 2025
NJS 4293Requires owner or operator of data center to submit water and energy usage report to BPU.
Water, cooling and emissions
Vetoed20 October 2025
NJS 4304Prohibits agreements intended to conceal certain information concerning development of data centers under MLUL.
Siting, zoning and permitting
Passed chamber29 October 2026
NJS 4307Requires electric public utilities to develop and apply special rules for large load customers to protect non-large load customers from increasaed costs.**
Large-load tariffs and cost allocation
Passed committee12 January 2026
NJS 4318Requires BPU to study effects of data centers on electricity costs.*
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Passed committee2 June 2025
NJS 4390"End Data Center Tax Credits Act"; reduces tax credits available for Next New Jersey Program.*
Tax incentives and clawbacks
Enacted27 August 2026
NJS 4400Requires DEP to conduct study of short and long term effects of water use by large-scale data centers.
Water, cooling and emissions
Passed committee8 October 2026
NJS 4401Requires BPU to conduct study on environmental, infrastructural, and financial impacts of data center development in State.
Water, cooling and emissions, Grid reliability and load flexibility
In committee4 June 2026
NJS 4561"Grid Reliability Protection Act"; prohibits State agencies from decommissioning electric generation facilities in State under certain circumstances.
Grid reliability and load flexibility
In committee2 June 2025
NJS 4657Modifies certain DEP permit application requirements for data centers.
Siting, zoning and permitting
In committee1 October 2026
NJS 4658Requires data centers to submit annual report to DEP; requires DEP to establish Data Center Transparency Dashboard.
Water, cooling and emissions
In committee1 October 2026
NJS 4811Requires BPU, DCA, and DEP to establish expedited approval and permitting procedures for artificial intelligence data centers powered by small modular nuclear reactors.
Siting, zoning and permitting, On-site and co-located generation
In committee6 November 2025
NJS 4827Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.
Water, cooling and emissions
In committee6 November 2025
NJS 4876"New Jersey Energy Reliability and Affordability Act"; establishes advanced nuclear reactor, distributed energy storage, and demand optimization programs in BPU.
On-site and co-located generation, Grid reliability and load flexibility
Passed committee1 December 2025
NJS 4881 †Establishes Data Center Community Intervenor Compensation Grant Program and fund in DCA to provide financial assistance for certain data center-related services; appropriates $10 million.Introduced-
NJS 4883 †Requires data center developers to provide certain notice to public before preliminary site plan consideration and hearing under MLUL; requires DCA to maintain related public notice website.
Siting, zoning and permitting
Introduced-
NJS 4889 †Concerns noise abatement of data centers.
Siting, zoning and permitting, Tax incentives and clawbacks
Introduced-
NJS 4928Requires payment of prevailing wage for certain data center construction.Passed chamber12 January 2026
NJS 4938"Load Forecast Accountability Act"; requires BPU to review electricity load forecasting in State.
Grid reliability and load flexibility
In committee4 December 2025
NJS 5003Prohibits agreements intended to conceal certain information concerning the development of data centers under MLUL.
Siting, zoning and permitting
In committee15 December 2025
NJS 680Requires energy usage plan for proposed artificial intelligence data centers and cryptocurrency mining facilities; requires all electricity for artificial intelligence data centers and cryptocurrency mining facilities to be derived from new clean energy sources.
Siting, zoning and permitting, Water, cooling and emissions
Companion: NJ A 1170
Passed committee16 March 2026
NJS 731Requires electric public utilities to develop and apply special rules for large load customers to protect non-large load customers from increased costs.*
Large-load tariffs and cost allocation
Passed committee30 June 2026
NMHB 311VIRTUAL POWER PLANT ACT
Grid reliability and load flexibility
Passed committee24 March 2026
NMHM 6PRIVATE EQUITY INFRASTRUCTURE OWNERSHIPIn committee24 March 2026
NYA 10049Establishes a grid modernization surcharge
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Companion: NY S 8546
In committee30 January 2026
NYA 10141Imposes a moratorium on data center permit issuance; and relates to data center rate impacts
Large-load tariffs and cost allocation, Siting, zoning and permitting
Companion: NY S 9144
In committee12 May 2026
NYA 10216 †Repeals paragraph 37 of subdivision (a) of section 1115 of the tax law and subdivision (y) of section 1115 of the tax law relating to sale and use taxes with respect to data centers
Tax incentives and clawbacks
Companion: NY S 9288
In committee12 February 2026
NYA 10852Enacts the stop subsidizing data centers act
Siting, zoning and permitting, Tax incentives and clawbacks
Companion: NY S 9182
In committee21 May 2026
NYA 11419Relates to establishing guidelines for the connection of utility service for high-usage customers
Large-load tariffs and cost allocation, Water, cooling and emissions
In committee15 May 2026
NYA 11560Enacts the responsible data center development act
Large-load tariffs and cost allocation, Siting, zoning and permitting
Companion: NY S 10642
Passed chamber4 June 2026
NYA 5353Extends the the moratorium on air permit issuance and renewal for certain electric generating facilities
On-site and co-located generation, Water, cooling and emissions
In committee16 July 2025
NYA 9039Establishes the "accountability of costs for data centers act"
Large-load tariffs and cost allocation
Companion: NY S 8540
In committee1 June 2026
NYA 9064Prohibits electric corporations and gas corporations from increasing charges due to the building or operation of a data center
Large-load tariffs and cost allocation
Companion: NY S 8536
In committee7 January 2026
NYA 9086Relates to the regulation of energy consumption by data centers
Water, cooling and emissions
Companion: NY S 6394
In committee1 June 2026
NYA 9107Directs the public service commission to provide a class of service for facilities that use large amounts of energy; and repeals certain provisions upon the expiration thereof
Large-load tariffs and cost allocation
In committee7 January 2026
NYA 9136Requires new data centers to incorporate thermal energy networks
Siting, zoning and permitting, Water, cooling and emissions
In committee7 January 2026
NYA 9138Imposes an excise tax on energy used in digital asset mining using proof-of-work authentication methods
Companion: NY S 8518
In committee7 January 2026
NYA 9297Provides a host community benefit for customers in a host community where data centers are expanded or placed
Large-load tariffs and cost allocation
Companion: NY S 10546
Passed chamber18 May 2026
NYS 10487Enacts the "data center water stewardship and reuse act"
Water, cooling and emissions
In committee15 May 2026
NYS 3347Directs the New York state energy research and development authority to conduct a study on powering cryptocurrency mining facilities with renewable energyIn committee7 January 2026
NYS 7429Relates to establishing the energy performance benchmarking program
Water, cooling and emissions
In committee16 April 2025
NYS 8037Establishes a datacenter utility rate classification, providing targeted congestion management incentives for upstate New York, and regulating off-grid power connections for datacenter operations
Large-load tariffs and cost allocation, On-site and co-located generation
In committee7 January 2026
NYS 8645Authorizes ORES to issue siting permits for battery energy storage systems for use by data centers, and requires data centers to submit carbon reduction plans
On-site and co-located generation, Water, cooling and emissions
In committee7 January 2026
OHHB 142Regards natural gas company rate plans, property valuation
Large-load tariffs and cost allocation
In committee5 March 2025
OHHB 646Create the Data Center Study CommissionPassed chamber10 June 2026
OHHB 706Impose certain minimum requirements on data center customers
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee25 February 2026
OHHB 710Prohibit public support, limit construction of, new data centers
Large-load tariffs and cost allocation, Siting, zoning and permitting
In committee25 February 2026
OHHB 784Require data center water consumption reports
Water, cooling and emissions
In committee25 March 2026
OHHB 957Prohibit new data center sales tax exemptions from being granted
Tax incentives and clawbacks
Companion: OH SB 374
In committee3 June 2026
OHHB 983 †Enact the Data Center Accountability and Citizen Protection Act
Siting, zoning and permitting, Water, cooling and emissions
Introduced28 July 2026
OHHB 999 †Prohibit property tax exemptions for data centers
Tax incentives and clawbacks
Introduced2 September 2026
OHSB 103Allow alternative rate plans for certain natural gas companies
Large-load tariffs and cost allocation
Enacted20 March 2026
OHSB 378Enact the Responsible Water Use by Data Centers Act
Water, cooling and emissions
In committee25 March 2026
OHSB 381Require PUCO approval to connect data centers to electrical grid
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee25 March 2026
OKHB 1919 †Data centers; Data Centers Act of 2025; effective date.
Companion: OK HB 1920
In committee4 February 2025
OKHB 2992Corporation Commission; creating the Data Center Customer Ratepayer Protection Act of 2026; effective date; emergency.
Large-load tariffs and cost allocation
Enacted11 May 2026
OKHB 3392Oklahoma Corporation Commission; defining term; requiring Oklahoma Corporation Commission conduct certain study; effective date.
Grid reliability and load flexibility
Passed committee11 February 2026
OKHB 3394Hyperscale data centers; Oklahoma Hyperscale Data Center Directory Act; Oklahoma Corporation Commission; directory; electrical utilities; water providers; effective date.
Water, cooling and emissions, Grid reliability and load flexibility
In committee12 February 2026
OKHB 3397Data centers; defining terms; requiring Corporation Commission provide for certain classification of service; effective date.
Large-load tariffs and cost allocation
In committee3 February 2026
OKHB 3724Public utilities; defining terms; stating applicability to high-demand facilities with certain electricity requirements; emergency.
Large-load tariffs and cost allocation
In committee17 February 2026
OKHB 3917Public utilities; defining terms; requiring certain public utilities to make certain filing with Corporation Commission; effective date.
Grid reliability and load flexibility
In committee16 February 2026
OKHB 4194Data centers; Data Center Decommissioning Act; proper decommissioning; Oklahoma Corporation Commission; financial assurance; effective date.
Siting, zoning and permitting
In committee3 February 2026
OKHB 4219Data centers; Data Centers Act of 2026; effective date.In committee9 February 2026
OKHB 4424Revenue and taxation; ad valorem; exemption; manufacturing facilities; data center; effective date.
Tax incentives and clawbacks
In committee3 February 2026
OKSB 1488Corporation Commission; establishing moratorium; requiring certain study.
Siting, zoning and permitting, Grid reliability and load flexibility
In committee14 April 2026
OKSB 1619Nondisclosure agreements; prohibiting municipalities from entering into certain agreements; providing certain exceptions.
Siting, zoning and permitting
Passed committee3 March 2026
OKSB 1706Foreign ownership of land; prohibiting foreign principals from renting, leasing, or having a controlling interest in data centers. Effective date.
Siting, zoning and permitting
In committee3 February 2026
ORHB 3546 †Relating to large energy use facilities; and declaring an emergency.
Large-load tariffs and cost allocation
Enacted7 July 2025
ORHB 3698Relating to data centers.
Water, cooling and emissions
In committee28 June 2025
ORSB 553 †Relating to data center power usage.
Grid reliability and load flexibility
In committee28 June 2025
PAHB 1210An Act providing for reporting requirements for qualifying crypto-asset mining operations and for an impact study; and imposing duties on the Department of Environmental Protection.
Water, cooling and emissions, Grid reliability and load flexibility
Passed committee23 April 2025
PAHB 1667 †An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, providing for residential clean energy tax credit; repealing provisions relating to Pennsylvania Economic Development for a Growing Economy (PA EDGE) Tax Credits; providing for…
Large-load tariffs and cost allocation, Tax incentives and clawbacks
Passed chamber19 October 2026
PAHB 1834An Act providing for the regulation of commercial data centers; imposing duties on the Pennsylvania Public Utility Commission, the Department of Human Services and the Pennsylvania Energy Development Authority; establishing the Data Center Low-Income Home Energy…
Large-load tariffs and cost allocation, On-site and co-located generation, Grid reliability and load flexibility
Passed chamber31 March 2026
PAHB 2061An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in computer data center equipment incentive program, further providing for application for certification and for eligibility requirements.
Tax incentives and clawbacks
In committee3 December 2025
PAHB 2150An Act providing for annual reporting of energy consumption and water consumption by data centers; and imposing a penalty.
Water, cooling and emissions
Passed chamber23 April 2026
PAHB 2151 †An Act amending Title 53 (Municipalities Generally) of the Pennsylvania Consolidated Statutes, providing for data center ordinance assistance.
Siting, zoning and permitting
Passed chamber23 April 2026
PAHB 2153 †An Act amending the act of June 27, 2006 (1st Sp.Sess., P.L.1873, No.1), known as the Taxpayer Relief Act, in taxation by school districts, further providing for definitions, providing for disposition of data center property tax revenue and further providing for school district…
Tax incentives and clawbacks
In committee21 January 2026
PAHB 2198An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, repealing provisions relating to Computer Data Center Equipment Incentive Program; and, in general provisions, providing for data centers.
Tax incentives and clawbacks
Passed chamber26 June 2026
PAHB 2246 †An Act amending Title 27 (Environmental Resources) of the Pennsylvania Consolidated Statutes, in water resources planning, further providing for State water plan and providing for covered data centers; and promulgating regulations.
Water, cooling and emissions
Passed chamber1 May 2026
PAHB 2359 †An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in computer data center equipment incentive program, further providing for definitions, for application for certification, for eligibility requirements relating to sales and use tax…
Tax incentives and clawbacks
Passed chamber10 July 2026
PAHB 2496 †An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, providing for pause on data center proposals.
Siting, zoning and permitting
Passed chamber30 June 2026
PAHB 2515An Act providing for commercial data center transparency regarding energy use, water use and noise pollution; imposing duties on the Department of Environmental Protection, the Department of Transportation and the Office of Attorney General; and imposing civil penalties.
Water, cooling and emissions
In committee13 May 2026
PAHB 2516An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, further providing for definitions; in comprehensive plan, providing for comprehensive plan element for commercial data centers; and, in…
Siting, zoning and permitting
In committee13 May 2026
PAHB 2532An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, repealing provisions relating to computer data center equipment incentive program; in general provisions, providing for transfer of tax from certain sale of computer data equipment; and…
Tax incentives and clawbacks
Companion: PA SB 1344
In committee27 May 2026
PAHB 2535 †An Act providing for the public safety regulation of large load users; requiring the submission of emergency operations plans and generalized infrastructure inventories as a condition of occupancy; protecting confidential security information; and providing for enforcement and…
Grid reliability and load flexibility
Passed chamber13 October 2026
PAHB 2539 †An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in Computer Data Center Equipment Incentive Program, further providing for application for certification, for eligibility requirements relating to Sales and Use Tax Refund Program and…
Tax incentives and clawbacks
In committee27 May 2026
PAHB 2588An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, further providing for definitions; and, in zoning, further providing for ordinance provisions.
Siting, zoning and permitting
In committee2 June 2026
PAHB 2650An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in tax credit and tax benefit administration, further providing for definitions; in computer data center equipment incentive program, providing for certification prohibition; providing…
Tax incentives and clawbacks
Companion: PA SB 1384
Passed chamber25 June 2026
PAHB 2760 †An Act providing for the protection of water supplies by requiring commercial data centers to restore or replace a polluted or diminutive water supply; and imposing duties on the Department of Environmental Protection.
Water, cooling and emissions
In committee9 September 2026
PAHB 2775An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, further providing for definitions; and, in zoning, further providing for ordinance provisions.
Siting, zoning and permitting
Passed committee30 September 2026
PAHB 2821An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, further providing for definitions; and, in subdivision and land development, providing for local option for high impact data centers.
Siting, zoning and permitting
In committee2 October 2026
PASB 1114An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for large load customers; and making editorial changes.
Large-load tariffs and cost allocation
In committee15 December 2025
PASB 1297An Act amending the act of March 4, 1971 (P.L.6, No.2), known as the Tax Reform Code of 1971, in Computer Data Center Equipment Incentive Program, further providing for application for certification and for separation of facilities, providing for additional eligibility…
Tax incentives and clawbacks
In committee23 April 2026
PASB 1323An Act providing for the regulation of commercial data centers; imposing duties on the Pennsylvania Public Utility Commission, the Department of Human Services and the Pennsylvania Energy Development Authority; establishing the Data Center Low-Income Home Energy Assistance…
On-site and co-located generation, Water, cooling and emissions, Grid reliability and load flexibility
In committee20 May 2026
PASB 1345An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in zoning, providing for optional temporary moratorium on acceptance or consideration of new applications for high impact data centers.
Siting, zoning and permitting
Companion: PA HB 2533
Passed committee30 September 2026
PASB 1359An Act imposing a Statewide moratorium on hyperscale data center development and permitting; and providing for enforcement.
Siting, zoning and permitting
In committee4 June 2026
PASB 1408An Act providing for data center transparency; prohibiting certain nondisclosure agreements between public agencies and data centers; providing for data centers and public input; prohibiting data centers from being developed or operated by certain foreign entities; and providing…
Siting, zoning and permitting, Water, cooling and emissions
Passed committee5 October 2026
PASB 1442An Act prohibiting data centers from being developed or operated by certain foreign entities; and providing for enforcement by Attorney General.In committee25 September 2026
PASB 1455 †An Act amending Title 53 (Municipalities Generally) of the Pennsylvania Consolidated Statutes, in general provisions relating to government and administration, providing for pre-application procedure for a proposed data center.
Siting, zoning and permitting
In committee24 September 2026
PASB 1459An Act requiring proposed data centers to conduct water usage studies.
Water, cooling and emissions
In committee24 September 2026
PASB 1460An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in zoning, prohibiting the location of data centers.
Siting, zoning and permitting
In committee24 September 2026
PASB 1461An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, further providing for definitions; and, in zoning, providing for hyperscale data centers and public input.
Siting, zoning and permitting
In committee24 September 2026
PASB 1469An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in rates and distribution systems, providing for large load hyperscale data center tariffs.
Large-load tariffs and cost allocation
In committee24 September 2026
PASB 1470An Act amending Title 27 (Environmental Resources) of the Pennsylvania Consolidated Statutes, in water resources planning, providing for water conservation requirements for data centers.
Water, cooling and emissions
In committee24 September 2026
PASB 724An Act providing for regulation of large load customers and public utilities and for community benefits agreements between large load customers and community-based organizations; establishing the Data Center LIHEAP Enhancement Fund; and imposing duties on the Department of Human…
Large-load tariffs and cost allocation
In committee31 March 2026
PASB 939 †Establishing the Office of Transformation and Opportunity and the Artificial Intelligence, Data Center and Emerging Technology Regulatory Sandbox Program; and providing for powers and duties of office and for permits for high impact data centers that have their own power.
Siting, zoning and permitting, On-site and co-located generation
In committee4 February 2026
PASB 991An Act providing for a permitting process for data center siting; and imposing powers and duties on the Department of Environmental Protection.
Siting, zoning and permitting
In committee5 September 2025
PASR 369A Resolution directing the Legislative Budget and Finance Committee to conduct a study on the future viability of data center technology and facilities.In committee30 September 2026
RIHB 6097AN ACT RELATING TO STATE AFFAIRS AND GOVERNMENT -- RHODE ISLAND COMMERCE CORPORATION -- QUALIFIED DATA CENTERS LOCATION INCENTIVE
Tax incentives and clawbacks
Companion: RI SB 921
Dead6 May 2025
RIHB 7270AN ACT RELATING TO PUBLIC UTILITIES AND CARRIERS -- PUBLIC UTILITY COMMISSION
Large-load tariffs and cost allocation
Companion: RI SB 2427
Dead7 April 2026
RIHB 7331AN ACT RELATING TO PUBLIC UTILITIES AND CARRIERS -- PUBLIC UTILITIES COMMISSION
Large-load tariffs and cost allocation
Companion: RI SB 2776
Dead7 April 2026
RIHB 7695AN ACT RELATING TO STATE AFFAIRS AND GOVERNMENT -- RHODE ISLAND COMMERCE CORPORATION
Tax incentives and clawbacks
Companion: RI SB 2346
Dead7 May 2026
SCH 3309Electrical Utilities
Large-load tariffs and cost allocation, Siting, zoning and permitting
Enacted19 May 2025
SCH 4583The South Carolina Data Center Responsibility Act
Tax incentives and clawbacks, Water, cooling and emissions
In committee18 February 2026
SCH 4925 †Sales Tax Exemption
Tax incentives and clawbacks
In committee14 January 2026
SCH 5122Internet and Communications Service Providers Equipment
Tax incentives and clawbacks
Enacted5 June 2026
SCH 5215Data Center Utility Costs
Large-load tariffs and cost allocation, Siting, zoning and permitting, Water, cooling and emissions
In committee24 February 2026
SCH 5286Data Center Moratorium
Siting, zoning and permitting, Tax incentives and clawbacks
In committee31 March 2026
SCH 5484Energy Affordability Act
Large-load tariffs and cost allocation, Tax incentives and clawbacks, Water, cooling and emissions
In committee1 April 2026
SCH 5526Data Center Moratorium
Siting, zoning and permitting
In committee14 April 2026
SCS 163Cryptocurrency
Grid reliability and load flexibility
Enacted5 June 2026
SCS 724Commercial Data Center Water Usage Report
Water, cooling and emissions
In committee13 January 2026
SCS 784Energy
Large-load tariffs and cost allocation, Tax incentives and clawbacks, Water, cooling and emissions
In committee14 January 2026
SCS 867Data Center Development
Large-load tariffs and cost allocation, Siting, zoning and permitting, Water, cooling and emissions
Passed committee6 May 2026
SCS 902Data Centers
Large-load tariffs and cost allocation, Siting, zoning and permitting, Water, cooling and emissions, Grid reliability and load flexibility
In committee10 February 2026
SDHB 1005provide a sales and use tax exemption for goods and services related to data center operations.
Tax incentives and clawbacks
In committee4 February 2026
SDHB 1038allow the Public Utilities Commission to assess actual costs to data centers that are customers of public utilities.
Large-load tariffs and cost allocation
Enacted30 March 2026
SDHB 1198require that certain facilities obtain conditional use permits from adjacent political subdivisions.
Siting, zoning and permitting
Dead12 February 2026
SDHB 1246 †prohibit nondisclosure of certain agreements related to data centers.Dead20 February 2026
SDHB 1301limit costs and risks associated with electricity use by data centers and impose a moratorium.
Large-load tariffs and cost allocation
In committee18 February 2026
SDSB 127limit nuisances caused by data centers.
Siting, zoning and permitting
In committee18 February 2026
SDSB 128update provisions related to certain large-use customers of utilities.
Large-load tariffs and cost allocation
In committee18 February 2026
SDSB 135protect residents from increased utility costs and utility shortages caused by data centers and clarify authority to regulate data centers.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Enacted30 March 2026
SDSB 177provide a sales and use tax refund for goods and services related to data center operations.
Tax incentives and clawbacks
In committee18 February 2025
SDSB 193clarify the definition of backup electric generation.
On-site and co-located generation
Dead23 February 2026
SDSB 232 †impose a one-year moratorium on the construction or expansion of hyperscale data centers.
Siting, zoning and permitting
In committee18 February 2026
SDSB 234modify provisions pertaining to the purchasing of goods and services related to data center operations.
Tax incentives and clawbacks
In committee18 February 2026
SDSB 235protect residents from increased utility costs and utility shortages caused by data centers, to clarify authority to regulate data centers, and to modify provisions pertaining to the purchasing of goods and services by a data center.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee18 February 2026
SDSB 239modify provisions relating to the reinvestment payment program, and relating to the purchasing of goods and services used by projects approved for the reinvestment payment program.
Tax incentives and clawbacks
In committee24 February 2026
TNHB 1461Computers and Electronic Processing - As introduced, requires high performance computing (HPC) facility operators to devote 50 percent of the computing and data processing output of the facility for a public benefit; requires HPC facility operators to produce an annual report of…
Water, cooling and emissions
Companion: TN SB 1832
In committee4 March 2026
TNHB 1827County Government - As introduced, requires a local legislative body to approve the location of any quarry or digital asset mining facility in a public meeting. - Amends TCA Title 5; Title 6; Title 7; Title 13 and Title 68.
Siting, zoning and permitting
Companion: TN SB 2053
Passed committee21 April 2026
TNHB 1847Computers and Electronic Processing - As enacted, generally prohibits a municipality or electric utility to pay or absorb the cost of electrical infrastructure incurred to serve a data center; makes related changes. - Amends TCA Title 5; Title 6; Title 7; Title 13 and Title 65.
Large-load tariffs and cost allocation
Companion: TN SB 2128
Enacted18 May 2026
TNHB 2047 †Taxes, Sales - As introduced, authorizes a qualified data center that applies for job tax credits to certify electronically that it has not, within the previous 12 months, been found to be in violation of the Worker Adjustment and Retraining Notification (WARN) Act, the Fair…
Tax incentives and clawbacks
Companion: TN SB 2584
In committee15 April 2026
TNHB 2054Energy - As introduced, enacts the "Data Center, Artificial Intelligence, and Clean Transition Tariff Accountability Act." - Amends TCA Title 7 and Title 65.
Large-load tariffs and cost allocation
Companion: TN SB 1999
In committee4 March 2026
TNHB 2061Utilities, Utility Districts - As introduced, requires certain data centers to register with the Tennessee public utilities commission; requires electric and water utilities that provide service to registered data centers to report usage and rates to the commission; requires the…
Large-load tariffs and cost allocation, Water, cooling and emissions
Companion: TN SB 1600, TN SB 1682
In committee11 March 2026
TNHB 2392Business and Commerce - As introduced, creates the "Tennessee Data Center Impact Review Act." - Amends TCA Title 5; Title 6; Title 7; Title 10; Title 62; Title 65; Title 68 and Title 69.
Siting, zoning and permitting, Water, cooling and emissions, Grid reliability and load flexibility
Companion: TN SB 2653
In committee18 March 2026
TNHB 2456Utilities, Utility Districts - As introduced, requires certain data centers to register with the department of revenue; requires fuel suppliers, and electric and water utilities that provide fuel and service respectively to registered data centers to report usage and rates to…
Water, cooling and emissions
Companion: TN SB 2112
In committee18 March 2026
TNHB 2463Energy - As introduced, enacts the "Bring Your Own Generation Act." - Amends TCA Section 39-17-1002; Section 67-6-102 and Title 68.
On-site and co-located generation
Companion: TN SB 2681
In committee18 March 2026
TNHB 2464Consumer Protection - As introduced, prohibits electric utilities and high performance computing centers in this state from using transformers, parts, or equipment manufactured or sold by entities owned or controlled by foreign adversaries to support any part of their…
Grid reliability and load flexibility
Companion: TN SB 2680
In committee4 March 2026
TNHB 946Energy - As introduced, requires an applicant and an electric utility service to perform and submit to the locality a site assessment prior to the approval of a rezoning request, special exception, or special use permit for the siting of a new high energy use facility (HEUF)…
Siting, zoning and permitting, Water, cooling and emissions
Companion: TN SB 962
In committee18 March 2026
TXHB 3824Relating to fire safety standards and emergency operations plans for the operation of battery energy storage facilities; providing administrative penalties.Enacted20 June 2025
TXHB 3970Relating to the interconnection and operation of large loads.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Companion: TX SB 1942
Passed chamber15 May 2025
TXHB 4290Relating to a qualifying cogenerator that serves a large load and a colocated desalination facility.
On-site and co-located generation
Passed chamber6 May 2025
TXHB 4908Relating to the establishment of the Texas prosperity payout fund; imposing taxes on the gross revenues of and consumption by certain industry participants; authorizing administrative penalties.In committee3 April 2025
TXHB 5588Relating to an exemption from ad valorem taxation of the total appraised value of real property used as a data center and the tangible personal property used by the data center to meet the data center's demand for energy.
Tax incentives and clawbacks
Companion: TX SB 2222
In committee7 April 2025
TXSB 2074Relating to a study of the four coincident peak program by the Public Utility Commission of Texas and the independent organization certified to manage the ERCOT power region.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee24 March 2025
TXSB 2211Relating to a qualifying cogenerator that serves a large load and a colocated desalination facility.
On-site and co-located generation
In committee10 April 2025
TXSB 2315 †Relating to a cost overage exemption for interconnection of advanced nuclear reactors to the ERCOT transmission system.
Large-load tariffs and cost allocation, On-site and co-located generation
In committee25 March 2025
TXSB 2888Relating to the temporary sales and use tax exemptions for certain tangible personal property related to data centers and large data center projects.
Tax incentives and clawbacks
In committee7 April 2025
TXSB 6Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Enacted20 June 2025
TXSJR 72Proposing a constitutional amendment to authorize the legislature to exempt from ad valorem taxation the total appraised value of real property used as a data center and the tangible personal property used by the data center to meet the data center's demand for energy.
Tax incentives and clawbacks
In committee25 March 2025
USH.R. 10004Defending Our Energy and Water Act
Water, cooling and emissions
In committee30 July 2026
USH.R. 10005Data Center Resource Disclosure Act
Water, cooling and emissions
In committee30 July 2026
USH.R. 10041Smart Data Center Policy ActIn committee3 August 2026
USH.R. 10102Data Center Community Reinvestment Act of 2026In committee13 August 2026
USH.R. 10118No Data Center NDAs ActIn committee20 August 2026
USH.R. 10119Protecting Local Control of Data Centers ActIn committee20 August 2026
USH.R. 10139Ratepayer Bill of Rights Act of 2026
Large-load tariffs and cost allocation
In committee24 August 2026
USH.R. 10169To prohibit the provision of Federal financial benefit for the construction, expansion, or substantial rehabilitation of data centers on prime farmland and other certain farmland.
Siting, zoning and permitting
In committee27 August 2026
USH.R. 10321Responsible Data Center Siting Act of 2026
Siting, zoning and permitting
In committee8 September 2026
USH.R. 10322Data Center Fair Share Act
Large-load tariffs and cost allocation
In committee8 September 2026
USH.R. 10448Reverse Big Ugly Tax Breaks for Data Centers Act
Tax incentives and clawbacks
In committee16 September 2026
USH.R. 10465Public Lands Accountability ActIn committee16 September 2026
USH.R. 10467Data Center Fairness Fee Act of 2026
Large-load tariffs and cost allocation
In committee16 September 2026
USH.R. 10570No Secrets for Data Centers Act of 2026
Water, cooling and emissions
In committee24 September 2026
USH.R. 10579Energy Cost Fairness and Reliability Act of 2026
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee24 September 2026
USH.R. 10809Make Data Centers Pay Act
Large-load tariffs and cost allocation
In committee13 October 2026
USH.R. 5227Unleashing Low-Cost Rural AI ActIn committee9 September 2025
USH.R. 5927Securing Reliable Power for Advanced Technologies Act
Grid reliability and load flexibility
In committee7 November 2025
USH.R. 6179Clean Cloud Act of 2025In committee20 November 2025
USH.R. 6336Fair Allocation of Interstate Rates Act
Large-load tariffs and cost allocation
In committee1 December 2025
USH.R. 6529Protecting Families from AI Data Center Energy Costs ActPassed committee21 July 2026
USH.R. 6983PRICE ActIn committee8 January 2026
USH.R. 6984Data Center Transparency ActIn committee8 January 2026
USH.R. 7066SHIELD ActIn committee14 January 2026
USH.R. 7635CHARGE ActIn committee20 February 2026
USH.R. 7858Data Center Community Impact ActIn committee5 March 2026
USH.R. 8033No Harm Data Centers ActIn committee20 March 2026
USH.R. 8037Protect American AI Act of 2026In committee24 March 2026
USH.R. 8241Power for the People Act of 2026In committee9 April 2026
USH.R. 8488AI Data Center Site Selection Transparency Act of 2026
Siting, zoning and permitting
In committee23 April 2026
USH.R. 8516American Leadership in AI ActIn committee27 April 2026
USH.R. 8711Data Infrastructure Risk Reduction ActIn committee8 May 2026
USH.R. 9019POWER ActIn committee22 May 2026
USH.R. 9183Artificial Intelligence Environmental Impacts Act of 2026
Water, cooling and emissions
In committee8 June 2026
USH.R. 9262Local Control Protection ActIn committee11 June 2026
USH.R. 9340Ratepayer Protection Act
Large-load tariffs and cost allocation
Passed chamber30 September 2026
USH.R. 9372Data Infrastructure Energy Measurement and Standards Act
Water, cooling and emissions
Passed committee25 June 2026
USH.R. 9419Power and Water for Families Act of 2026
Water, cooling and emissions
In committee24 June 2026
USH.R. 9442Artificial Intelligence Data Center Moratorium Act
Siting, zoning and permitting
In committee24 June 2026
USH.R. 9629Protecting Communities from Data Center Impacts Act of 2026
Siting, zoning and permitting, Water, cooling and emissions, Grid reliability and load flexibility
In committee9 July 2026
USH.R. 9655FAIR Data ActIn committee13 July 2026
USH.R. 9777Protecting Ratepayers ActIn committee20 July 2026
USH.R. 9825Data Center Water and Energy Transparency Act of 2026
Water, cooling and emissions
Companion: US S. 4213
In committee22 July 2026
USH.R. 9939No AI Data Centers on Federal Lands ActIn committee23 July 2026
USS. 1475Clean Cloud Act of 2025In committee10 April 2025
USS. 3269Liquid Cooling for AI Act of 2025
Water, cooling and emissions
In committee15 April 2026
USS. 3682Power for the People Act of 2026In committee15 January 2026
USS. 3852GRID ActIn committee11 February 2026
USS. 4214Artificial Intelligence Data Center Moratorium Act
Siting, zoning and permitting
In committee25 March 2026
USS. 4251Mined in America Act of 2026In committee26 March 2026
USS. 4559Energy Cost Fairness and Reliability Act of 2026
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee18 May 2026
USS. 4727Artificial Intelligence Environmental Impacts Act of 2026
Water, cooling and emissions
In committee9 June 2026
USS. 4806POWER Up ActIn committee17 June 2026
USS. 4825American A.I. Sovereign Wealth Fund ActIn committee18 June 2026
USS. 5028Ratepayer Protection Act
Large-load tariffs and cost allocation
In committee16 July 2026
USS. 5054Data Center Tax Accountability and Disclosure Act of 2026
Tax incentives and clawbacks
In committee21 July 2026
USS. 5199GRID Savings Act of 2026
Grid reliability and load flexibility
In committee30 July 2026
USS. 5418No Tax Breaks for Data Centers Act
Tax incentives and clawbacks
In committee16 September 2026
USS. 5640 †Data Center Transparency Act of 2026
Water, cooling and emissions
In committee30 September 2026
USS. 5645 †Data Center Community Empowerment Act of 2026
Siting, zoning and permitting
In committee30 September 2026
USS. 5658 †A bill to prohibit the construction of data centers on Federal land, and for other purposes.
Siting, zoning and permitting
In committee30 September 2026
UTHB 230Blockchain and Digital Innovation AmendmentsEnacted26 March 2025
UTHB 413Surplus Interconnection Service Amendments
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee7 March 2026
UTHB 507State Coordination of Regional and Local Economic Development Projects AmendmentsEnacted25 March 2026
UTHB 585Data Center AmendmentsIn committee7 March 2026
UTHB 76Data Center Water Transparency Amendments
Water, cooling and emissions
Enacted23 March 2026
UTSB 132Electric Utility Amendments
Companion: UT SB 227
Enacted26 March 2025
UTSB 282Electrical Grid Amendments
Grid reliability and load flexibility
Dead7 March 2026
UTSB 318Data Center Non Disclosure Amendments
Water, cooling and emissions
Introduced7 March 2026
VAHB 1087High energy use facilities; natural gas fuel cell generating resources.
Large-load tariffs and cost allocation, Tax incentives and clawbacks, On-site and co-located generation, Water, cooling and emissions
In committee18 February 2026
VAHB 1101Local composite index school funding formula; data center revenue.
Tax incentives and clawbacks
In committee18 February 2026
VAHB 116 †Retail Sales and Use tax; exemption for data centers.
Tax incentives and clawbacks, Water, cooling and emissions
Companion: VA SB 192
In committee18 November 2024
VAHB 1288 †Public utilities; classification of customers.
Large-load tariffs and cost allocation
In committee18 November 2024
VAHB 1379Electric utilities; interconnection service standards, high-demand customers.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
In committee21 July 2026
VAHB 1515Local approval of data centers; temporary moratorium.
Large-load tariffs and cost allocation, Siting, zoning and permitting
In committee21 July 2026
VAHB 153Data centers; site assessment, sound profile of the high energy use facility.
Siting, zoning and permitting, Water, cooling and emissions
Enacted13 April 2026
VAHB 154Data centers; use of emergency generation unit, disclosure requirements.
Water, cooling and emissions
In committee18 February 2026
VAHB 1546 †Data centers; sales and use tax exemption for certain equipment or enabling software.
Tax incentives and clawbacks
In committee18 November 2024
VAHB 155Electric utilities; certificate of operation for high-load facilities.
Large-load tariffs and cost allocation, Siting, zoning and permitting, Grid reliability and load flexibility
In committee18 February 2026
VAHB 1601 †Data centers; site assessment for high energy use facility.
Siting, zoning and permitting
Enacted2 May 2025
VAHB 1984 †Data centers; sitings near parks, schools, and residential areas.
Siting, zoning and permitting
In committee4 February 2025
VAHB 2026Data centers; industrial zoning.
Siting, zoning and permitting
In committee4 February 2025
VAHB 2028School boards; entitlement to one-time fee from certain data centers.
Siting, zoning and permitting
In committee4 February 2025
VAHB 2035High-energy facilities; water and energy usage info. reports statewide clearinghouse established.
Water, cooling and emissions
In committee5 February 2025
VAHB 2101Electric utilities; data center cost allocation.
Large-load tariffs and cost allocation
In committee5 February 2025
VAHB 2377Comprehensive plan; data centers, water usage.
Siting, zoning and permitting, Water, cooling and emissions
In committee4 February 2025
VAHB 241License plates; only rear plate required, exception.In committee18 February 2026
VAHB 2422Public utilities; classification of customers.
Large-load tariffs and cost allocation, Water, cooling and emissions
In committee5 February 2025
VAHB 2428Tangible personal property; computer equipment and peripherals used in data centers.
Tax incentives and clawbacks
In committee5 February 2025
VAHB 2578Retail Sales and Use Tax; exemption for data centers, reports.
Tax incentives and clawbacks, Water, cooling and emissions
In committee5 February 2025
VAHB 2644Electric cooperative subsidiaries; customers exceeding 90 megawatts demand.
Large-load tariffs and cost allocation
Enacted24 March 2025
VAHB 2684Phase II Utility; plan for certain generation and transmission infrastructure costs.
Large-load tariffs and cost allocation
In committee5 February 2025
VAHB 2685Retail Sales and Use Tax; commercial & industrial exemptions for data centers in Northern Virginia.
Tax incentives and clawbacks
In committee4 February 2025
VAHB 2712Data centers; local authority considering any land use application.
Siting, zoning and permitting
In committee4 February 2025
VAHB 2715Retail Sales and Use Tax; exemption for data centers, definitions.
Tax incentives and clawbacks
In committee4 February 2025
VAHB 285Distributed Energy Resources Task Force; created, membership, reports, sunset.Vetoed11 April 2026
VAHB 323Data centers; Department of Energy shall lead efforts to accelerate use of waste heat, report.
Water, cooling and emissions
Enacted13 April 2026
VAHB 338 †Siting of data centers; locality may perform site assessment before approval.
Siting, zoning and permitting, Water, cooling and emissions
Passed chamber19 November 2024
VAHB 496Certain data from water users; water use consumption for domestic, etc., purposes, data centers.
Water, cooling and emissions
Enacted13 April 2026
VAHB 503Electric utilities; cost recovery, costs substantially related to serving data center customers.
Large-load tariffs and cost allocation
In committee21 July 2026
VAHB 507Data centers; permit requirements, emission limits for certain engine-generator sets.
Water, cooling and emissions
Enacted8 April 2026
VAHB 511Data centers; industrial zoning.
Siting, zoning and permitting
In committee23 January 2026
VAHB 557Tangible personal property tax; establishes classification for electric landscaping equipment.Enacted8 April 2026
VAHB 589Data centers; certain data from water users, water use consumption.
Water, cooling and emissions
In committee18 February 2026
VAHB 591Data centers; policy of the Commonwealth.
Large-load tariffs and cost allocation, Water, cooling and emissions, Grid reliability and load flexibility
Passed chamber21 July 2026
VAHB 607Aggregate air pollution; Department of Environmental Quality to study, data center generators.
Water, cooling and emissions
In committee21 July 2026
VAHB 641Virginia's Great Outdoors Act; established, creates data center land conservation tax.In committee21 July 2026
VAHB 658State Corporation Commission; cost allocation proceedings for certain electric utilities.
Large-load tariffs and cost allocation
In committee18 February 2026
VAHB 784RS and UT; commercial and industrial exemptions, disclosure of data center operator exemption.
Tax incentives and clawbacks
In committee11 February 2026
VAHB 824Data centers; energy generation and storage, report.
On-site and co-located generation
In committee18 February 2026
VAHB 897Retail Sales and Use Tax; exemption for data centers, delayed effective date.
Tax incentives and clawbacks
Passed chamber3 March 2026
VAHB 910 †Data centers; energy usage.
Water, cooling and emissions
In committee18 November 2024
VAHB 945Geothermal energy; Dept. of Energy to study, SCC to establish requirements for high energy users.
Large-load tariffs and cost allocation, On-site and co-located generation
In committee18 February 2026
VAHB 961Retail Sales and Use Tax; commercial and industrial exemptions, data centers.
Tax incentives and clawbacks
In committee11 February 2026
VAHJ 64 †Localities hosting data center infrastructure; DHCD to study revenue sharing program.
Tax incentives and clawbacks
In committee18 November 2024
VASB 1045 †Siting of data centers; property classified for industrial use.
Siting, zoning and permitting
Dead27 January 2025
VASB 1046Data centers; noise abatement.
Siting, zoning and permitting, Water, cooling and emissions
Dead27 January 2025
VASB 1196Retail Sales and Use Tax; exemption data centers.
Tax incentives and clawbacks
In committee5 February 2025
VASB 1197Electric cooperative subsidiaries; customers exceeding 90 megawatts demand.
Large-load tariffs and cost allocation
Enacted24 March 2025
VASB 1243Electric utilities; electric distribution infrastructure serving data centers.
Large-load tariffs and cost allocation
In committee27 January 2025
VASB 130Data centers; site assessment, definition of high energy use facility.
Siting, zoning and permitting
Passed committee3 February 2026
VASB 1353High-energy facilities; water and energy usage info. reports statewide clearinghouse established.
Water, cooling and emissions
Passed committee5 February 2025
VASB 1358Underground transmission lines; qualifying projects.In committee27 January 2025
VASB 1425Retail Sales and Use Tax; data center exemption expiration, distribution of revenues.
Tax incentives and clawbacks
In committee5 February 2025
VASB 1449Data centers; site assessment for high energy use facility.
Siting, zoning and permitting, Grid reliability and load flexibility
Enacted2 May 2025
VASB 191 †Electric utilities; data center demand, allocation of costs among customer classes.
Large-load tariffs and cost allocation
In committee18 November 2024
VASB 284 †Siting of data centers; impacts on resources and historically significant sites.
Siting, zoning and permitting
In committee19 November 2024
VASB 285 †Siting of data centers; site assessment.
Siting, zoning and permitting, Water, cooling and emissions
In committee19 November 2024
VASB 289 †Stormwater management regulations; enterprise data center operations.
Water, cooling and emissions
In committee18 November 2024
VASB 336Tier 2 emergency generators; SCC shall evaluate impact of requiring data centers to limit use, etc.
Grid reliability and load flexibility
Passed chamber21 July 2026
VASB 339SCC; cost allocation proceedings for certain electric utilities, definitions.
Large-load tariffs and cost allocation
Passed chamber21 July 2026
VASB 393Virginia's Great Outdoors Act; established, creates data center land conservation tax.
Tax incentives and clawbacks
In committee21 July 2026
VASB 417Cloud Computing Cluster Infrastructure Grant Fund; reclaimed water usage, definitions.
Tax incentives and clawbacks, Water, cooling and emissions
Passed committee21 July 2026
VASB 465Retail Sales and Use Tax; exemption for data centers.
Tax incentives and clawbacks
In committee17 February 2026
VASB 466Electric utilities; cost recovery, costs substantially related to serving data center customers.
Siting, zoning and permitting, Grid reliability and load flexibility
In committee21 July 2026
VASB 467High load facilities; impact assessments.
Large-load tariffs and cost allocation, Siting, zoning and permitting
In committee21 July 2026
VASB 521 †Data centers; rainwater harvesting systems.
Siting, zoning and permitting, Water, cooling and emissions
In committee21 July 2026
VASB 551Energy load flexibility protocols; SCC et al., to evaluate high electric demand customers, report.
Grid reliability and load flexibility
In committee9 February 2026
VASB 552 †Siting of large data centers; site assessment, standards, civil penalties.
Siting, zoning and permitting
Dead2 February 2026
VASB 553Certain data from water users; water use consumption for domestic, etc., purposes, data centers.
Water, cooling and emissions
Enacted13 April 2026
VASB 554Zoning; high-energy users, local authority.
Siting, zoning and permitting, Grid reliability and load flexibility
In committee12 February 2026
VASB 619Electric utilities; certificate of operation for high-load facilities.
Large-load tariffs and cost allocation, Grid reliability and load flexibility
Passed chamber10 March 2026
VASB 664 †Electric utilities; electric distribution infrastructure serving data centers.
Large-load tariffs and cost allocation
In committee18 November 2024
VASB 700Large-Scale Electricity Consumer Infrastructure Impact Fund; created.
Large-load tariffs and cost allocation
In committee21 July 2026
VASB 709Cloud Computing Cluster Infrastructure Grant Fund; performance agreement.In committee21 July 2026
VASB 841Data centers; public hearing and notice requirements.
Siting, zoning and permitting
In committee8 October 2026
VASB 843Data centers; state permitting, local approval, moratorium, sunset.
Siting, zoning and permitting, On-site and co-located generation
In committee9 October 2026
VASB 899High electric demand facility; locality may include in its zoning ordinance water use estimate.
Siting, zoning and permitting, Water, cooling and emissions
Dead30 January 2025
VASB 93Data centers; taxes on banks that are tenants of a center.
Tax incentives and clawbacks
In committee21 July 2026
VASB 94Data centers; site assessment, sound profile of the high energy use facility.
Siting, zoning and permitting, Water, cooling and emissions
Enacted13 April 2026
VASB 960Electric utilities; data center cost allocation.
Large-load tariffs and cost allocation
Passed chamber22 February 2025
VASB 976Cloud Computing Cluster Infrastructure Grant Fund; performance agreement.In committee29 January 2025
VTH 370An act relating to cryptocurrency and protecting the public welfare
Water, cooling and emissions
Introduced26 February 2025
VTH 720An act relating to the Cloud Computing Public Utility ActIntroduced20 January 2026
VTH 727An act relating to sustainable data center deployment
Siting, zoning and permitting, Water, cooling and emissions, Grid reliability and load flexibility
Vetoed29 May 2026
VTS 205An act relating to a temporary moratorium on AI data centers and a report on the construction and operation of AI data centers in Vermont
Siting, zoning and permitting, Grid reliability and load flexibility
Introduced6 January 2026
WAHB 2413Ensuring that the clean energy transformation act provides the regulatory certainty to allow investments in new energy generation resources sufficient to meet Washington's energy needs.
On-site and co-located generation
In committee13 January 2026
WAHB 2502Improving local government funding by removing certain sales and use tax exemptions.
Tax incentives and clawbacks
In committee15 January 2026
WAHB 2515Addressing emerging large energy use facilities.
Large-load tariffs and cost allocation, Siting, zoning and permitting, Grid reliability and load flexibility
Companion: WA SB 6171
Floor vote12 March 2026
WAHB 2655Providing a retail sales and use tax exemption for the construction and equipping of new data centers located in a county east of the Cascades that borders another state and has a population of at least 500,000.
Tax incentives and clawbacks
In committee6 February 2026
WAHB 2708Removing a tax exemption for the replacement of equipment for data centers.
Tax incentives and clawbacks
In committee30 January 2026
WASB 6121Providing electricity service to large energy use facilities.
Large-load tariffs and cost allocation
In committee14 January 2026
WASB 6231Removing a tax exemption for the replacement of equipment for data centers.
Tax incentives and clawbacks
Enacted1 April 2026
WIAB 1036Relating to: prohibiting nondisclosure agreements intended to conceal information about a data center from the public.
Water, cooling and emissions
Companion: WI SB 969
Dead23 March 2026
WIAB 1099Relating to: moratorium on data centers.
Siting, zoning and permitting
Companion: WI SB 1061
Dead23 March 2026
WIAB 228 †Relating to: tax incremental financing districts containing qualified data centers. (FE)
Tax incentives and clawbacks
Companion: WI SB 241
Dead23 March 2026
WIAB 245Relating to: modifying the sales and use tax exemption for qualified data centers. (FE)
Tax incentives and clawbacks
Companion: WI SB 244
Dead23 March 2026
WIAB 657Relating to: a sales and use tax exemption for nuclear fusion technology projects. (FE)
Tax incentives and clawbacks
Enacted2 April 2026
WIAB 722Relating to: large energy customer fees; electric utility very large customer class; a renewable resource tariff; building requirements for data centers; water usage by large customers; required pay rate on large-scale data center projects; and granting rule-making authority…
Large-load tariffs and cost allocation, Siting, zoning and permitting, Water, cooling and emissions
Companion: WI SB 729
Dead6 April 2026
WIAB 840Relating to: certain requirements related to data centers.Passed chamber23 March 2026
WISB 843Relating to: certain requirements related to data centers.Dead23 March 2026
WVHB 3137Relating to establishing economic incentives for data centers to locate within the state
Tax incentives and clawbacks
In committee4 March 2025
WVHB 3264Relating to the ad valorem property valuation of specialized high-technology property
Tax incentives and clawbacks
In committee7 March 2025
WVHB 4481WV Load Forecast Accountability Act
Grid reliability and load flexibility
Passed chamber13 March 2026
WVHB 4509Relating to restoring local jurisdiction to state political subdivisions over certain electric power facilities.
Siting, zoning and permitting
In committee19 January 2026
WVHB 4683Prevent depletion of groundwater and aquifers
Water, cooling and emissions
In committee21 January 2026
WVHB 4832Relating to the use of state water resources
Water, cooling and emissions
In committee26 January 2026
WVHB 4854Prohibiting the state or any political subdivision from subsidizing any data center in West Virginia
Tax incentives and clawbacks
Companion: WV HB 4948
In committee28 January 2026
WVHB 4971Relating to preliminary planning for future electric substations near industrial parks on certain high voltage transmission linesPassed chamber26 February 2026
WVHB 4983 †Authorizing the Department of Commerce to promulgate a legislative rule relating to certification of a microgrid district or certification as a high impact data center
Tax incentives and clawbacks, On-site and co-located generation
Enacted29 June 2026
WVHB 5032Prevention of data center collection of citizen dataIn committee2 February 2026
WVHB 5411Establishing the Energy Freedom and Fairness ActIn committee10 February 2026
WVHB 5590Create a limited and predictable water-quantity review framework for High Impact Data Centers (HIDCs) in West Virginia.
Water, cooling and emissions
In committee16 February 2026
WVHB 5611Certified Microgrid Program
On-site and co-located generation
Companion: WV SB 658
In committee16 February 2026
WVHB 5620To restore local control in the decision making process in regard to data centers
Siting, zoning and permitting
In committee16 February 2026
WVHB 5657Electric Choice and Competition ActIn committee17 February 2026
WVSB 583Establishing economic incentives for data centers to locate within state
Tax incentives and clawbacks
In committee24 February 2025
WVSB 623 †Establishing economic incentives for data centers to locate within WV
Tax incentives and clawbacks
In committee27 January 2026
WVSB 652Relating to distribution of tax revenues collected from data centers
Tax incentives and clawbacks
In committee28 January 2026
WVSB 695 †Department of Commerce rule relating to certification of microgrid district or certification as high impact data center
Tax incentives and clawbacks, On-site and co-located generation
In committee30 January 2026
WVSB 803Relating to data centersIn committee19 March 2025
WVSB 818Power Generation and Consumption Act of 2025
On-site and co-located generation
In committee19 March 2025
WVSB 857Establishing economic incentives for data centers to locate within state
Tax incentives and clawbacks
In committee20 March 2025
WYSF 193Electric utility service agreements-large loads.
Large-load tariffs and cost allocation
Dead3 March 2025
WYSF 76Distribution of taxes on large electrical loads.
Large-load tariffs and cost allocation
Introduced10 February 2026

What this report could not read

On 2 November 2026, 12,484 bills in current sessions were held without their text: Montana 3,456, Illinois 715, Virginia 715, Puerto Rico 633, Congress 624, Kansas 618, Michigan 526, Missouri 461, Delaware 454, New Hampshire 450, Hawaii 436, Colorado 270, New Jersey 254, Nevada 247, Mississippi 215, Massachusetts 212, Rhode Island 197, Northern Mariana Islands 194, Arizona 184, Guam 159, Utah 153, US Virgin Islands 148, West Virginia 143, New York 115, Iowa 112, Ohio 105, North Dakota 96, Maine 82, California 78, Kentucky 58, South Carolina 52, Georgia 43, Louisiana 40, North Carolina 39, Nebraska 32, Oklahoma 31, Minnesota 23, Wisconsin 20, New Mexico 16, Tennessee 16, Oregon 13, Florida 12, Alaska 11, Maryland 4, South Dakota 4, Washington 4, District of Columbia 3, Texas 3, Alabama 2, Idaho 2, Pennsylvania 2, Vermont 2. They are matched on their titles alone, so a bill on this topic whose title does not say so may be missing; check those legislatures directly.

 † Matched on the bill's title alone, because the platform does not yet hold that bill's full text. Every other bill is matched on its whole document.

Follow this Tracker

Each month's issue of the Data Centers and Energy Load Tracker, emailed when it is published, and every bill behind it in your dashboard with its status and history as it moves. Start a 14-day trial.

Published by LawSignals. Data Centers and Energy Load Tracker is issued monthly. To receive each issue, follow it at lawsignals.com/data-centers-energy