Data center legislation by state

States are deciding who pays for the power data centers use.

A monthly report on state data center bills: siting, tax incentives, large-load electricity costs, on-site power and water.

For data center developers, utilities, large energy users, local governments and their counsel.

bills in scope
738bills in scope
jurisdictions
52jurisdictions

9 new data centers and energy laws take effect in 2027

Get the monthly report

Free. One email a month.

Unsubscribe from any issue. We do not sell or share addresses.

What is moving now

Ranked by how far each bill has moved. Matched through 16 November 2026.

66Enacted

10Cleared both chambers

102Past committee

10Active in committee

550Introduced or inactive

738 bills in scope

Enacted

12 of 66 shown

CAAB 1577Data centers: reporting.Enacted

What it requires: Owners or operators of data centers must submit specified information to the State Energy Resources Conservation and Development Commission upon energization and annually thereafter, including energy consumption, power usage effectiveness, and fuel consumption. Owners or operators must also submit energy consumption and sound level estimates to local agencies when applying for discretionary permits.

CAAB 2383Electricity: data centers.Enacted

What it requires: Each electrical corporation must file transmission and distribution service and generation service tariffs for participating data centers. Each community choice aggregator or electric service provider must adopt a generation service tariff for data centers by January 1, 2028. All tariffs must allocate incremental costs to data centers and prevent cost shifts to other ratepayers.

CAAB 2469Data centers: water use disclosures.Enacted

What it requires: A city, county, or city and county shall not approve a discretionary or ministerial permit or other entitlement for data center construction or expansion that increases maximum peak water use unless the applicant provides a water supply assessment, projected water use and efficiency measures, workforce disclosures, and beginning January 1, 2028, a water scarcity plan, and assumes full cost of required water infrastructure improvements.

CAAB 2619Water resources: data centers.Enacted

What it requires: A person who owns or operates a data center must provide its water supplier a good faith estimate of expected water use, anticipated water source, and projected water use volumes for maximum day, maximum month, and average year prior to applying for an initial city or county business license. Upon renewal, the data center owner or operator must report actual annual water use for the preceding calendar year, including total and direct water use by source and cooling system type.

CASB 1168Data centers: rate structures.Enacted

What it requires: The Public Utilities Commission must assess opportunities for rate structures in new or existing proceedings to ensure data centers pay their reasonable share of transmission and distribution costs, pay their proportionate share of load increases and procurements needed to reliably serve their loads, and alleviate cost pressures on residential ratepayers.

CASB 886California Technology Innovation and Ratepayer Protection Act.Enacted

What it requires: The Public Utilities Commission must establish new tariffs or update existing electric rules by January 1, 2028 for interconnection of participating customer facilities and provision of retail electric service to participating customers. The commission must evaluate risks and benefits to nonparticipating customers, prevent stranded costs or cost shifts to them, and ensure generation charges for unbundled customers appear as separate line items.

CASB 887California Environmental Quality Act: environmental leadership development projects: data centers: geothermal powerplant projects.Enacted

What it requires: Lead agencies must not exempt data center projects from CEQA review using categorical exemptions. The Governor may certify data center projects and geothermal powerplants as environmental leadership development projects if the lead agency certifies they meet specified conditions, including zero-carbon energy requirements, community benefits agreements, and grid investment commitments.

NJS 3379Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.Enacted

What it requires: The owner or operator of a data center in the State shall submit a water and energy usage report to the Board of Public Utilities on a semi-annual basis, beginning no later than six months after the effective date for new data centers or three months for those operating at least one year. The report must contain basic facility information, energy and water usage data, and for recipients of State financial incentives, performance calculations and sustainability indicators.

NJS 4390"End Data Center Tax Credits Act"; reduces tax credits available for Next New Jersey Program.*Enacted

What it does: Reduces tax credits available for the Next New Jersey Program from $500 million to $250 million beginning fiscal year 2025, and removes a proposed data center tax credit program from the overall $11.5 billion tax credit cap.

DEHB 233AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO LARGE ENERGY USE FACILITIES.Enacted

What it requires: Commission-regulated electric utilities must establish a separate rate class for large energy use facilities and require them to obtain Commission approval of an Electric Service Agreement and Transmission Service Agreement before beginning operations. Large energy use facilities must pay minimum 90% of contract capacity for distribution and supply costs, maintain curtailment capability, provide financial security, and contribute to low-income and green energy funds.

DEHB 310AN ACT TO AMEND TITLE 30 OF THE DELAWARE CODE RELATING TO BUSINESS TAX CREDITS AND DEDUCTIONS.Enacted

What it does: Amends the definition of 'qualified facility' in Delaware tax code to exclude large energy use facilities (those using 30 megawatts or more and primarily providing data center services) from eligibility for business tax credits and license fee reductions.

DEHB 445AN ACT TO AMEND TITLE 26 AND TITLE 29 OF THE DELAWARE CODE RELATING TO LARGE ENERGY USE FACILITIES.Enacted

What it requires: Large energy use facilities may not operate in Delaware unless they produce or procure sufficient clean energy in the state or within specified PJM transmission zones. Facilities must meet renewable energy portfolio standards or use acceptable clean energy technology. Facilities must enter a 15-year binding contract with the electric utility's regulatory body containing a guaranteed insurance bond.

Every bill links to the legislature's own page.

Each issue

  • What moved this month in each state, and what was signed.
  • Bills grouped by topic, from tax incentives to large-load tariffs.
  • A short plain-language summary of each bill that moved.
  • Bills, and state agency rule changes in the states this page names; utility commission dockets and tariff filings are not covered.

Topics

Large-load tariffs and cost allocation
Rates, contracts, minimum demand charges, collateral and exit fees for very large electric customers, and keeping their grid costs off other ratepayers.
27 laws in 18 states, 177 bills
Siting, zoning and permitting
Where data centers may be built, local approvals, setbacks, noise limits and community agreements.
13 laws in 9 states, 179 bills
Tax incentives and clawbacks
Sales, use and property tax exemptions for data centers and their equipment, and the job, investment and reporting conditions attached.
10 laws in 10 states, 152 bills
On-site and co-located generation
Power plants, storage, nuclear and small modular reactors built for or beside a large load, and selling an existing plant's output to one customer.
7 laws in 5 states, 63 bills
Water, cooling and emissions
Water withdrawal and use for cooling, backup generator emissions, and disclosure of energy and water consumption.
13 laws in 7 states, 159 bills
Grid reliability and load flexibility
Resource adequacy, load forecasting and planning for new large loads, demand response and curtailment during grid emergencies.
13 laws in 9 states, 109 bills

State rule changes

Proposed and adopted rules from state agencies, in the same monthly issue as the bills.

State rules read in 25 states, not yet in 26.

Which states

Read: Alaska, Alabama, Arkansas, California, Florida, Iowa, Idaho, Kentucky, Louisiana, Maryland, Michigan, Minnesota, New Hampshire, New Mexico, Nevada, New York, Ohio, Rhode Island, Texas, Utah, Virginia, Vermont, Washington, Wisconsin and West Virginia.

Not read yet: Arizona, Colorado, Connecticut, District of Columbia, Delaware, Georgia, Hawaii, Illinois, Indiana, Kansas, Massachusetts, Maine, Missouri, Mississippi, Montana, North Carolina, North Dakota, Nebraska, New Jersey, Oklahoma, Oregon, Pennsylvania, South Carolina, South Dakota, Tennessee and Wyoming.

Counts are notices published since 1 October 2026. A state with its own page is linked.

Questions

What does each issue cover?

What moved this month in each state, and what was signed. Bills grouped by topic, from tax incentives to large-load tariffs. A short plain-language summary of each bill that moved. Bills, and state agency rule changes in the states this page names; utility commission dockets and tariff filings are not covered.

Which states does it cover?

Bills in every state legislature, DC and Congress, updated daily. State agency rules in 25 states, named under State rule changes.

Is the report free?

The monthly report is free by email. The Tracker behind it, with the full feed and alerts, is a paid plan. 14-day free trial. From $39/mo billed annually, $49 month to month.

Who decides what is in scope?

Tracker scopes are model-drafted, not attorney-reviewed. Every bill links to the legislature’s own page, so each one can be checked.

Follow data centers and energy law every month

14-day free trial. From $39/mo billed annually, $49 month to month.