  1. Final rule

    Amends interconnection rules for generating facilities up to 10 MW capacity connected to New Mexico electric utilities.

    Open in the state register

  2. Emergency rule

    Emergency rule defining simplified process and system impact studies for generating facility interconnection.

    Open in the state register

  3. Emergency rule

    Emergency rule establishing conditions for disconnection and disconnect switch requirements for generating facilities.

    Open in the state register

  4. Emergency rule

    Emergency rule requiring utilities to collect and retain interconnection data and setting queue position adjustment procedures.

    Open in the state register

  5. Proposed rule

    Proposed rule defining energy storage systems, export capacity, and interconnection procedures for distributed resources.

    Open in the state register

  6. Proposed rule

    Proposed rule establishing interconnection procedures for generating facilities up to 10MW connecting to rural cooperatives.

    Open in the state register

  7. Proposed rule

    Proposed rule establishing screen criteria for evaluating interconnection applications to distribution systems.

    Open in the state register

  8. Proposed rule

    Proposed rule governing modifications to interconnection applications and generating facility configurations.

    Open in the state register

  9. Proposed rule

    Proposed rule on aggregate capacity evaluation and confidential information protections in interconnection applications.

    Open in the state register

  10. Proposed rule

    Proposed rule on cost-sharing mechanisms and grid modernization analysis for interconnection upgrade expenditures.

    Open in the state register

  11. Proposed rule

    Proposed rule on interconnection of generating facilities to utility system; addresses large-load customer obligations and utility tariffs.

    Open in the state register

  12. Proposed rule

    Proposed rule on interconnection timelines and procedures for distributed generation facilities up to specified MW sizes.

    Open in the state register

  13. Proposed rule

    Proposed rule on material modification determinations and queue position retention for generating facilities.

    Open in the state register

  14. Proposed rule

    Proposed rule on network system screens and aggregated generation percentage thresholds for interconnection review.

    Open in the state register

  15. Proposed rule

    Proposed rule requiring control settings documentation for distributed energy resource interconnection.

    Open in the state register

  16. Proposed rule

    Proposed rule requiring utilities to provide interconnection information and allowing time extensions for small utilities.

    Open in the state register

  17. Notice

    Definitions and standards for interconnecting generating facilities up to 10 MW with utility systems.

    Open in the state register

  18. Notice

    Definitions for limited export capability and material modifications affecting interconnection facilities.

    Open in the state register

  19. Notice

    Definitions for network systems and distributed energy resource operating modes and exports.

    Open in the state register

  20. Notice

    Definitions for power conversion units, rated capacity, and protective functions in interconnection.

    Open in the state register

  21. Notice

    Notice describing four interconnection review paths for generating facilities of varying sizes and types.

    Open in the state register

  22. Notice

    Notice detailing applicable IEEE and UL standards for interconnecting distributed energy resources.

    Open in the state register

  23. Notice

    Rule establishing interconnection application procedures and cost responsibility for utility system upgrades.

    Open in the state register

About these New Mexico notices

Which New Mexico notices are listed?

Notices, proposed, emergency and final rules on data centers and energy printed in the New Mexico register since 1 October 2026, newest first. Each links to the page it was printed on.

Is any of this reviewed by a lawyer?

No. The one-line description of each notice is drafted by a model and is not attorney-reviewed. Read the register page before relying on it.

Every data centers and energy rule change, with its date

14-day free trial. From $39/mo billed annually, $49 month to month.