- Final rule
Amends interconnection rules for generating facilities up to 10 MW capacity connected to New Mexico electric utilities.
- Emergency rule
Emergency rule defining simplified process and system impact studies for generating facility interconnection.
- Emergency rule
Emergency rule establishing conditions for disconnection and disconnect switch requirements for generating facilities.
- Emergency rule
Emergency rule requiring utilities to collect and retain interconnection data and setting queue position adjustment procedures.
- Proposed rule
Proposed rule defining energy storage systems, export capacity, and interconnection procedures for distributed resources.
- Proposed rule
Proposed rule establishing interconnection procedures for generating facilities up to 10MW connecting to rural cooperatives.
- Proposed rule
Proposed rule establishing screen criteria for evaluating interconnection applications to distribution systems.
- Proposed rule
Proposed rule governing modifications to interconnection applications and generating facility configurations.
- Proposed rule
Proposed rule on aggregate capacity evaluation and confidential information protections in interconnection applications.
- Proposed rule
Proposed rule on cost-sharing mechanisms and grid modernization analysis for interconnection upgrade expenditures.
- Proposed rule
Proposed rule on interconnection of generating facilities to utility system; addresses large-load customer obligations and utility tariffs.
- Proposed rule
Proposed rule on interconnection timelines and procedures for distributed generation facilities up to specified MW sizes.
- Proposed rule
Proposed rule on material modification determinations and queue position retention for generating facilities.
- Proposed rule
Proposed rule on network system screens and aggregated generation percentage thresholds for interconnection review.
- Proposed rule
Proposed rule requiring control settings documentation for distributed energy resource interconnection.
- Proposed rule
Proposed rule requiring utilities to provide interconnection information and allowing time extensions for small utilities.
- Notice
Definitions and standards for interconnecting generating facilities up to 10 MW with utility systems.
- Notice
Definitions for limited export capability and material modifications affecting interconnection facilities.
- Notice
Definitions for network systems and distributed energy resource operating modes and exports.
- Notice
Definitions for power conversion units, rated capacity, and protective functions in interconnection.
- Notice
Notice describing four interconnection review paths for generating facilities of varying sizes and types.
- Notice
Notice detailing applicable IEEE and UL standards for interconnecting distributed energy resources.
- Notice
Rule establishing interconnection application procedures and cost responsibility for utility system upgrades.
Also in New Mexico
Data Centers and Energy rules in other states
About these New Mexico notices
Which New Mexico notices are listed?
Notices, proposed, emergency and final rules on data centers and energy printed in the New Mexico register since 1 October 2026, newest first. Each links to the page it was printed on.
Is any of this reviewed by a lawyer?
No. The one-line description of each notice is drafted by a model and is not attorney-reviewed. Read the register page before relying on it.
Every data centers and energy rule change, with its date
14-day free trial. From $39/mo billed annually, $49 month to month.