Texas SB 6
Texas SB 6: Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation
- Status
- Enacted
- Enacted
- Last action
- Session
- 89R
What it requires
Large load customers in ERCOT requesting new or expanded interconnection exceeding 75 megawatts must disclose whether they are pursuing substantially similar requests elsewhere that would materially change their interconnection request. Interconnecting utilities must pass through reasonable interconnection costs to large load customers. Large load customers must disclose on-site backup generating facilities capable of serving at least 50 percent of on-site demand.
Drafted by software from the bill text and not reviewed by an attorney. Check the official text before relying on it.
History
Effective immediately
Signed by the Governor
Sent to the Governor
Signed in the House
Signed in the Senate
Co-author authorized
Reported enrolled
Senate concurs in House amendment(s)-reported
Record vote
Senate concurs in House amendment(s)
Read
House amendment(s) laid before the Senate
House passage as amended reported
Statement(s) of vote recorded in Journal
Record vote
More Texas data centers and energy legislation
- HB 547Relating to county noise study requirements and site construction approval for facilities operated by certain large load electric customers, authorizing a feeIntroduced
- HB 730Relating to the interconnection of large load customers and the recovery of costs of generation facilities serving large load customers by electric utilities operating outside of the ERCOT power regionIntroduced
- SB 32Relating to the issuance by the Public Utilities Commission of Texas of a permit for the construction of a large computational load site; providing an administrative penaltyIntroduced
- SB 35Relating to the sharing of information related to large load customers by the independent organization certified for the ERCOT power region with the Texas Water Development BoardIntroduced
- HB 3970Relating to the interconnection and operation of large loadsPassed chamber
- SB 2315Relating to a cost overage exemption for interconnection of advanced nuclear reactors to the ERCOT transmission systemIn committee
- SB 2074Relating to a study of the four coincident peak program by the Public Utility Commission of Texas and the independent organization certified to manage the ERCOT power regionIn committee
- HB 3824Relating to fire safety standards and emergency operations plans for the operation of battery energy storage facilities; providing administrative penaltiesEnacted, from 1 September 2025
Know the next Texas data centers and energy law while it is a bill
LawSignals tracks bills in every state and Congress, and sends a monthly report on what changed.