Congress H.R. 10579

Congress H.R. 10579: Energy Cost Fairness and Reliability Act of 2026

Status
In committee
Last action
Session
119

What it would do

Amends the Federal Power Act to require FERC to establish interconnection procedures for large load facilities (over 50 megawatts) seeking transmission system access, including requirements for demand flexibility, new generation resources, cost responsibility for studies and network upgrades, and labor standards for prioritized projects.

Drafted by software from the bill text and not reviewed by an attorney. Check the official text before relying on it.

Email me when new AI laws pass or take effect

Free. At most one email a week, only when a law is signed or takes effect. Unsubscribe in one click.

History

  1. Introduced in House

  2. Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.

Know the next Congress AI law while it is a bill

LawSignals tracks bills in every state and Congress, and sends a monthly report on what changed.