Congress data center and energy bills
Every data center and energy bill in Congress, what each would do, and where it stands. 29 states enacted data center and energy laws in the 2025 and 2026 sessions. Congress has bills in progress and none enacted yet.
- Bills in scope
- 67bills in scope
- Past committee
- 3past committee
- Most recent action
- 12 November 2026most recent action
Data center and energy in Congress, by topic
Water, cooling and emissions
11 bills. Enacted in 7 states.
Large-load tariffs and cost allocation
9 bills. Enacted in 18 states.
Siting, zoning and permitting
8 bills. Enacted in 9 states.
Grid reliability and load flexibility
5 bills. Enacted in 9 states.
Tax incentives and clawbacks
3 bills. Enacted in 10 states.
On-site and co-located generation
1 bill. Enacted in 5 states.
Data center and energy bills in Congress
The bills not yet law, furthest along first, with what each would do.
3Past committee
3Active in committee
61Introduced or inactive
67 bills in scope
Past committee
3
What it would do: Amends the Public Utility Regulatory Policies Act of 1978 to require electric utilities to recover full incremental costs of generation, transmission, or distribution upgrades from large-load customers (non-residential consumers with peak demand of 100+ megawatts for data centers), and to require such customers provide financial assurances before upgrades are made.
What it would do: Requires the Federal Energy Regulatory Commission to hold a technical conference within 90 days with utilities, regulators, and large loads including data centers to discuss protecting residential and small commercial ratepayers from increased costs, and submit recommendations to Congress within 180 days after the conference concludes.
What it would do: Directs the Director of the National Institute of Standards and Technology to develop best practices for measuring data center energy and water use, study data availability for energy demand forecasting, and coordinate with stakeholders and international partners on standards. Authorizes $10,000,000 for fiscal years 2027 through 2029.
Active in committee
3
What it would do: Prohibits construction of data centers on Federal land, including National Forest System land and land managed by the Secretary of the Interior, excluding Indian tribal lands. Requires reversionary clauses in Federal land conveyances after enactment to revert land to the United States if used for data centers unless authorized by Congress.
What it would do: Prohibits the use of Federal funds for constructing or operating data centers unless the project complies with all applicable State and local laws and obtains required State or local approvals, as determined by the Secretary of Energy in consultation with the Secretary of the Treasury.
What it would do: Requires sponsors of data centers with facility loads of 20 megawatts or more to file public disclosure statements with the Secretary of Energy detailing ownership, construction costs, rate effects, generation, water usage, proximity to protected areas, and labor practices, with violations subject to civil penalties up to $1,000,000 per day.
Introduced or inactive
19 of 61 shown
What it would do: Prohibits Federal incentives for covered data centers with at least 100 megawatts peak power demand and 50 percent AI accelerator chips, and imposes a 100 percent excise tax on State and local incentives received by such data centers.
What it would do: Amends the Federal Power Act to require that electric utilities recover the full incremental cost of serving data centers and high-density computing facilities with 20+ megawatts of load from those facilities alone, prohibiting cost allocation to other ratepayers.
What it would do: Requires the EPA to report quarterly on data centers' water consumption, water reuse, effects on local water systems, greenhouse gas emissions, and impacts on overburdened communities. Requires the Energy Information Administration to report twice yearly on data center energy consumption by state and effects on household energy bills.
What it would do: Amends the Internal Revenue Code to expand energy community definitions for advanced nuclear facilities to include areas with 0.17 percent or greater nuclear-related employment, and adds distribution and large power transformers to the advanced manufacturing production credit at 10 percent of production costs.
What it would do: Requires the Secretary of Energy to establish a Data Center Community Assistance Program within 180 days to provide State, local, and Tribal governments with technical assistance, information, and analysis regarding energy, water, infrastructure, and economic impacts of data center development, and to develop a publicly accessible toolkit for local officials.
What it would do: Reforms federal permitting and environmental review processes by amending the National Environmental Policy Act, Clean Water Act, and Endangered Species Act to streamline timelines, establish lead agencies, coordinate reviews, and create categorical exclusions for certain projects including energy infrastructure and lifeline repairs.
What it would do: Prohibits construction of data centers on National Forest System land and land managed by the Secretary of the Interior, excluding Indian lands. Requires any conveyance of Federal land after enactment to include a reversionary clause returning the land to the United States if used for a data center, unless authorized by Congress.
What it would do: Voids and makes unenforceable predispute nondisclosure clauses in data center contracts involving public officials or public funds, and prohibits conditioning public incentives on restricting disclosure of data center building information.
What it would do: Amends the Federal Power Act to require FERC to establish interconnection procedures for large load facilities (over 50 megawatts) seeking transmission system access, including requirements for demand flexibility, new generation resources, cost responsibility for studies and network upgrades, and labor standards for prioritized projects.
What it would do: Amends the Internal Revenue Code to exclude qualified data center property from bonus depreciation and from qualified opportunity zone business property treatment, effective for property placed in service after enactment.
What it would do: Requires the Bureau of Land Management to treat hyperscale data center permits on public lands as major Federal actions requiring full environmental impact statements with 45-day public comment periods and analysis of water consumption, cooling energy use, and regional water supply effects. Requires applicants to submit workforce plans detailing job creation and prevailing wage information.
What it would do: Amends the Clean Air Act to require the EPA to impose and collect a charge of $0.01 per kilowatt-hour on data centers and cryptocurrency mining facilities with over 50 megawatts of capacity, plus an additional $0.05 per kilogram of carbon dioxide equivalent for high-pollution facilities, beginning 2027.
What it would do: Amends the Internal Revenue Code to exclude data centers from the definition of qualified opportunity zone businesses, making them ineligible for opportunity zone tax benefits. The amendment applies to interests and property acquired after enactment.
What it would do: Directs the Secretary of Energy, in consultation with the Federal Energy Regulatory Commission, Secretary of Defense, and other agencies, to establish and publish best practices for data center siting that consider impacts on the electric grid, water use, environment, local communities, national security, workforce, and economy, with initial publication within one year and revisions at least every two years.
What it would do: Amends the Public Utility Regulatory Policies Act of 1978 to require electric utilities to recover full incremental costs of generation, transmission, or distribution upgrades from large-load customers (100+ megawatts peak demand). Withholds 100 percent of highway apportionment funds from States that do not implement this standard.
What it would do: Prohibits Federal agencies from providing Federal financial assistance, tax credits, deductions, accelerated depreciation, or other Federal financial benefits for construction, expansion, or substantial rehabilitation of data centers on prime farmland or other certain farmland as defined in the Farmland Protection Policy Act.
What it would do: Requires data centers with peak electricity demand of at least 50 megawatts or water withdrawal of at least 100,000 gallons per day to publicly disclose resource use, infrastructure costs, rate impacts, and public financial assistance, and prohibits ratepayers from subsidizing project-driven costs.
What it would do: Prohibits Members of Congress from signing nondisclosure agreements with state, local, or private entities as a condition for accessing information about data center planning, development, investments, location, construction, or resource consumption. Bars use of federal funds to implement or enforce such agreements.
What it would do: Prohibits Federal agencies from overriding, bypassing, or displacing State or local land-use, zoning, siting, or permitting authority for data centers on non-Federal land, and prohibits conditioning Federal funds for such data centers on States or localities relinquishing or limiting such authority.
Showing the 25 furthest along of 67. Subscribers see all of them, filtered and searchable. Bill titles link to Congress's own page.
What counts as data center and energy legislation
In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.
Questions
Does Congress have a data center and energy law?
None of the 67 data center and energy bills in Congress has been enacted in the 2025 and 2026 sessions. 3 bills got past a committee.
Which data center and energy bills are moving in Congress?
3 bills not yet law have passed a committee or a chamber, the furthest along H.R. 9340 (passed chamber), H.R. 6529 (passed committee) and H.R. 9372 (passed committee).
What does Congress legislate on most in data center and energy?
Water, cooling and emissions (11 bills), Large-load tariffs and cost allocation (9 bills) and Siting, zoning and permitting (8 bills).
Are these summaries reviewed by a lawyer?
No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.
Other practice areas in Congress
- AI in Congress377
- Alcohol in Congress16
- Cannabis in Congress33
- Children's Online Safety in Congress51
- Cybersecurity in Congress185
- Data Privacy in Congress153
- Employment in Congress494
- Entertainment in Congress27
- Healthcare in Congress866
- Insurance in Congress63
- Intellectual Property in Congress72
- Packaging and PFAS in Congress55
- Payments and fintech in Congress61
- Rental housing in Congress31
- Tobacco and nicotine in Congress11
- Transportation in Congress100
- All jurisdictions
Data center and energy legislation in other jurisdictions
51 more currently hold bills in this tracker
- Virginia76
- New Jersey67
- Pennsylvania45
- Michigan35
- Texas32
- Montana30
- New York24
- West Virginia24
- Illinois23
- Maryland21
- California15
- Georgia14
- South Dakota14
- Arizona13
- Minnesota13
- Tennessee13
- Indiana12
- South Carolina12
- Iowa11
- Ohio11
- Oklahoma11
- Utah10
- Arkansas9
- Connecticut9
- Louisiana9
- North Carolina9
- Idaho8
- Nebraska8
- Wisconsin8
- Delaware7
- Kentucky7
- Washington7
- New Hampshire6
- Florida5
- Kansas5
- Missouri5
- Colorado4
- Hawaii4
- Massachusetts4
- North Dakota4
- Rhode Island4
- Vermont4
- Wyoming4
- Oregon3
- Alaska2
- Alabama2
- Maine2
- Mississippi2
- New Mexico2
- District of Columbia1
- Nevada1
Know when Congress's data center and energy law changes