Missouri data center and energy bills

Every data center and energy bill in the Missouri Legislature, what each would do, and where it stands. 29 states enacted data center and energy laws in the 2025 and 2026 sessions. Missouri has bills in progress and none enacted yet.

Bills in scope
5bills in scope
Past committee
0past committee
Most recent action
15 May 2026most recent action

Data center and energy in Missouri, by topic

Data center and energy bills in Missouri

The bills not yet law, furthest along first, with what each would do.

5Introduced or inactive

5 bills in scope

Introduced or inactive

5

HB 2239Creates the Artificial Intelligence Data Center Environmental Accountability ActIn committee

What it would do: Requires AI-optimized data centers with 100+ megawatts capacity built or expanded after August 28, 2027 to use closed-loop water cooling systems and submit annual environmental and health reports to the Department of Natural Resources, with civil penalties up to $50,000 per day for violations.

HB 3369Prohibits the issuance of permits for construction of data centers for one year in St. LouisIn committee

What it would do: Pauses acceptance, processing, or approval of applications for acquiring, constructing, or altering data center facilities in St. Louis until August 28, 2027, excluding applications submitted before August 28, 2026.

HB 3390Creates new provisions related to the construction of data centersIn committee

What it would do: Prohibits hyperscale data centers on agricultural land and within ten miles of agricultural or conservation areas or five miles of water after August 28, 2026. Requires local public hearings, state siting board approval, noise controls, 500-foot setbacks, and major industrial water user permits for facilities using over 2.4 million gallons daily.

SB 1730Modifies provisions relating to the Missouri Technology CorporationIn committee

What it would do: Creates the Innovation Endowment Fund in the state treasury, funded by appropriations, donations, one-half of one percent of data storage center project costs (or one-quarter percent if including workforce development space), and one hundred dollars per megawatt of solar farm capacity, for use by the Missouri technology corporation.

SB 1750Creates provisions relating to the regulation of large load electric customersIn committee

What it would do: Requires electrical corporations to develop tariffs ensuring large load facilities' rates reflect their representative cost share. Establishes disclosure, study, and financial requirements for large load facility operators, including minimum contract terms, collateral deposits, and annual contributions to low-income energy assistance programs.

Bill titles link to the Missouri Legislature's own page.

What LawSignals covers

What counts as data center and energy legislation

In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.

Questions

Does Missouri have a data center and energy law?

None of the 5 data center and energy bills in the Missouri Legislature has been enacted in the 2025 and 2026 sessions.

What does Missouri legislate on most in data center and energy?

Siting, zoning and permitting (2 bills), Tax incentives and clawbacks (2 bills) and Large-load tariffs and cost allocation (1 bill).

Are these summaries reviewed by a lawyer?

No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.

Know when Missouri's data center and energy law changes

An alert when a bill moves, and one report a month on what changed in every state and Congress.