Missouri data center and energy bills
Every data center and energy bill in the Missouri Legislature, what each would do, and where it stands. 29 states enacted data center and energy laws in the 2025 and 2026 sessions. Missouri has bills in progress and none enacted yet.
- Bills in scope
- 5bills in scope
- Past committee
- 0past committee
- Most recent action
- 15 May 2026most recent action
Data center and energy in Missouri, by topic
Siting, zoning and permitting
2 bills. Enacted in 8 states.
Tax incentives and clawbacks
2 bills. Enacted in 11 states.
Large-load tariffs and cost allocation
1 bill. Enacted in 19 states.
Water, cooling and emissions
1 bill. Enacted in 7 states.
Grid reliability and load flexibility
1 bill. Enacted in 11 states.
Data center and energy bills in Missouri
The bills not yet law, furthest along first, with what each would do.
5Introduced or inactive
5 bills in scope
Introduced or inactive
5
What it would do: Requires AI-optimized data centers with 100+ megawatts capacity built or expanded after August 28, 2027 to use closed-loop water cooling systems and submit annual environmental and health reports to the Department of Natural Resources, with civil penalties up to $50,000 per day for violations.
What it would do: Pauses acceptance, processing, or approval of applications for acquiring, constructing, or altering data center facilities in St. Louis until August 28, 2027, excluding applications submitted before August 28, 2026.
What it would do: Prohibits hyperscale data centers on agricultural land and within ten miles of agricultural or conservation areas or five miles of water after August 28, 2026. Requires local public hearings, state siting board approval, noise controls, 500-foot setbacks, and major industrial water user permits for facilities using over 2.4 million gallons daily.
What it would do: Creates the Innovation Endowment Fund in the state treasury, funded by appropriations, donations, one-half of one percent of data storage center project costs (or one-quarter percent if including workforce development space), and one hundred dollars per megawatt of solar farm capacity, for use by the Missouri technology corporation.
What it would do: Requires electrical corporations to develop tariffs ensuring large load facilities' rates reflect their representative cost share. Establishes disclosure, study, and financial requirements for large load facility operators, including minimum contract terms, collateral deposits, and annual contributions to low-income energy assistance programs.
Bill titles link to the Missouri Legislature's own page.
What counts as data center and energy legislation
In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.
Questions
Does Missouri have a data center and energy law?
None of the 5 data center and energy bills in the Missouri Legislature has been enacted in the 2025 and 2026 sessions.
What does Missouri legislate on most in data center and energy?
Siting, zoning and permitting (2 bills), Tax incentives and clawbacks (2 bills) and Large-load tariffs and cost allocation (1 bill).
Are these summaries reviewed by a lawyer?
No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.
Other practice areas in Missouri
- AI in Missouri37
- Alcohol in Missouri32
- Cannabis in Missouri32
- Children's Online Safety in Missouri14
- Cybersecurity in Missouri10
- Data Privacy in Missouri21
- Employment in Missouri128
- Healthcare in Missouri219
- Insurance in Missouri197
- Intellectual Property in Missouri14
- Packaging and PFAS in Missouri10
- Payments and fintech in Missouri18
- Rental housing in Missouri25
- Tobacco and nicotine in Missouri15
- Transportation in Missouri39
- All jurisdictions
Data center and energy legislation in other jurisdictions
49 more currently hold bills in this tracker
- Virginia83
- New Jersey68
- Congress61
- Pennsylvania38
- Michigan35
- Illinois23
- West Virginia22
- Maryland21
- New York19
- California16
- South Dakota14
- Minnesota13
- Oklahoma13
- South Carolina13
- Georgia12
- Indiana12
- Iowa11
- Montana11
- Ohio11
- Tennessee11
- Texas11
- Arkansas9
- Arizona9
- Connecticut9
- Idaho9
- Louisiana9
- North Carolina9
- Nebraska8
- Utah8
- Wisconsin8
- Delaware7
- Kentucky7
- Washington7
- Kansas6
- New Hampshire6
- Colorado5
- Florida5
- Massachusetts4
- North Dakota4
- Rhode Island4
- Vermont4
- Maine3
- Oregon3
- Alaska2
- Alabama2
- Hawaii2
- Mississippi2
- New Mexico2
- Wyoming2