New Jersey data center and energy laws

What New Jersey has enacted on data center and energy, what each law requires, and what the bills still moving would do. New Jersey is one of 29 states that enacted a data center and energy law in the 2025 and 2026 sessions.

Bills in scope
67bills in scope
Past committee
21past committee
Most recent action
29 October 2026most recent action

Data center and energy laws enacted in New Jersey

4 data center and energy laws enacted in the New Jersey Legislature in the 2025 and 2026 sessions, newest first. Each links to the legislature's own page.

  • S 3379Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.Enacted 27 August 2026

    What it requires: The owner or operator of a data center in the State shall submit a water and energy usage report to the Board of Public Utilities on a semi-annual basis, beginning no later than six months after the effective date for new data centers or three months for those operating at least one year. The report must contain basic facility information, energy and water usage data, and for recipients of State financial incentives, performance calculations and sustainability indicators.

    Water, cooling and emissions

  • S 4390"End Data Center Tax Credits Act"; reduces tax credits available for Next New Jersey Program.*Enacted 27 August 2026

    What it does: Reduces tax credits available for the Next New Jersey Program from $500 million to $250 million beginning fiscal year 2025, and removes a proposed data center tax credit program from the overall $11.5 billion tax credit cap.

    Tax incentives and clawbacks

  • A 796Requires electric public utilities to develop and apply special rules for certain data centers to protect non-data center customers from increased costs.**Enacted 7 July 2026

    What it requires: Each electric public utility must file a petition with the Board of Public Utilities within 180 days after the board establishes standards to develop a rate class and tariff for large data center customers. The tariff must ensure other customers do not subsidize large data center customers, protect against stranded costs, and incentivize energy efficiency and clean generation procurement.

    Large-load tariffs and cost allocation

  • A 5466Requires BPU to study effects of data centers on electricity costs.*Enacted 8 July 2025

    What it requires: The Board of Public Utilities must carry out a study within one year of the effective date on the effects of data center electricity usage on electricity costs in the State. The board must determine whether non-data center customers unreasonably subsidize data center costs, estimate residential rate impacts, and assess policy alternatives including special tariffs for data centers. The board must submit findings to the Governor and Legislature within 15 months.

    Large-load tariffs and cost allocation

Data center and energy in New Jersey, by topic

Data center and energy bills in New Jersey

The bills not yet law, furthest along first, with what each would do.

4Enacted

1Cleared both chambers

16Past committee

3Active in committee

43Introduced or inactive

67 bills in scope

Cleared both chambers

1

S 4293Requires owner or operator of data center to submit water and energy usage report to BPU.Vetoed

What it would do: Requires owners or operators of data centers in New Jersey to submit quarterly water and energy usage reports to the Board of Public Utilities containing facility information, energy and water consumption data, performance calculations, and sustainability indicators.

Past committee

16

A 3966Requires DEP to conduct study of short and long term effects of water use by large-scale data centers.Passed chamber

What it would do: Requires the Department of Environmental Protection to conduct a study of short and long-term water use effects by large-scale data centers and submit findings to the Governor and Legislature within fifteen months of the bill's effective date.

S 4304Prohibits agreements intended to conceal certain information concerning development of data centers under MLUL.Passed chamber

What it would do: Prohibits applicants for data center development from entering into non-disclosure agreements with approving authorities, municipal agencies, and property sellers to conceal development details, declaring such agreements against public policy and unenforceable, and bars approvals if violated.

S 4400Requires DEP to conduct study of short and long term effects of water use by large-scale data centers.Passed committee

What it would do: Requires the Department of Environmental Protection to conduct an evaluation of water use effects by large-scale data centers within one year and submit a report to the Governor and Legislature within fifteen months, including short and long-term impacts and feasible reduction strategies.

A 4801Establishes certain protections against demand by large-load addition customers in State.Passed chamber

What it would do: Requires load-serving entities to impose PJM curtailment obligations solely on large-load addition customers (50 MW or more) and pass through reliability backstop procurement costs to those customers. Requires large-load addition customers to provide financial security and submit detailed information to PJM.

A 4096Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.Passed committee

What it would do: Requires data center owners and operators to submit semi-annual water and energy usage reports to the Board of Public Utilities for three years, including basic facility information and energy and water consumption data, with additional performance and sustainability metrics required for facilities receiving state financial incentives.

A 5165"End Data Center Tax Credits Act"; reduces tax credits available for Next New Jersey Program.*Passed committee

What it would do: Reduces tax credits available for the Next New Jersey Program by $250 million, reallocating those credits back to the New Jersey Aspire Program and Emerge Program.

S 731Requires electric public utilities to develop and apply special rules for large load customers to protect non-large load customers from increased costs.*Passed committee

What it would do: Requires electric public utilities to file tariffs with the Board of Public Utilities within 180 days establishing special rates for large load customers with monthly demand exceeding 100 megawatts, designed to ensure other customers do not subsidize these customers and are protected from increased costs and stranded costs.

SR 18Urges states in PJM Interconnection region to require data centers to obtain electricity from new zero- or low-emission sources of energy.Passed chamber

What it would do: This resolution urges all states in the PJM Interconnection region to adopt measures requiring data centers to obtain electricity from new zero- or low-emission energy sources.

S 680Requires energy usage plan for proposed artificial intelligence data centers and cryptocurrency mining facilities; requires all electricity for artificial intelligence data centers and cryptocurrency mining facilities to be derived from new clean energy sources.Passed committee

What it would do: Upon the Board of Public Utilities finding that a majority of PJM region states have similar requirements, requires all electricity supplied to new AI data centers and cryptocurrency mining facilities to derive from new Class I renewable energy or newly constructed nuclear power plants, measured hourly with no net decrease to the grid, and mandates energy usage plans addressing cooling, water, weatherproofing, and heat utilization.

A 5462Requires electric public utilities to develop and apply special rules for large load customers to protect non-large load customers from increased costs.**Passed chamber

What it would do: Requires each electric public utility to file a tariff with the Board of Public Utilities within 180 days for providing electricity to data centers, designed to protect non-data center ratepayers from increased costs and incentivize data center energy efficiency, to be applied one year after enactment.

A 6237Requires payment of prevailing wage for certain data center construction.Passed committee

What it would do: Requires prevailing wage payment for data center construction projects with 250+ kilowatts electrical capacity or 500+ kilowatt-hours average usage, and imposes contractor registration, insurance, bonding, safety training, background check, and labor agreement requirements on such projects.

S 4307Requires electric public utilities to develop and apply special rules for large load customers to protect non-large load customers from increasaed costs.**Passed committee

What it would do: Requires electric public utilities to file tariffs with the Board of Public Utilities within 180 days establishing special rates for large load data centers with at least 100 megawatts maximum monthly demand, designed to protect non-data center ratepayers from increased costs and incentivize energy efficiency.

A 5898Requires BPU to study potential deployment of advanced transmission technologies in NJ.Passed committee

What it would do: Requires the Board of Public Utilities to conduct a study evaluating the potential deployment of advanced transmission technologies by electric utilities, including their costs, benefits, and feasibility for reducing grid congestion and increasing transmission capacity, with a report due within one year.

S 4876"New Jersey Energy Reliability and Affordability Act"; establishes advanced nuclear reactor, distributed energy storage, and demand optimization programs in BPU.Passed committee

What it would do: Establishes programs in the Board of Public Utilities for advanced nuclear reactor development, distributed battery storage capacity of 500 megawatts by 2030, and demand optimization programs targeting 500 megawatts peak demand reduction by 2030, funded through non-bypassable charges on electric utility customers.

S 4143Requires energy usage plan for proposed artificial intelligence data centers and cryptocurrency mining facilities; requires all electricity for artificial intelligence data centers and cryptocurrency mining facilities to be derived from new clean energy sources.*Passed committee

What it would do: Requires AI data centers and cryptocurrency mining facilities to submit energy usage plans to the Board of Public Utilities and derive all electricity from new Class I renewable energy, newly constructed nuclear power plants, or a combination thereof, measured hourly with no net decrease to the grid.

S 4318Requires BPU to study effects of data centers on electricity costs.*Passed committee

What it would do: Requires the Board of Public Utilities to study within one year how data centers affect electricity costs in New Jersey, including whether non-data center customers subsidize data center costs and whether to implement special tariffs for data centers.

Active in committee

3

A 5729Requires certain State agencies to establish expedited approval and permitting procedures for artificial intelligence data centers that bring their own power.In committee

What it would do: Requires the Board of Public Utilities, Department of Community Affairs, and Department of Environmental Protection to adopt rules establishing expedited approval and permitting procedures for AI data centers powered by on-site natural gas-powered electricity generation systems within 12 months.

A 5646Requires data centers to submit annual report to DEP; requires DEP to establish Data Center Transparency Dashboard.In committee

What it would do: Requires operating data centers to submit annual reports to DEP containing basic information, greenhouse gas emissions, energy demands, water quality violations, and community benefit agreements. Requires DEP to establish a public Data Center Transparency Dashboard publishing these reports within 90 days.

A 5663Requires DEP to conduct study on environmental impacts of data center development in State; prohibits construction of new data centers until study is complete.In committee

What it would do: Requires the Department of Environmental Protection to study environmental, infrastructural, and financial impacts of data center development and submit a report within 15 months. Prohibits construction of new data centers and permit issuance until 90 days after the report is submitted.

Introduced or inactive

5 of 43 shown

A 5586Requires data center developers to provide certain notice to public before preliminary site plan consideration and hearing under MLUL; requires DCA to maintain related public notice website.In committee

What it would do: Requires data center developers to hold community meetings, send direct mail notices within five miles, coordinate social media posts, and provide multilingual information before preliminary site plan approval. Requires the Department of Community Affairs to maintain a public portal aggregating data center development notices.

S 4657Modifies certain DEP permit application requirements for data centers.In committee

What it would do: Requires data center permit applicants to prepare environmental justice impact statements and conduct public hearings in affected communities one year after the bill's effective date, and authorizes the Department of Environmental Protection to deny new data center permits if approval would cause disproportionate cumulative environmental or public health stressors.

S 4658Requires data centers to submit annual report to DEP; requires DEP to establish Data Center Transparency Dashboard.In committee

What it would do: Requires operational data centers and proposed data centers in New Jersey to submit annual reports to the Department of Environmental Protection containing operational details, emissions data, energy demands, and community benefit agreements. Requires DEP to establish a public Data Center Transparency Dashboard publishing these reports within 90 days.

A 5482Establishes six month moratorium on approvals, construction, expansion, subsidies, and tax incentives for certain artificial intelligence data centers; creates Artificial Intelligence Data Center Impact Commission.In committee

What it would do: Establishes a six-month moratorium on state approvals, permits, subsidies, and tax incentives for artificial intelligence data centers exceeding 10 megawatts electrical demand. Creates a 12-member commission to study impacts on electrical grid, water, environment, public health, labor, and municipal finances, requiring a report within 24 months.

A 5373Concerns noise abatement of data centers.In committee

What it would do: Requires data center operators to conduct baseline sound studies by certified acoustic engineers before site plan approval, design facilities with noise abatement measures meeting municipal ordinances, and conduct annual noise compliance studies for three years after becoming operational.

Showing the 25 furthest along of 63. Subscribers see all of them, filtered and searchable. Bill titles link to the New Jersey Legislature's own page.

What LawSignals covers

What counts as data center and energy legislation

In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.

Questions

Does New Jersey have a data center and energy law?

Yes. New Jersey enacted 4 data center and energy laws in the 2025 and 2026 sessions, among them S 3379, S 4390 and A 796. Each is listed on this page with what it requires.

Which data center and energy bills are moving in New Jersey?

17 bills not yet law have passed a committee or a chamber, the furthest along S 4293 (vetoed), A 3966 (passed chamber) and S 4304 (passed chamber).

What does New Jersey legislate on most in data center and energy?

Siting, zoning and permitting (21 bills), Water, cooling and emissions (18 bills) and Grid reliability and load flexibility (16 bills).

Are these summaries reviewed by a lawyer?

No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.

Know when New Jersey's data center and energy law changes

An alert when a bill moves, and one report a month on what changed in every state and Congress.