Data center and energy laws enacted in New Jersey
4 data center and energy laws enacted in the New Jersey Legislature in the 2025 and 2026 sessions, newest first. Each links to the legislature's own page.
- S 3379Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.Enacted 27 August 2026
What it requires: The owner or operator of a data center in the State shall submit a water and energy usage report to the Board of Public Utilities on a semi-annual basis, beginning no later than six months after the effective date for new data centers or three months for those operating at least one year. The report must contain basic facility information, energy and water usage data, and for recipients of State financial incentives, performance calculations and sustainability indicators.
Water, cooling and emissions
- S 4390"End Data Center Tax Credits Act"; reduces tax credits available for Next New Jersey Program.*Enacted 27 August 2026
What it does: Reduces tax credits available for the Next New Jersey Program from $500 million to $250 million beginning fiscal year 2025, and removes a proposed data center tax credit program from the overall $11.5 billion tax credit cap.
Tax incentives and clawbacks
- A 796Requires electric public utilities to develop and apply special rules for certain data centers to protect non-data center customers from increased costs.**Enacted 7 July 2026
What it requires: Each electric public utility must file a petition with the Board of Public Utilities within 180 days after the board establishes standards to develop a rate class and tariff for large data center customers. The tariff must ensure other customers do not subsidize large data center customers, protect against stranded costs, and incentivize energy efficiency and clean generation procurement.
Large-load tariffs and cost allocation
What it requires: The Board of Public Utilities must carry out a study within one year of the effective date on the effects of data center electricity usage on electricity costs in the State. The board must determine whether non-data center customers unreasonably subsidize data center costs, estimate residential rate impacts, and assess policy alternatives including special tariffs for data centers. The board must submit findings to the Governor and Legislature within 15 months.
Large-load tariffs and cost allocation
Data center and energy in New Jersey, by topic
Siting, zoning and permitting
21 bills. Enacted in 9 states.
Water, cooling and emissions
18 bills, 1 enacted. Enacted in 7 states.
Grid reliability and load flexibility
16 bills. Enacted in 9 states.
Large-load tariffs and cost allocation
12 bills, 2 enacted. Enacted in 18 states.
On-site and co-located generation
12 bills. Enacted in 5 states.
Tax incentives and clawbacks
6 bills, 1 enacted. Enacted in 10 states.
Data center and energy bills in New Jersey
The bills not yet law, furthest along first, with what each would do.
4Enacted
1Cleared both chambers
16Past committee
3Active in committee
43Introduced or inactive
67 bills in scope
Cleared both chambers
1
What it would do: Requires owners or operators of data centers in New Jersey to submit quarterly water and energy usage reports to the Board of Public Utilities containing facility information, energy and water consumption data, performance calculations, and sustainability indicators.
Past committee
16
What it would do: Requires the Department of Environmental Protection to conduct a study of short and long-term water use effects by large-scale data centers and submit findings to the Governor and Legislature within fifteen months of the bill's effective date.
What it would do: Prohibits applicants for data center development from entering into non-disclosure agreements with approving authorities, municipal agencies, and property sellers to conceal development details, declaring such agreements against public policy and unenforceable, and bars approvals if violated.
What it would do: Requires the Department of Environmental Protection to conduct an evaluation of water use effects by large-scale data centers within one year and submit a report to the Governor and Legislature within fifteen months, including short and long-term impacts and feasible reduction strategies.
What it would do: Requires load-serving entities to impose PJM curtailment obligations solely on large-load addition customers (50 MW or more) and pass through reliability backstop procurement costs to those customers. Requires large-load addition customers to provide financial security and submit detailed information to PJM.
What it would do: Requires data center owners and operators to submit semi-annual water and energy usage reports to the Board of Public Utilities for three years, including basic facility information and energy and water consumption data, with additional performance and sustainability metrics required for facilities receiving state financial incentives.
What it would do: Reduces tax credits available for the Next New Jersey Program by $250 million, reallocating those credits back to the New Jersey Aspire Program and Emerge Program.
What it would do: Requires electric public utilities to file tariffs with the Board of Public Utilities within 180 days establishing special rates for large load customers with monthly demand exceeding 100 megawatts, designed to ensure other customers do not subsidize these customers and are protected from increased costs and stranded costs.
What it would do: This resolution urges all states in the PJM Interconnection region to adopt measures requiring data centers to obtain electricity from new zero- or low-emission energy sources.
What it would do: Upon the Board of Public Utilities finding that a majority of PJM region states have similar requirements, requires all electricity supplied to new AI data centers and cryptocurrency mining facilities to derive from new Class I renewable energy or newly constructed nuclear power plants, measured hourly with no net decrease to the grid, and mandates energy usage plans addressing cooling, water, weatherproofing, and heat utilization.
What it would do: Requires each electric public utility to file a tariff with the Board of Public Utilities within 180 days for providing electricity to data centers, designed to protect non-data center ratepayers from increased costs and incentivize data center energy efficiency, to be applied one year after enactment.
What it would do: Requires prevailing wage payment for data center construction projects with 250+ kilowatts electrical capacity or 500+ kilowatt-hours average usage, and imposes contractor registration, insurance, bonding, safety training, background check, and labor agreement requirements on such projects.
What it would do: Requires electric public utilities to file tariffs with the Board of Public Utilities within 180 days establishing special rates for large load data centers with at least 100 megawatts maximum monthly demand, designed to protect non-data center ratepayers from increased costs and incentivize energy efficiency.
What it would do: Requires the Board of Public Utilities to conduct a study evaluating the potential deployment of advanced transmission technologies by electric utilities, including their costs, benefits, and feasibility for reducing grid congestion and increasing transmission capacity, with a report due within one year.
What it would do: Establishes programs in the Board of Public Utilities for advanced nuclear reactor development, distributed battery storage capacity of 500 megawatts by 2030, and demand optimization programs targeting 500 megawatts peak demand reduction by 2030, funded through non-bypassable charges on electric utility customers.
What it would do: Requires AI data centers and cryptocurrency mining facilities to submit energy usage plans to the Board of Public Utilities and derive all electricity from new Class I renewable energy, newly constructed nuclear power plants, or a combination thereof, measured hourly with no net decrease to the grid.
What it would do: Requires the Board of Public Utilities to study within one year how data centers affect electricity costs in New Jersey, including whether non-data center customers subsidize data center costs and whether to implement special tariffs for data centers.
Active in committee
3
What it would do: Requires the Board of Public Utilities, Department of Community Affairs, and Department of Environmental Protection to adopt rules establishing expedited approval and permitting procedures for AI data centers powered by on-site natural gas-powered electricity generation systems within 12 months.
What it would do: Requires operating data centers to submit annual reports to DEP containing basic information, greenhouse gas emissions, energy demands, water quality violations, and community benefit agreements. Requires DEP to establish a public Data Center Transparency Dashboard publishing these reports within 90 days.
What it would do: Requires the Department of Environmental Protection to study environmental, infrastructural, and financial impacts of data center development and submit a report within 15 months. Prohibits construction of new data centers and permit issuance until 90 days after the report is submitted.
Introduced or inactive
5 of 43 shown
What it would do: Requires data center developers to hold community meetings, send direct mail notices within five miles, coordinate social media posts, and provide multilingual information before preliminary site plan approval. Requires the Department of Community Affairs to maintain a public portal aggregating data center development notices.
What it would do: Requires data center permit applicants to prepare environmental justice impact statements and conduct public hearings in affected communities one year after the bill's effective date, and authorizes the Department of Environmental Protection to deny new data center permits if approval would cause disproportionate cumulative environmental or public health stressors.
What it would do: Requires operational data centers and proposed data centers in New Jersey to submit annual reports to the Department of Environmental Protection containing operational details, emissions data, energy demands, and community benefit agreements. Requires DEP to establish a public Data Center Transparency Dashboard publishing these reports within 90 days.
What it would do: Establishes a six-month moratorium on state approvals, permits, subsidies, and tax incentives for artificial intelligence data centers exceeding 10 megawatts electrical demand. Creates a 12-member commission to study impacts on electrical grid, water, environment, public health, labor, and municipal finances, requiring a report within 24 months.
What it would do: Requires data center operators to conduct baseline sound studies by certified acoustic engineers before site plan approval, design facilities with noise abatement measures meeting municipal ordinances, and conduct annual noise compliance studies for three years after becoming operational.
Showing the 25 furthest along of 63. Subscribers see all of them, filtered and searchable. Bill titles link to the New Jersey Legislature's own page.
What counts as data center and energy legislation
In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.
Questions
Does New Jersey have a data center and energy law?
Yes. New Jersey enacted 4 data center and energy laws in the 2025 and 2026 sessions, among them S 3379, S 4390 and A 796. Each is listed on this page with what it requires.
Which data center and energy bills are moving in New Jersey?
17 bills not yet law have passed a committee or a chamber, the furthest along S 4293 (vetoed), A 3966 (passed chamber) and S 4304 (passed chamber).
What does New Jersey legislate on most in data center and energy?
Siting, zoning and permitting (21 bills), Water, cooling and emissions (18 bills) and Grid reliability and load flexibility (16 bills).
Are these summaries reviewed by a lawyer?
No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.
Other practice areas in New Jersey
- AI in New Jersey163
- Alcohol in New Jersey117
- Cannabis in New Jersey112
- Children's Online Safety in New Jersey35
- Cybersecurity in New Jersey39
- Data Privacy in New Jersey127
- Employment in New Jersey550
- Entertainment in New Jersey54
- Healthcare in New Jersey828
- Insurance in New Jersey534
- Intellectual Property in New Jersey27
- Packaging and PFAS in New Jersey72
- Payments and fintech in New Jersey65
- Rental housing in New Jersey209
- Tobacco and nicotine in New Jersey50
- Transportation in New Jersey73
- All jurisdictions
Data center and energy legislation in other jurisdictions
51 more currently hold bills in this tracker
- Virginia76
- Congress67
- Pennsylvania45
- Michigan35
- Texas32
- Montana30
- New York24
- West Virginia24
- Illinois23
- Maryland21
- California15
- Georgia14
- South Dakota14
- Arizona13
- Minnesota13
- Tennessee13
- Indiana12
- South Carolina12
- Iowa11
- Ohio11
- Oklahoma11
- Utah10
- Arkansas9
- Connecticut9
- Louisiana9
- North Carolina9
- Idaho8
- Nebraska8
- Wisconsin8
- Delaware7
- Kentucky7
- Washington7
- New Hampshire6
- Florida5
- Kansas5
- Missouri5
- Colorado4
- Hawaii4
- Massachusetts4
- North Dakota4
- Rhode Island4
- Vermont4
- Wyoming4
- Oregon3
- Alaska2
- Alabama2
- Maine2
- Mississippi2
- New Mexico2
- District of Columbia1
- Nevada1
Know when New Jersey's data center and energy law changes
An alert when a bill moves, and one report a month on what changed in every state and Congress.