Siting, zoning and permitting laws by state
179 bills on siting, zoning and permitting in 36 jurisdictions, 13 of them enacted in 2025 and 2026. The laws come first, with what each requires, then the bills that moved most recently.
- 13 laws enacted in 2025 and 2026, in 9 states. Most: California (3), Virginia (3), Delaware (1).
- 179 bills in 36 jurisdictions, 8 of them in Congress. Latest action 10 November 2026.
Updated 16 November 2026LawsRecent billsBy state
Enacted in 2025 and 2026
13 laws, by state. Laws enacted before 2025 are not listed.
California
Enacted
AB 1577: Data centers: reporting.
Owners or operators of data centers must submit specified information to the State Energy Resources Conservation and Development Commission upon energization and annually thereafter, including energy consumption, power usage effectiveness, and fuel consumption. Owners or operators must also submit energy consumption and sound level estimates to local agencies when applying for discretionary permits.
Takes effect 1 January 2027
Enacted
AB 2469: Data centers: water use disclosures.
A city, county, or city and county shall not approve a discretionary or ministerial permit or other entitlement for data center construction or expansion that increases maximum peak water use unless the applicant provides a water supply assessment, projected water use and efficiency measures, workforce disclosures, and beginning January 1, 2028, a water scarcity plan, and assumes full cost of required water infrastructure improvements.
Takes effect 1 January 2027
Enacted
SB 887: California Environmental Quality Act: environmental leadership development projects: data centers: geothermal powerplant projects.
Lead agencies must not exempt data center projects from CEQA review using categorical exemptions. The Governor may certify data center projects and geothermal powerplants as environmental leadership development projects if the lead agency certifies they meet specified conditions, including zero-carbon energy requirements, community benefits agreements, and grid investment commitments.
Takes effect 1 January 2027
Delaware
Enacted
SB 312: An act to amend title 9, title 22, and title 29 of the delaware code relating to data centers.
Counties, municipalities, and state agencies may not enter into nondisclosure agreements that restrict disclosure to the public about potential or actual large-scale data center development. Large-scale data centers are defined as facilities using or able to use 100 megawatts of power or more.
Florida
Enacted
SB 484: Data Centers
Public utilities must file tariffs by October 1, 2026 ensuring large load customers bear their full cost of service without shifting costs to other ratepayers. Public utilities may not knowingly provide electric service to foreign entities qualifying as large load customers. Water management districts and the Department of Environmental Protection must require reclaimed water use by large-scale data centers when feasible.
Took effect 1 July 2026
Indiana
Enacted
HB 1042: Regulation and investment of cryptocurrency.
Boards and committees administering defined contribution funds and annuity savings accounts must offer self-directed brokerage accounts with at least one cryptocurrency investment option by July 1, 2027. Public agencies other than the department of financial institutions cannot prohibit, restrict, or impair persons' ability to use digital assets as payment, maintain custody via self-hosted or hardware wallets, operate nodes, develop blockchain software, transfer digital assets, or participate in staking.
Took effect 1 July 2026
Kentucky
Enacted
HB 701: AN ACT relating to blockchain digital assets.
Individuals may accept digital assets for payment and use wallets without prohibition. Digital assets used as payment shall not face additional taxes or charges based solely on that use. Local governments cannot change zoning for digital asset mining businesses to discriminate against them without notice and comment process.
Nebraska
Enacted
LB 526: Provide powers and duties for public power districts related to cryptocurrency mining operations
Public power suppliers may impose requirements on cryptocurrency mining operations of one megawatt or greater for infrastructure upgrade costs, including direct payment, letters of credit, or terms and conditions. Requirements must be fair, reasonable, and not unduly discriminatory, and must follow a load study. Cryptocurrency mining operations must notify their local public power supplier and comply with interconnection requirements.
Pennsylvania
Enacted
SB 146: An Act amending the act of April 9, 1929 (P.L.343, No.176), known as The Fiscal Code, in emergency COVID-19 response, providing for extension of use of certain funds; in Child Care Staff Recruitment and Retention Program, further providing for Child Care Staff Recruitment and Retention Program; in cigarette sales and licensing, further providing for definitions and providing for allowable mode of operations for licensed cigarette stamping agents; in joint underwriting association, further providing for fund transfers; providing for food processing residuals; in financially distressed municipalities, further providing for financial recovery; in oil and gas wells, further providing for Oil and Gas Lease Fund and providing for deep wells and Utica Shale permits and for well plugging; providing for manufacturing and investment tax credit, for Innovate in PA 2.0 Tax Credit and for design build best value; in human services, further providing for medical assistance payments for institutional care, for resident care and related costs and for LIFE Program and providing for transition to chip-enabled access cards, for Medical Assistance Reentry Program, for Children's Trust Fund and for medical assistance pharmacy services; in additional keystone opportunity expansion zones, providing for additional zone for shipbuilding and for additional zones; providing for residential revitalization keystone opportunity zones and for violent incident clearance and technological investigative methods; in special funds, further providing for funding and for Pennsylvania Convention Center; in additional special funds and restricted accounts, providing for Veterans' Trust Fund Board and further providing for establishment of special fund and account, for use of fund and for distributions from Pennsylvania Race Horse Development Fund; in additional special funds and restricted accounts, further providing for deposits and providing for Professional Licensure Augmentation Account; in general budget implementation, further providing for Executive Offices, for Department of Agriculture, for Department of Corrections, for Department of Labor and Industry and for Department of Transportation, providing for Pennsylvania Emergency Management Agency and further providing for Commonwealth Financing Authority, for Federal and Commonwealth use of forest land, for Multimodal Transportation Fund, for School Safety and Security Fund, for State Gaming Fund, for State Employees' Retirement System Restricted Account and for Public School Employees' Retirement System Restricted Account; in retirement, providing for 2026 special ad hoc municipal police and firefighter postretirement adjustment, for supplemental annuities for public school employees commencing 2026, for supplemental annuities for State employees commencing 2026 and for payment of supplemental annuity and special ad hoc postretirement adjustment; in electricity load forecast accountability, providing for energy and water reporting and for advanced transmission technologies; in 2025-2026 budget implementation, further providing for Department of Agriculture, for Department of Human Services and for Pennsylvania Higher Education Assistance Agency; providing for 2026-2027 budget implementation and for 2026-2027 restrictions on appropriations for funds and accounts; in fiscal supplements to statutory programs, providing for amusement tax clarification, for situs for local sales tax for cities of the first class, for situs for local sales tax for counties of the second class, for net income and for housing; abrogating a regulation; making repeals; providing for suspension of pension actuarial notes; and making editorial changes.
Agricultural operators must file a land application system notification with the State Conservation Commission before using food processing residuals in normal farming operations, every three years. Commercial food processing residuals haulers and brokers must obtain certification from the Department of Agriculture before storing, transferring, transporting, or land-applying food processing residuals.
Took effect 10 September 2026
South Carolina
Enacted
H 3309: Electrical Utilities
Electrical utilities must file monitoring reports quarterly showing actual rate base components, expenses, revenues, and earned return on equity. The Public Service Commission must issue annual orders adjusting rates if utilities' earnings exceed or fall below established ranges. Utilities may not include investments in new generating facilities over 250 megawatts in rate base except through general rate proceedings.
Virginia
Enacted
HB 153: Data centers; site assessment, sound profile of the high energy use facility.
Prior to approving a rezoning, special exception, or special use permit for a new high energy use facility requiring 100 megawatts or more of electrical power, a locality shall require the applicant to submit a site assessment examining the sound profile on residential units and schools within 500 feet. The locality may also require examination of effects on water, agricultural resources, parks, historic sites, and forestland. The electric utility must submit a form describing substations and transmission voltage.
Took effect 1 July 2026
Enacted
SB 94: Data centers; site assessment, sound profile of the high energy use facility.
Prior to approving a rezoning, special exception, or special use permit for a new high energy use facility requiring 100 megawatts or more of electrical power, a locality shall require the applicant to submit a site assessment examining the sound profile on residential units and schools within 500 feet. The locality may also require examination of effects on water, agricultural, park, historic, and forest resources. The electric utility must submit a form describing substations and transmission voltage.
Took effect 1 July 2026
Enacted
HB 1601: Data centers; site assessment for high energy use facility.
This is a conference committee report on House Bill 1601 regarding data centers and site assessment for high energy use facilities. The report recommends rejecting the Senate Amendment and accepting an alternative Amendment in the Nature of a Substitute.
Bills that moved most recently
The 25 open siting, zoning and permitting bills with the latest action. The Data Centers and Energy Load Tracker follows all 179.
Ohio HB 983: Enact the Data Center Accountability and Citizen Protection Act
What it would do: Requires citizen voter approval before new or expanded data centers can be built, establishes environmental standards for data center cooling and wastewater discharge, prohibits local tax incentives for data centers, and requires voter-approved data centers to generate their own electricity independently from the public grid.
In committee
Texas HB 547: Relating to county noise study requirements and site construction approval for facilities operated by certain large load electric customers, authorizing a fee.
What it would do: Authorizes counties to require large load electric customers to conduct pre-construction and post-construction noise studies, obtain site construction approval, and implement mitigation measures to comply with specified maximum sound levels in unincorporated areas.
Introduced
Texas HB 587: Relating to the authority of a county to regulate the construction of certain industrial and offensive land use facilities.
What it would do: Requires a person to obtain a permit from a county commissioners court before constructing an industrial facility or offensive land use facility in unincorporated county areas, and establishes procedures for permit review including at least two public hearings.
Introduced
Texas SB 296: Relating to the siting, construction, permitting, and operation of certain data centers; requiring local option elections; imposing a temporary moratorium; establishing an annual payments to county residents; repealing certain tax exemptions; providing civil penalties.
What it would do: Establishes a two-year moratorium on data center construction, requires voter approval for projects exceeding 20 megawatts or 50,000 square feet, mandates state permits with environmental review, and requires developers to fund annual stipends to county residents equal to the greater of two percent of gross receipts or $10,000 per megawatt. Repeals prior data center tax exemptions.
Introduced
Texas SB 32: Relating to the issuance by the Public Utilities Commission of Texas of a permit for the construction of a large computational load site; providing an administrative penalty.
What it would do: Requires the Public Utilities Commission of Texas, in collaboration with the Texas Commission on Environmental Quality, to issue permits before construction of large computational load sites with at least 75 megawatts of electric power demand, and allows administrative penalties for violations.
Introduced
Texas SB 34: Relating to county authority to regulate the development of certain large electricity users.
What it would do: Authorizes Texas county commissioners courts to establish zoning districts regulating large computational load facilities (data centers, AI operations, cryptocurrency) in unincorporated areas through special permits, infrastructure requirements, and financial assurances, while prohibiting county regulation of electric rates, generation, or transmission siting.
Introduced
Texas SB 36: Relating to the eligibility of data centers and large data center projects to participate in certain incentive programs offered by the state and local governments.
What it would do: Prohibits data centers and large data center projects from participating in local development agreements under Chapters 380 and 381 of the Local Government Code and tax abatement agreements under Chapter 312 of the Tax Code, effective September 1, 2027.
Introduced
Pennsylvania HB 2888: An Act establishing reporting and information submission requirements for hyperscale computer data centers operating in this Commonwealth; providing for alternative compliance payments, for energy plans, for water plans, for regional benefits plans, for ratepayer protections, for community benefit plans and agreements, for municipal comments, for confidentiality, for records, for lists of tenants, for enforcement, for regulations and guidelines and for municipal zoning; imposing duties on the Department of Environmental Protection, the Department of Community and Economic Development and the Pennsylvania Public Utility Commission; and imposing penalties.
What it would do: Requires hyperscale computer data centers in Pennsylvania to submit energy, water, and sustainability plans to state departments; procure specified percentages of incremental clean firm energy or make alternative compliance payments; create jobs and community benefits; and file annual reports on water, electricity use, and plan compliance.
In committee
Virginia SB 850: Data centers, large; moratorium, approval requirements, utility independent classifications, report.
What it would do: Imposes a moratorium on large data center approvals until July 1, 2028, requires public hearings and community investment programs for large data centers, mandates prevailing wage for data center construction, establishes independent utility rate classifications for large data centers, and requires an environmental impact report on data center development.
In committee
New Jersey A 5729: Requires certain State agencies to establish expedited approval and permitting procedures for artificial intelligence data centers that bring their own power.
What it would do: Requires the Board of Public Utilities, Department of Community Affairs, and Department of Environmental Protection to adopt rules establishing expedited approval and permitting procedures for AI data centers powered by on-site natural gas-powered electricity generation systems within 12 months.
In committee
New Jersey S 4304: Prohibits agreements intended to conceal certain information concerning development of data centers under MLUL.
What it would do: Prohibits applicants for data center development from entering into non-disclosure agreements with approving authorities, municipal agencies, and property sellers to conceal development details, declaring such agreements against public policy and unenforceable, and bars approvals if violated.
Passed chamber
Montana LC 846: Generally revise local government laws related to development of data centers
Introduced
New Jersey A 5663: Requires DEP to conduct study on environmental impacts of data center development in State; prohibits construction of new data centers until study is complete.
What it would do: Requires the Department of Environmental Protection to study environmental, infrastructural, and financial impacts of data center development and submit a report within 15 months. Prohibits construction of new data centers and permit issuance until 90 days after the report is submitted.
In committee
Virginia SB 843: Data centers; state permitting, local approval, moratorium, sunset.
What it would do: Prohibits localities from approving data center rezoning, permits, or site plans on or after July 1, 2027, and prohibits state agencies from approving data center permits or authorizing related electric distribution facilities. The moratorium expires July 1, 2030.
In committee
Virginia SB 841: Data centers; public hearing and notice requirements.
What it would do: Adds enhanced public notice and hearing requirements for data center zoning changes, requiring advertisements to include applicant name, anticipated owner/end user, utility infrastructure details, and mandating at least two public hearings for data center rezoning or zoning text amendments.
In committee
New Jersey A 5586: Requires data center developers to provide certain notice to public before preliminary site plan consideration and hearing under MLUL; requires DCA to maintain related public notice website.
What it would do: Requires data center developers to hold community meetings, send direct mail notices within five miles, coordinate social media posts, and provide multilingual information before preliminary site plan approval. Requires the Department of Community Affairs to maintain a public portal aggregating data center development notices.
In committee
Pennsylvania SB 1408: An Act providing for data center transparency; prohibiting certain nondisclosure agreements between public agencies and data centers; providing for data centers and public input; prohibiting data centers from being developed or operated by certain foreign entities; and providing for enforcement by Attorney General and for energy and water reporting.
What it would do: Prohibits public agencies from entering nondisclosure agreements with data centers that restrict public disclosure; requires municipalities to hold at least two public meetings before approving data centers; prohibits data centers controlled by foreign entities of concern from operating in Pennsylvania; and requires energy and water reporting certifications.
Passed committee
Pennsylvania HB 2821: An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, further providing for definitions; and, in subdivision and land development, providing for local option for high impact data centers.
What it would do: Adds definitions for 'data center' and 'high impact data center' (25+ megawatts peak demand) to the Pennsylvania Municipalities Planning Code. Requires municipal voter approval via referendum before a governing body or planning agency can finally approve a high impact data center application.
In committee
New Jersey S 4657: Modifies certain DEP permit application requirements for data centers.
What it would do: Requires data center permit applicants to prepare environmental justice impact statements and conduct public hearings in affected communities one year after the bill's effective date, and authorizes the Department of Environmental Protection to deny new data center permits if approval would cause disproportionate cumulative environmental or public health stressors.
In committee
Michigan HB 6426: Businesses: other; data center local decision protection act; create. Creates new act. TIE BAR WITH: HB 6427'26
What it would do: Creates the Data Center Local Decision Protection Act, requiring large-scale data centers to submit detailed information including energy demand, water use, and environmental impacts for 30-day public review before applications are administratively complete, and establishing procedures for judicial review of local decisions with heightened evidentiary standards and penalties for material misrepresentations.
In committee
Pennsylvania HB 2775: An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in general provisions, further providing for definitions; and, in zoning, further providing for ordinance provisions.
What it would do: Adds definitions for 'commercial data center' (a facility with peak electric demand of at least 25 megawatts used for processing or storing data) and 'large load facility' (at least 10 megawatts peak demand) to Pennsylvania's Municipalities Planning Code. Requires applicants for such facilities to provide documentation of filed electric service applications and paid fees before zoning approval.
Passed committee
Pennsylvania SB 1345: An Act amending the act of July 31, 1968 (P.L.805, No.247), known as the Pennsylvania Municipalities Planning Code, in zoning, providing for optional temporary moratorium on acceptance or consideration of new applications for high impact data centers.
What it would do: Allows Pennsylvania municipalities to adopt temporary moratoriums lasting no longer than 18 months on accepting or considering new applications for high impact data centers (facilities with 25+ megawatts critical IT load) while conducting planning studies, with limited exemptions for previously approved applications and certain power generation facility agreements.
Passed committee
Congress S. 5645: Data Center Community Empowerment Act of 2026
What it would do: Requires the Secretary of Energy to establish a Data Center Community Assistance Program within 180 days to provide State, local, and Tribal governments with technical assistance, information, and analysis regarding energy, water, infrastructure, and economic impacts of data center development, and to develop a publicly accessible toolkit for local officials.
In committee
Congress S. 5658: A bill to prohibit the construction of data centers on Federal land, and for other purposes.
What it would do: Prohibits construction of data centers on National Forest System land and land managed by the Secretary of the Interior, excluding Indian lands. Requires any conveyance of Federal land after enactment to include a reversionary clause returning the land to the United States if used for a data center, unless authorized by Congress.
In committee
New York S 10708: Prohibits nondisclosure agreements intended to conceal information about the development of a data center from the public or intended to prevent public review thereof
What it would do: Prohibits municipal corporations and data centers from entering into nondisclosure agreements that conceal details of data center development or prevent public review, except agreements solely protecting trade secrets.
In committee
Siting, zoning and permitting laws, state by state
- Virginia24 bills, 3 enacted
- New Jersey21 bills
- Pennsylvania17 bills, 1 enacted
- Michigan14 bills
- Congress8 bills
- New York6 bills
- South Carolina6 bills, 1 enacted
- Texas6 bills
- Illinois5 bills
- Indiana5 bills, 1 enacted
- Maryland5 bills
- Kentucky4 bills, 1 enacted
- Minnesota4 bills
- Oklahoma4 bills
- Tennessee4 bills
- Arkansas3 bills
- Arizona3 bills
- California3 bills, 3 enacted
- Florida3 bills, 1 enacted
- Georgia3 bills
- Montana3 bills
- New Hampshire3 bills
- South Dakota3 bills
- West Virginia3 bills
- Delaware2 bills, 1 enacted
- Kansas2 bills
- Missouri2 bills
- North Dakota2 bills
- Ohio2 bills
- Vermont2 bills
- Wisconsin2 bills
- Alaska1 bill
- Colorado1 bill
- Louisiana1 bill
- Nebraska1 bill, 1 enacted
- Washington1 bill
Questions
Which states have siting, zoning and permitting laws?
States that enacted siting, zoning and permitting laws in 2025 and 2026: California (3), Virginia (3), Delaware (1), Florida (1), Indiana (1), Kentucky (1), Nebraska (1), Pennsylvania (1) and South Carolina (1). Laws enacted before 2025 are not listed here.
Which states have the most siting, zoning and permitting bills?
Virginia (24), New Jersey (21), Pennsylvania (17), Michigan (14) and Congress (8). In all, 179 bills in 36 jurisdictions, the latest action on 10 November 2026.
What do siting, zoning and permitting bills cover?
Where data centers may be built, local approvals, setbacks, noise limits and community agreements. Each enacted law above has a line on what it requires.
Is this legal advice?
No. Which bills count as siting, zoning and permitting bills, and the line on what each law requires or each bill would do, are drafted by software and not reviewed by an attorney. Every bill links to the legislature’s own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.
Follow siting, zoning and permitting bills in every state
The Data Centers and Energy Load Tracker sends the bills that moved and a monthly report you can forward to a client.