West Virginia data center and energy laws
What West Virginia has enacted on data center and energy, what each law requires, and what the bills still moving would do. West Virginia is one of 29 states that enacted a data center and energy law in the 2025 and 2026 sessions.
- Bills in scope
- 22bills in scope
- Past committee
- 3past committee
- Most recent action
- 29 June 2026most recent action
Data center and energy laws enacted in West Virginia
One data center and energy law enacted in the West Virginia Legislature in the 2025 and 2026 sessions, newest first. Each links to the legislature's own page.
- HB 4983Authorizing the Department of Commerce to promulgate a legislative rule relating to certification of a microgrid district or certification as a high impact data centerEnacted 29 June 2026
Tax incentives and clawbacks, On-site and co-located generation
Data center and energy in West Virginia, by topic
Tax incentives and clawbacks
9 bills, 1 enacted. Enacted in 11 states.
On-site and co-located generation
4 bills, 1 enacted. Enacted in 5 states.
Water, cooling and emissions
3 bills. Enacted in 7 states.
Siting, zoning and permitting
2 bills. Enacted in 8 states.
Grid reliability and load flexibility
1 bill. Enacted in 11 states.
Data center and energy bills in West Virginia
The bills not yet law, furthest along first, with what each would do.
1Enacted
2Past committee
19Introduced or inactive
22 bills in scope
Past committee
2
What it would do: Creates the Electric Load Forecast Accountability Act requiring the Public Service Commission of West Virginia to review and validate load forecasts submitted by utilities to PJM, coordinate with PJM and other states to prevent duplicate counting, and submit annual reports to the Legislature by December 31 each year, with the act expiring December 31, 2035.
What it would do: Requires electric transmission lines of 400 kilovolts or greater proposed in West Virginia to include construction of an electric substation near industrial parks within five miles of the line, with one substation maximum per 40-mile segment and completion within two years of line energization.
Introduced or inactive
19
What it would do: Permits non-residential retail customers with peak demand exceeding one megawatt to purchase electric power from competitive suppliers starting January 1, 2027, subject to a commission-established capacity allowance of at least 20 percent of each utility's weather-adjusted retail sales, with licensing requirements and cost-shifting protections for remaining ratepayers.
What it would do: Requires certified high impact data centers to provide public notice of anticipated water usage and submit projected withdrawal information to the Department of Environmental Protection, which may condition or deny approval only if withdrawals would reduce available water supply below levels necessary to meet existing lawful demands, and requires annual reporting of actual withdrawals.
What it would do: Amends West Virginia law to prohibit counties and municipalities from regulating certified microgrid districts and high impact data centers through zoning or permitting, while requiring such projects to pay taxes and fees. In growth counties with majority karst hydrogeology, data centers must use surface water rather than groundwater for non-domestic purposes.
What it would do: Prohibits counties and municipalities from enacting ordinances or regulations that limit certified high impact data centers and certified microgrid districts, and exempts these projects from local zoning, permitting, licensing, and land use requirements while requiring them to pay taxes, fees, and utility charges.
What it would do: Permits non-residential retail customers with peak demand exceeding one megawatt to purchase electric power from competitive suppliers starting January 1, 2027, subject to a commission-established capacity allowance of at least 20 percent of each utility's weather-adjusted retail sales, with licensing requirements and rate transparency provisions.
What it would do: Prohibits data centers in West Virginia from facilitating warrantless collection of data by the NSA or other federal agencies in violation of the Fourth Amendment or West Virginia Constitution, and requires annual reporting to the Joint Standing Committee on Technology and Infrastructure regarding data collected, uses, and end users.
What it would do: Amends West Virginia law to create a High Impact Data Center Program within the Division of Economic Development to encourage data center development, but prohibits the state and any political subdivision from subsidizing any data center in West Virginia.
What it would do: Modifies the distribution of ad valorem property tax revenue from high-impact data centers to provide 80 percent of the tax increment to the situs county, and clarifies that the Personal Income Tax Reduction Fund is funded by data center tax increment distributions.
What it would do: Establishes a High Impact Data Center Program requiring data centers meeting specified criteria to notify the Department of Economic Development and obtain water resource certification from the Department of Environmental Protection, which may limit or prohibit water withdrawals if adverse impacts to state water resources will occur. Requires public hearings and comment periods before final approval.
What it would do: Prohibits data centers from withdrawing groundwater or aquifer water for cooling and requires them to use closed-loop systems, air cooling, or reclaimed water instead. Imposes daily civil penalties of at least $50,000 for violations and requires pre-construction hydrogeologic studies.
What it would do: Prohibits counties and municipalities from enacting ordinances or regulations that limit certified microgrid districts or certified high impact data centers, and exempts these projects from local zoning, building permits, and licensing requirements while preserving their obligation to pay taxes and utility fees.
What it would do: Creates tax incentives for data centers making at least $50 million capital investment, creating 50+ jobs, and using 80% coal-generated electricity: salvage value property tax treatment, sales tax exemption on equipment, and B&O tax exemption for coal-fired utilities supplying them.
What it would do: Requires Public Service Commission rules and regulations to be subject to legislative rule-making review procedures and defines data centers as physical locations storing computing machines and related hardware infrastructure.
What it would do: Establishes certified microgrid districts and high-impact data center programs to attract data center development; exempts these projects from local zoning and permitting; creates special property tax distribution formulas directing incremental tax revenue to state funds and local governments; prohibits payment-in-lieu-of-taxes and tax increment financing for electricity generation property.
What it would do: Amends the ad valorem property valuation statute to specify that electronic data processing services, including data center operations and high-performance computing for digital, blockchain, and artificial intelligence technologies, qualify as high-technology businesses whose servers and tangible personal property are valued at salvage value for tax purposes.
What it would do: Creates tax incentives for data centers meeting specified criteria: salvage value property tax treatment, business and occupation tax exemption for coal-generated electricity supplied to them, and sales tax exemption for equipment and materials used in their operation and maintenance.
What it would do: Creates tax incentives for data centers meeting specified criteria, including salvage value property tax treatment, sales tax exemption for equipment, and exemption from business and occupation tax for coal-generated electricity supplied to qualifying data centers.
Bill titles link to the West Virginia Legislature's own page.
What counts as data center and energy legislation
In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.
Questions
Does West Virginia have a data center and energy law?
Yes. West Virginia enacted 1 data center and energy law in the 2025 and 2026 sessions, among them HB 4983. Each is listed on this page with what it requires.
Which data center and energy bills are moving in West Virginia?
2 bills not yet law have passed a committee or a chamber, the furthest along HB 4481 (passed chamber) and HB 4971 (passed chamber).
What does West Virginia legislate on most in data center and energy?
Tax incentives and clawbacks (9 bills), On-site and co-located generation (4 bills) and Water, cooling and emissions (3 bills).
Are these summaries reviewed by a lawyer?
No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.
Other practice areas in West Virginia
- AI in West Virginia14
- Alcohol in West Virginia48
- Cannabis in West Virginia37
- Children's Online Safety in West Virginia9
- Cybersecurity in West Virginia9
- Data Privacy in West Virginia20
- Employment in West Virginia113
- Healthcare in West Virginia199
- Insurance in West Virginia175
- Intellectual Property in West Virginia7
- Packaging and PFAS in West Virginia2
- Payments and fintech in West Virginia13
- Rental housing in West Virginia14
- Tobacco and nicotine in West Virginia31
- Transportation in West Virginia14
- All jurisdictions
Data center and energy legislation in other jurisdictions
49 more currently hold bills in this tracker
- Virginia83
- New Jersey68
- Congress61
- Pennsylvania38
- Michigan35
- Illinois23
- Maryland21
- New York19
- California16
- South Dakota14
- Minnesota13
- Oklahoma13
- South Carolina13
- Georgia12
- Indiana12
- Iowa11
- Montana11
- Ohio11
- Tennessee11
- Texas11
- Arkansas9
- Arizona9
- Connecticut9
- Idaho9
- Louisiana9
- North Carolina9
- Nebraska8
- Utah8
- Wisconsin8
- Delaware7
- Kentucky7
- Washington7
- Kansas6
- New Hampshire6
- Colorado5
- Florida5
- Missouri5
- Massachusetts4
- North Dakota4
- Rhode Island4
- Vermont4
- Maine3
- Oregon3
- Alaska2
- Alabama2
- Hawaii2
- Mississippi2
- New Mexico2
- Wyoming2
Know when West Virginia's data center and energy law changes
An alert when a bill moves, and one report a month on what changed in every state and Congress.