Maryland data center and energy laws

What Maryland has enacted on data center and energy, what each law requires, and what the bills still moving would do. Maryland is one of 29 states that enacted a data center and energy law in the 2025 and 2026 sessions.

9 new Maryland laws take effect in 2027

Bills in scope
21bills in scope
Past committee
2past committee
Most recent action
12 May 2026most recent action

Data center and energy laws enacted in Maryland

One data center and energy law enacted in the Maryland Legislature in the 2025 and 2026 sessions, newest first. Each links to the legislature's own page.

  • HB 1532Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) ActTook effect 1 June 2026

    What it requires: Investor-owned electric companies, electric cooperatives, and municipal electric utilities must submit specific rate schedules for large load customers by September 1, 2026, lowering the monthly maximum demand threshold from 100 to 25 megawatts. Public service companies must comply with multiyear rate plan restrictions prohibiting reconciliation filings that result in additional customer charges. Electric and gas companies must develop and implement greenhouse gas emissions reduction plans on revised cycles.

Data center and energy in Maryland, by topic

Data center and energy bills in Maryland

The bills not yet law, furthest along first, with what each would do.

1Enacted

1Cleared both chambers

19Introduced or inactive

21 bills in scope

Cleared both chambers

1

HB 270Data Center Impact Analysis and ReportVetoed

What it would do: Requires the Department of the Environment, Maryland Energy Administration, and University of Maryland School of Business to conduct an analysis of data center development impacts on environmental, energy, and economic factors, with a final report due to the Governor and General Assembly by September 1, 2026.

Introduced or inactive

19

HB 1287Certificate of Public Convenience and Necessity - BURDEN Analysis (CHERISH Our Communities Act)In committee

What it would do: Requires applications for certificates of public convenience and necessity for generating stations in at-risk census tracts to include a BURDEN report detailing existing environmental and public health burdens. Requires the Public Service Commission to deny applications if they will cause or contribute to adverse environmental or public health stressors unless the applicant demonstrates public interest.

SB 992Public Utilities - Large Load Customers - Registration and Demand Response ProgramIn committee

What it would do: Requires large load customers with at least 25 megawatts monthly demand and over 80% load factor to register with the Public Service Commission before interconnecting to the electric system. Establishes a demand response program for these customers and makes qualifying data centers eligible for sales and use tax exemptions.

SB 1000Certificates of Public Convenience and Necessity and Construction of Data CentersIn committee

What it would do: Expands transmission line certificate requirements to all lines over 69,000 volts, requires the Public Service Commission to establish criteria for waiving certificates for existing transmission lines, and prohibits data center construction in Baltimore City development districts subject to tax increment repayment on outstanding bonds.

SB 853Economic Development Activity - Nondisclosure AgreementsIn committee

What it would do: Prohibits employees, contractors, and consultants of the State, local governments, and the General Assembly from entering into nondisclosure agreements with persons involved in economic development activities, including data center operations. Includes public service companies as instrumentalities of the State under the Public Information Act.

HB 1595Property Taxes - Authority of Counties to Establish a Subclass and Set a Special Rate for Personal Property of Data CentersIn committee

What it would do: Authorizes Baltimore City and counties to establish a personal property tax subclass for qualified data centers and set a single special tax rate for that subclass, effective for taxable years beginning after June 30, 2026.

HB 1411Data Center Planning and Transparency ActIn committee

What it would do: Requires large-scale data center owners to submit disclosure reports to state and local agencies 60 days before applying for permits or state financial assistance. Requires local jurisdictions with 10,000+ residents to adopt data center plans and zoning regulations by June 30, 2027, and restricts state financial assistance to compliant facilities.

HB 1534Data Centers - Standards for Operation and SitingIn committee

What it would do: Requires data center owners to comply with sound, vibration, and backup power standards established by the Department of Environment, including protections for schools and residential areas. Prohibits data center construction on prime agricultural land, in rural legacy areas, or on land with agricultural easements unless no industrial zones are available.

HB 1082Large Load Customers - Data Centers and Rate Schedule RequirementsIn committee

What it would do: Applies large load customer rate schedule requirements to data centers regardless of demand thresholds, and extends the deadline for electric companies to submit rate schedules to the Public Service Commission from September 1, 2026 to January 1, 2027.

HB 940Large Load Customers - Electric System Interconnection and Demand Response ProgramIn committee

What it would do: Exempts large load customers (at least 25 megawatts with over 80% load factor) from certificate requirements, establishes interconnection and demand response processes, requires customers to provide 25% of load capacity through storage or clean energy, and directs study of surplus interconnection potential.

SB 26Public Utilities - Off-Grid Electricity Providers - ExemptionIn committee

What it would do: Exempts off-grid electricity providers that do not interconnect with the state's electric system, cross state lines, or use federal, state, or local roadways from most Public Utilities Article provisions, but requires compliance with certificate and approval requirements for generating facilities. Applies to providers beginning operations on or after October 1, 2026.

HB 799Maryland Co-Location Energy Innovation and Reliability ActIn committee

What it would do: Requires the Public Service Commission to adopt regulations for generating stations co-located with data centers that are not interconnected to the electric grid, including requirements for backup power, cybersecurity, and annual reporting on energy use and environmental impact.

HB 560Sales and Use Tax and Property Tax - Exemptions for Data Centers - RepealIn committee

What it would do: Repeals the sales and use tax exemption for qualified data center personal property and repeals the authorization for counties and municipal corporations to reduce or eliminate property tax assessments on qualified data center personal property, effective July 1, 2026.

HB 120Moratorium on Construction of New Data Centers - Co-Location and Generation ContingencyIn committee

What it would do: Prohibits any person from constructing a data center in Maryland and prohibits state or local government from approving data center construction proposals. The prohibition terminates if the General Assembly enacts legislation requiring new data centers to be co-located with specified power generation facilities.

SB 903Data Centers - Fast Track Pass for Co-Location and Sales and Use TaxIn committee

What it would do: Establishes an expedited 6-month review process for data center projects with co-located energy generation that receive a fast track pass from a new advisory committee. Modifies data center sales and use tax exemption requirements to mandate power usage efficiency standards, renewable energy sourcing, and allows the Department to limit exemptions based on economic development priorities.

HB 1219Maryland Co-Location Energy Innovation and Reliability ActIn committee

What it would do: Requires the Public Service Commission to adopt regulations for generating stations co-located with data centers that are not interconnected to the electric grid, defining them as independent resources exempt from retail electric customer laws, distribution fees, and renewable energy portfolio standards.

HB 1338Public Utilities - Certificates of Public Convenience and Necessity - Energy Storage DevicesIn committee

What it would do: Requires a person to obtain a certificate of public convenience and necessity from the Public Service Commission before beginning construction of an energy storage device with a minimum capacity of 2 megawatts installed in front of the meter, subjecting such devices to the same regulatory process as generating stations and transmission lines.

SB 952Certificate of Public Convenience and Necessity - Overhead Transmission Lines - Grid Enhancing TechnologiesIn committee

What it would do: Requires the Public Service Commission to consider grid enhancing technologies as an alternative to constructing new overhead transmission lines when reviewing certificate of public convenience and necessity applications, and defines grid enhancing technologies as infrastructure that increases transmission line capacity, efficiency, reliability, or resilience.

HB 900Electricity - Data Centers - Rate Schedule and RequirementsIn committee

What it would do: Requires each electric company to submit a specific rate schedule for data center customers by July 1, 2026, with minimum contract terms of at least 20 years plus load ramp period, load ramp capacity requirements, financial responsibility provisions, and collateral requirements.

HB 949Calvert County - Payment in Lieu of Taxes Agreements - Qualified Data CentersIn committee

What it would do: Authorizes Calvert County's governing body to enter into payment in lieu of taxes agreements with qualified data center owners, allowing negotiated annual payments in place of county property taxes on specified property for the agreement term.

Bill titles link to the Maryland Legislature's own page.

What LawSignals covers

What counts as data center and energy legislation

In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.

Questions

Does Maryland have a data center and energy law?

Yes. Maryland enacted 1 data center and energy law in the 2025 and 2026 sessions, among them HB 1532. Each is listed on this page with what it requires.

When do Maryland's data center and energy laws take effect?

HB 1532 on 1 June 2026.

Which data center and energy bills are moving in Maryland?

1 bill not yet law has passed a committee or a chamber, the furthest along HB 270 (vetoed).

What does Maryland legislate on most in data center and energy?

Grid reliability and load flexibility (8 bills), Siting, zoning and permitting (5 bills) and On-site and co-located generation (5 bills).

Are these summaries reviewed by a lawyer?

No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.

Know when Maryland's data center and energy law changes

An alert when a bill moves, and one report a month on what changed in every state and Congress.