Every data center and energy bill in the Arizona Legislature, what each would do, and where it stands. 29 states enacted data center and energy laws in the 2025 and 2026 sessions. Arizona has bills in progress and none enacted yet.
- Bills in scope
- 9bills in scope
- Past committee
- 0past committee
- Most recent action
- 10 June 2026most recent action
Data center and energy in Arizona, by topic
Large-load tariffs and cost allocation
4 bills. Enacted in 19 states.
On-site and co-located generation
3 bills. Enacted in 5 states.
Siting, zoning and permitting
2 bills. Enacted in 8 states.
Tax incentives and clawbacks
2 bills. Enacted in 11 states.
Data center and energy bills in Arizona
The bills not yet law, furthest along first, with what each would do.
9Introduced or inactive
9 bills in scope
Introduced or inactive
9
What it would do: Allows utilities to construct new plants colocated with large industrial energy users without obtaining a certificate of environmental compatibility, provided the utility gives 30 days' notice and holds a public comment session. Requires the commission to adopt rules defining colocation and large industrial energy user.
What it would do: Requires county comprehensive plans to include planning for data centers and small modular reactors with sufficient location and extent designations to not prevent their effective use, and requires counties above certain population thresholds to amend plans within two years.
What it would do: Requires the State Land Department to develop a map within two years identifying state land parcels best suited for computer data centers, in consultation with the industry, and to consider this map when creating land use plans.
What it would do: Allows large customers with at least 25 megawatts peak demand to generate and self-supply electricity through dedicated generation and private lines, subject to registration with the Arizona Corporation Commission and restrictions on serving only the customer and affiliated loads.
What it would do: Requires public power entities and the corporation commission to mandate that large data centers with peak demand of at least 100 megawatts pay all energy costs related to their operation, preventing those costs from being passed to other customers.
What it would do: Requires public power entities and the corporation commission to make large load customers using at least 50 megawatts at a single site pay for all energy costs they incur, preventing those costs from being passed to other customers.
What it would do: Amends Arizona's computer data center tax relief statute to change the application deadline from December 31, 2033 to December 31, 2026, preventing the authority from certifying new computer data centers that submit applications after the earlier date.
What it would do: Repeals the computer data center tax relief statute. Adds new requirements that computer data centers use only renewable energy with battery storage and limit water cooling to 115 gallons per day per 1,000 square feet, effective December 31, 2026, enforced by the Corporation Commission.
What it would do: Requires computer data center owners or operators to submit a cost responsibility agreement with the electric utility serving the facility, obligating them to pay all costs associated with dedicated upgrades required to serve the data center, as a condition for tax relief certification.
Bill titles link to the Arizona Legislature's own page.
What counts as data center and energy legislation
In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.
Questions
Does Arizona have a data center and energy law?
None of the 9 data center and energy bills in the Arizona Legislature has been enacted in the 2025 and 2026 sessions.
What does Arizona legislate on most in data center and energy?
Large-load tariffs and cost allocation (4 bills), On-site and co-located generation (3 bills) and Siting, zoning and permitting (2 bills).
Are these summaries reviewed by a lawyer?
No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.
Other practice areas in Arizona
- AI in Arizona20
- Alcohol in Arizona14
- Cannabis in Arizona25
- Children's Online Safety in Arizona16
- Cybersecurity in Arizona6
- Data Privacy in Arizona20
- Employment in Arizona74
- Healthcare in Arizona201
- Insurance in Arizona91
- Intellectual Property in Arizona7
- Packaging and PFAS in Arizona3
- Payments and fintech in Arizona12
- Rental housing in Arizona59
- Tobacco and nicotine in Arizona10
- Transportation in Arizona15
- All jurisdictions
Data center and energy legislation in other jurisdictions
49 more currently hold bills in this tracker
- Virginia83
- New Jersey68
- Congress61
- Pennsylvania38
- Michigan35
- Illinois23
- West Virginia22
- Maryland21
- New York19
- California16
- South Dakota14
- Minnesota13
- Oklahoma13
- South Carolina13
- Georgia12
- Indiana12
- Iowa11
- Montana11
- Ohio11
- Tennessee11
- Texas11
- Arkansas9
- Connecticut9
- Idaho9
- Louisiana9
- North Carolina9
- Nebraska8
- Utah8
- Wisconsin8
- Delaware7
- Kentucky7
- Washington7
- Kansas6
- New Hampshire6
- Colorado5
- Florida5
- Missouri5
- Massachusetts4
- North Dakota4
- Rhode Island4
- Vermont4
- Maine3
- Oregon3
- Alaska2
- Alabama2
- Hawaii2
- Mississippi2
- New Mexico2
- Wyoming2
Know when Arizona's data center and energy law changes