California data center and energy laws

What California has enacted on data center and energy, what each law requires, and what the bills still moving would do. California is one of 29 states that enacted a data center and energy law in the 2025 and 2026 sessions.

167 new California laws take effect in 2027, 9 on data center and energy

Bills in scope
16bills in scope
Past committee
14past committee
Most recent action
21 September 2026most recent action

Data center and energy laws enacted in California

10 data center and energy laws enacted in the California Legislature in the 2025 and 2026 sessions, newest first. Each links to the legislature's own page.

  • AB 1577Data centers: reporting.Takes effect 1 January 2027

    What it requires: Owners of data centers must submit specified information to the State Energy Resources Conservation and Development Commission upon energization and monthly thereafter, including electrical load, energy consumption, power usage effectiveness, and fuel consumption. Owners or developers must submit energy consumption and sound level estimates to applicable local agencies when applying for discretionary permits.

    Siting, zoning and permitting, Water, cooling and emissions

  • AB 2383Electricity: data centers.Takes effect 1 January 2027

    What it requires: The Public Utilities Commission must establish by January 1, 2028 a separate tariff classification for large energy use facilities. Electrical corporations and load-serving entities receiving service requests from large energy use facilities must ensure tariffs allocate costs proportionally, avoid cost-shifting to other consumers, and meet specified requirements including minimum 10-year contract terms and prohibitions on net metering.

    Large-load tariffs and cost allocation

  • AB 2469Data centers: water use disclosures.Takes effect 1 January 2027

    What it requires: Cities, counties, or cities and counties must not approve discretionary or ministerial permits or other entitlements for data center construction or expansion increasing maximum peak water use unless the applicant provides a water supply assessment, water use assessment upon request, water scarcity plan beginning January 1, 2028, projected water use, water efficiency measures, and workforce disclosures, and assumes full cost of required water infrastructure improvements. The Department of Water Resources must recommend a CII water use classification for large consumptive use facilities including data centers by June 30, 2028, and the State Water Resources Control Board must adopt it by December 31, 2029.

    Siting, zoning and permitting, Water, cooling and emissions

  • AB 2619Water resources: data centers.Takes effect 1 January 2027

    What it requires: Persons who own or operate data centers must provide water suppliers with estimated water use information before applying for initial city or county business licenses, and must report estimated water use on initial license applications and actual annual water use on renewal applications, all under penalty of perjury. The Department of Water Resources and State Energy Resources Conservation and Development Commission must develop guidelines and best practices for data center water efficiency by January 1, 2029.

    Water, cooling and emissions

  • SB 1168Data centers: rate structures.Takes effect 1 January 2027

    What it requires: The Public Utilities Commission must assess opportunities for rate structures in new or existing proceedings to ensure data centers pay their reasonable share of transmission and distribution costs, pay their proportionate share of load increases and procurements needed to reliably serve their loads, and alleviate cost pressures on residential ratepayers.

    Large-load tariffs and cost allocation

  • SB 886California Technology Innovation and Ratepayer Protection Act.Takes effect 1 January 2027

    What it requires: The Public Utilities Commission must establish separate tariffs for interconnection and transmission, distribution, and optional generation services to participating customers (data centers with minimum peak demand not exceeding 25 megawatts) by July 1, 2027. The commission must ensure tariffs prevent cost shifts to nonparticipating customers and require participating customers to prefund at least 10-year generation contracts and participate in demand response programs.

    Large-load tariffs and cost allocation

  • SB 887California Environmental Quality Act: environmental leadership development projects: data centers: geothermal powerplant projects.Takes effect 1 January 2027

    What it requires: Projects for development and operation of data centers cannot be exempted from CEQA review. Data center projects may be certified as environmental leadership development projects only if they meet specified conditions including paying full interconnection costs, using zero-carbon energy and storage, recycled water, and entering community benefits agreements. The State Energy Resources Conservation and Development Commission must develop uniform statewide standards for data center conditions and require regular compliance reporting.

    Siting, zoning and permitting, On-site and co-located generation

  • AB 2266Electricity: load-serving entities.Takes effect 1 January 2027

    What it requires: On and after January 1, 2030, the Public Utilities Commission must use the same capacity valuation method when setting resource adequacy and resource procurement obligations for load-serving entities. By January 1, 2030, the commission must consolidate plans submitted by load-serving entities into a single procurement plan and consolidate compliance reporting when feasible.

    Grid reliability and load flexibility

  • AB 2476Electricity: integrated resource plans: Department of Water Resources: procurement.Takes effect 1 January 2027

    What it requires: The Department of Water Resources may procure eligible energy resources from pump hydroelectric facilities not exceeding 500 megawatts before January 1, 2035, upon request from the Public Utilities Commission. The bill eliminates the prior requirement that such facilities be directly appropriated state funding before January 1, 2023.

    Grid reliability and load flexibility

  • SB 57Electrical corporations: data centers: report.Enacted 11 October 2025

    What it requires: The Public Utilities Commission may assess whether electrical corporation costs associated with new loads from data centers result in cost shifts to other customers. The commission must submit this assessment to relevant legislative policy committees and publicly post it on its website on or before January 1, 2027.

    Large-load tariffs and cost allocation

Data center and energy in California, by topic

Data center and energy bills in California

The bills not yet law, furthest along first, with what each would do.

10Enacted

2Cleared both chambers

2Past committee

2Introduced or inactive

16 bills in scope

Cleared both chambers

2

AB 1761Electricity: calculation methodology: nonbypassable charges: data disclosure.Vetoed

What it would do: Requires the Public Utilities Commission to ensure all data underlying decisions on calculation methodologies for charges to recover costs of contracts and generation is disclosed to load-serving entities and ratepayer advocates, except market-sensitive data disclosed under nondisclosure agreements.

AB 93Water resources: data centers.Vetoed

What it would do: Requires data center owners or operators to provide water suppliers with estimated water use before applying for initial city or county business licenses, and to self-certify compliance on applications. Authorizes the Department of Water Resources to establish tiered efficiency standards for data centers based on water consumption factors.

Past committee

2

SB 978Data centers: labor: electricity rates.Passed committee

What it would do: Requires the Public Utilities Commission to establish a special rate structure for data centers using at least 75 megawatts of transmission-level electricity, requiring data centers to pay infrastructure upgrade costs and comply with prevailing wage requirements for construction workers.

AB 222Data centers: power usage effectiveness: cost shifts.Passed chamber

What it would do: Requires data center developers to estimate and publish energy used to develop and operate covered models, with California-generated percentages. Requires Energy Commission to track data center power usage effectiveness and assess electrical load trends. Requires PUC to minimize cost shifts to ratepayers from data center construction.

Introduced or inactive

2

AB 1095Data centers: waste heat energy.Dead

What it would do: Authorizes the California Infrastructure and Economic Development Bank to provide financial assistance for data center waste heat capture and conversion projects, and allows data centers to receive renewable energy credits for waste heat energy generated and used on-site or for building heating.

AB 388Electricity.Dead

What it would do: Excludes certain solar or wind generators from electrical corporation regulation if electricity transmits exclusively through private lines to a single facility for electrolytic hydrogen production or industrial process heat. Requires the Public Utilities Commission to establish a tariff for qualified self-generation projects exceeding 80,000 kilowatts by July 1, 2027.

Bill titles link to the California Legislature's own page.

What LawSignals covers

What counts as data center and energy legislation

In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.

Questions

Does California have a data center and energy law?

Yes. California enacted 10 data center and energy laws in the 2025 and 2026 sessions, among them AB 1577, AB 2383 and AB 2469. Each is listed on this page with what it requires.

When do California's data center and energy laws take effect?

AB 1577 on 1 January 2027, AB 2383 on 1 January 2027, AB 2469 on 1 January 2027, AB 2619 on 1 January 2027 and SB 1168 on 1 January 2027. The others have no single date in their text.

Which data center and energy bills are moving in California?

4 bills not yet law have passed a committee or a chamber, the furthest along AB 1761 (vetoed), AB 93 (vetoed) and SB 978 (passed committee).

What does California legislate on most in data center and energy?

Large-load tariffs and cost allocation (8 bills), Water, cooling and emissions (6 bills) and Siting, zoning and permitting (3 bills).

Are these summaries reviewed by a lawyer?

No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.