California data center and energy laws
What California has enacted on data center and energy, what each law requires, and what the bills still moving would do. California is one of 29 states that enacted a data center and energy law in the 2025 and 2026 sessions.
167 new California laws take effect in 2027, 9 on data center and energy
- Bills in scope
- 16bills in scope
- Past committee
- 14past committee
- Most recent action
- 21 September 2026most recent action
Data center and energy laws enacted in California
10 data center and energy laws enacted in the California Legislature in the 2025 and 2026 sessions, newest first. Each links to the legislature's own page.
What it requires: Owners of data centers must submit specified information to the State Energy Resources Conservation and Development Commission upon energization and monthly thereafter, including electrical load, energy consumption, power usage effectiveness, and fuel consumption. Owners or developers must submit energy consumption and sound level estimates to applicable local agencies when applying for discretionary permits.
Siting, zoning and permitting, Water, cooling and emissions
What it requires: The Public Utilities Commission must establish by January 1, 2028 a separate tariff classification for large energy use facilities. Electrical corporations and load-serving entities receiving service requests from large energy use facilities must ensure tariffs allocate costs proportionally, avoid cost-shifting to other consumers, and meet specified requirements including minimum 10-year contract terms and prohibitions on net metering.
Large-load tariffs and cost allocation
What it requires: Cities, counties, or cities and counties must not approve discretionary or ministerial permits or other entitlements for data center construction or expansion increasing maximum peak water use unless the applicant provides a water supply assessment, water use assessment upon request, water scarcity plan beginning January 1, 2028, projected water use, water efficiency measures, and workforce disclosures, and assumes full cost of required water infrastructure improvements. The Department of Water Resources must recommend a CII water use classification for large consumptive use facilities including data centers by June 30, 2028, and the State Water Resources Control Board must adopt it by December 31, 2029.
Siting, zoning and permitting, Water, cooling and emissions
What it requires: Persons who own or operate data centers must provide water suppliers with estimated water use information before applying for initial city or county business licenses, and must report estimated water use on initial license applications and actual annual water use on renewal applications, all under penalty of perjury. The Department of Water Resources and State Energy Resources Conservation and Development Commission must develop guidelines and best practices for data center water efficiency by January 1, 2029.
Water, cooling and emissions
What it requires: The Public Utilities Commission must assess opportunities for rate structures in new or existing proceedings to ensure data centers pay their reasonable share of transmission and distribution costs, pay their proportionate share of load increases and procurements needed to reliably serve their loads, and alleviate cost pressures on residential ratepayers.
Large-load tariffs and cost allocation
What it requires: The Public Utilities Commission must establish separate tariffs for interconnection and transmission, distribution, and optional generation services to participating customers (data centers with minimum peak demand not exceeding 25 megawatts) by July 1, 2027. The commission must ensure tariffs prevent cost shifts to nonparticipating customers and require participating customers to prefund at least 10-year generation contracts and participate in demand response programs.
Large-load tariffs and cost allocation
- SB 887California Environmental Quality Act: environmental leadership development projects: data centers: geothermal powerplant projects.Takes effect 1 January 2027
What it requires: Projects for development and operation of data centers cannot be exempted from CEQA review. Data center projects may be certified as environmental leadership development projects only if they meet specified conditions including paying full interconnection costs, using zero-carbon energy and storage, recycled water, and entering community benefits agreements. The State Energy Resources Conservation and Development Commission must develop uniform statewide standards for data center conditions and require regular compliance reporting.
Siting, zoning and permitting, On-site and co-located generation
What it requires: On and after January 1, 2030, the Public Utilities Commission must use the same capacity valuation method when setting resource adequacy and resource procurement obligations for load-serving entities. By January 1, 2030, the commission must consolidate plans submitted by load-serving entities into a single procurement plan and consolidate compliance reporting when feasible.
Grid reliability and load flexibility
- AB 2476Electricity: integrated resource plans: Department of Water Resources: procurement.Takes effect 1 January 2027
What it requires: The Department of Water Resources may procure eligible energy resources from pump hydroelectric facilities not exceeding 500 megawatts before January 1, 2035, upon request from the Public Utilities Commission. The bill eliminates the prior requirement that such facilities be directly appropriated state funding before January 1, 2023.
Grid reliability and load flexibility
What it requires: The Public Utilities Commission may assess whether electrical corporation costs associated with new loads from data centers result in cost shifts to other customers. The commission must submit this assessment to relevant legislative policy committees and publicly post it on its website on or before January 1, 2027.
Large-load tariffs and cost allocation
Data center and energy in California, by topic
Large-load tariffs and cost allocation
8 bills, 4 enacted. Enacted in 19 states.
Water, cooling and emissions
6 bills, 3 enacted. Enacted in 7 states.
Siting, zoning and permitting
3 bills, 3 enacted. Enacted in 8 states.
Grid reliability and load flexibility
2 bills, 2 enacted. Enacted in 11 states.
On-site and co-located generation
2 bills, 1 enacted. Enacted in 5 states.
Data center and energy bills in California
The bills not yet law, furthest along first, with what each would do.
10Enacted
2Cleared both chambers
2Past committee
2Introduced or inactive
16 bills in scope
Cleared both chambers
2
What it would do: Requires the Public Utilities Commission to ensure all data underlying decisions on calculation methodologies for charges to recover costs of contracts and generation is disclosed to load-serving entities and ratepayer advocates, except market-sensitive data disclosed under nondisclosure agreements.
What it would do: Requires data center owners or operators to provide water suppliers with estimated water use before applying for initial city or county business licenses, and to self-certify compliance on applications. Authorizes the Department of Water Resources to establish tiered efficiency standards for data centers based on water consumption factors.
Past committee
2
What it would do: Requires the Public Utilities Commission to establish a special rate structure for data centers using at least 75 megawatts of transmission-level electricity, requiring data centers to pay infrastructure upgrade costs and comply with prevailing wage requirements for construction workers.
What it would do: Requires data center developers to estimate and publish energy used to develop and operate covered models, with California-generated percentages. Requires Energy Commission to track data center power usage effectiveness and assess electrical load trends. Requires PUC to minimize cost shifts to ratepayers from data center construction.
Introduced or inactive
2
What it would do: Authorizes the California Infrastructure and Economic Development Bank to provide financial assistance for data center waste heat capture and conversion projects, and allows data centers to receive renewable energy credits for waste heat energy generated and used on-site or for building heating.
What it would do: Excludes certain solar or wind generators from electrical corporation regulation if electricity transmits exclusively through private lines to a single facility for electrolytic hydrogen production or industrial process heat. Requires the Public Utilities Commission to establish a tariff for qualified self-generation projects exceeding 80,000 kilowatts by July 1, 2027.
Bill titles link to the California Legislature's own page.
What counts as data center and energy legislation
In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.
Questions
Does California have a data center and energy law?
Yes. California enacted 10 data center and energy laws in the 2025 and 2026 sessions, among them AB 1577, AB 2383 and AB 2469. Each is listed on this page with what it requires.
When do California's data center and energy laws take effect?
AB 1577 on 1 January 2027, AB 2383 on 1 January 2027, AB 2469 on 1 January 2027, AB 2619 on 1 January 2027 and SB 1168 on 1 January 2027. The others have no single date in their text.
Which data center and energy bills are moving in California?
4 bills not yet law have passed a committee or a chamber, the furthest along AB 1761 (vetoed), AB 93 (vetoed) and SB 978 (passed committee).
What does California legislate on most in data center and energy?
Large-load tariffs and cost allocation (8 bills), Water, cooling and emissions (6 bills) and Siting, zoning and permitting (3 bills).
Are these summaries reviewed by a lawyer?
No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.
Other practice areas in California
- AI in California78
- Alcohol in California31
- Cannabis in California18
- Children's Online Safety in California21
- Cybersecurity in California9
- Data Privacy in California50
- Employment in California196
- Healthcare in California246
- Insurance in California146
- Intellectual Property in California10
- Packaging and PFAS in California36
- Payments and fintech in California15
- Rental housing in California44
- Tobacco and nicotine in California8
- Transportation in California30
- All jurisdictions
Data center and energy legislation in other jurisdictions
49 more currently hold bills in this tracker
- Virginia83
- New Jersey68
- Congress61
- Pennsylvania38
- Michigan35
- Illinois23
- West Virginia22
- Maryland21
- New York19
- South Dakota14
- Minnesota13
- Oklahoma13
- South Carolina13
- Georgia12
- Indiana12
- Iowa11
- Montana11
- Ohio11
- Tennessee11
- Texas11
- Arkansas9
- Arizona9
- Connecticut9
- Idaho9
- Louisiana9
- North Carolina9
- Nebraska8
- Utah8
- Wisconsin8
- Delaware7
- Kentucky7
- Washington7
- Kansas6
- New Hampshire6
- Colorado5
- Florida5
- Missouri5
- Massachusetts4
- North Dakota4
- Rhode Island4
- Vermont4
- Maine3
- Oregon3
- Alaska2
- Alabama2
- Hawaii2
- Mississippi2
- New Mexico2
- Wyoming2
Know when California's data center and energy law changes
An alert when a bill moves, and one report a month on what changed in every state and Congress.