Data center and energy laws enacted in Florida

One data center and energy law enacted in the Florida Legislature in the 2025 and 2026 sessions, newest first. Each links to the legislature's own page.

  • SB 484Data CentersTook effect 1 July 2026

    What it requires: Public utilities must file tariffs by October 1, 2026 ensuring large load customers bear their full cost of service without shifting costs to other ratepayers. Public utilities may not knowingly provide electric service to foreign entities qualifying as large load customers. Water management districts and the Department of Environmental Protection must require reclaimed water use by large-scale data centers when feasible.

    Large-load tariffs and cost allocation, Siting, zoning and permitting, Water, cooling and emissions

Data center and energy in Florida, by topic

Data center and energy bills in Florida

The bills not yet law, furthest along first, with what each would do.

1Enacted

1Past committee

3Introduced or inactive

5 bills in scope

Past committee

1

HB 1007Data CentersPassed committee

What it would do: Prohibits state agencies from entering nondisclosure agreements restricting data center information disclosure. Requires local governments to regulate large load customers and data centers through zoning; mandates noise studies for data centers near residences; requires utilities to develop tariffs ensuring large load customers bear full service costs and prohibits service to foreign entities.

Introduced or inactive

3

HB 1517Approval of Data Center FacilitiesDead

What it would do: Requires data center facility applications to include detailed disclosures on energy management, water use, waste disposal, emissions, worker safety, and security standards. Mandates public posting by the Department of Environmental Protection and local governments, with a 30-day review period before approval, and imposes fines up to $10,000 for non-compliance.

SB 1118Public Records/Data CentersDead

What it would do: Exempts from public records requirements information about a person's plans, intentions, or interests to locate a data center in a county or municipality for 12 months, while requiring disclosure that the project is a data center and allowing disclosure to agencies with regulatory responsibility.

HB 817Taxes on the Rental of Real PropertyDead

What it would do: Repeals the tax on rental or license fees for commercial real property and a tax credit for nonprofit scholarship contributions. Amends related provisions in sales tax law, data center exemptions, entertainment production company procedures, and turnpike and high-speed rail property exemptions.

Bill titles link to the Florida Legislature's own page.

What LawSignals covers

What counts as data center and energy legislation

In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.

Questions

Does Florida have a data center and energy law?

Yes. Florida enacted 1 data center and energy law in the 2025 and 2026 sessions, among them SB 484. Each is listed on this page with what it requires.

When do Florida's data center and energy laws take effect?

SB 484 on 1 July 2026.

Which data center and energy bills are moving in Florida?

1 bill not yet law has passed a committee or a chamber, the furthest along HB 1007 (passed committee).

What does Florida legislate on most in data center and energy?

Siting, zoning and permitting (3 bills), Water, cooling and emissions (3 bills) and Large-load tariffs and cost allocation (2 bills).

Are these summaries reviewed by a lawyer?

No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.

Know when Florida's data center and energy law changes

An alert when a bill moves, and one report a month on what changed in every state and Congress.