Georgia data center and energy bills

Every data center and energy bill in the Georgia Legislature, what each would do, and where it stands. 29 states enacted data center and energy laws in the 2025 and 2026 sessions. Georgia has bills in progress and none enacted yet.

5 new Georgia laws take effect in 2027

Bills in scope
12bills in scope
Past committee
3past committee
Most recent action
10 March 2026most recent action

Data center and energy in Georgia, by topic

Data center and energy bills in Georgia

The bills not yet law, furthest along first, with what each would do.

3Past committee

9Introduced or inactive

12 bills in scope

Past committee

3

SB 410State Sales and Use Taxes; the data center equipment sales and use tax exemption; repealPassed chamber

What it would do: Creates the Office of the Consumers' Utility Counsel to represent consumers in Public Service Commission proceedings and other regulatory matters affecting utility rates and services, with a director appointed by the Governor.

SB 34Public Service Commission; costs incurred by an electric utility as a result of providing electric services to commercial data centers from being included in any rates; prohibitPassed committee

What it would do: Prohibits electric utilities from including costs related to serving large load customers in general rates unless those rates are designed to substantially recover such costs from those large load customers.

HB 1063Electric utilities; protect residential and retail electricity customers from costs associated with data center construction and operation; requirePassed chamber

What it would do: Requires electric utilities to include contract terms protecting residential and retail customers from data center costs, including minimum billing requirements, extended contract terms, credit provisions, and termination protections for data centers with peak annual electricity demand of 100 megawatts or greater.

Introduced or inactive

9

HB 1387Ad valorem tax; state-wide homestead exemption in an amount as determined from proceeds generated from collection of certain ad valorem property taxes on data centersIn committee

What it would do: Creates a statewide homestead property tax exemption for Georgia residents, with the exemption amount determined annually from excess ad valorem tax collections on data centers, effective January 1, 2027, subject to voter approval and constitutional amendment ratification in November 2026.

HB 1323Electrical service; require new data centers to operate as hybrid power data centersIn committee

What it would do: Requires new data centers that receive a certificate of occupancy after July 1, 2027 to operate as hybrid power data centers using renewable energy sources combined with grid electricity or backup generation, and authorizes the Public Service Commission to enforce compliance.

SB 530Georgia Property Tax Fairness Fund; createIn committee

What it would do: Creates the Georgia Property Tax Fairness Fund funded by insurance premium taxes and high-technology data center sales taxes, and issues income tax credits to qualifying homeowners and renters whose property taxes or rent exceed specified percentages of income.

HB 1059Data Center Impact Assessment and Development Moratorium Act of 2026; enactIn committee

What it would do: Prohibits counties and municipalities from issuing permits for data center construction or development between July 1, 2026, and December 31, 2028. Establishes a 14-member Data Center Impact Assessment Commission to study cumulative impacts and submit policy recommendations by October 1, 2029.

SB 436Counties, Municipal Corporations; local governments and political subdivisions from entering into nondisclosure agreements regarding electricity usage or water usage of any entity; prohibitIn committee

What it would do: Prohibits counties, municipal corporations, and political subdivisions from entering nondisclosure agreements regarding electricity or water usage of any entity. Suspends issuance of new sales tax exemption certificates for high-technology data center equipment from July 1, 2026 through June 30, 2027, except for existing contracts.

HB 1012Local government; construction or development of new data centers for a specified time; prohibitIn committee

What it would do: Prohibits counties, municipalities, and other local political subdivisions from issuing permits, licenses, or certificates for construction or development of new data centers between the effective date and March 1, 2027, except for permits issued before July 1, 2026.

SB 421"The Data Center Transparency Act"; enactIn committee

What it would do: Prohibits counties, municipal corporations, authorities, and other political subdivisions of Georgia from entering into nondisclosure agreements that prevent disclosure of any entity's electricity or water usage information.

SB 408State Sales and Use Taxes; data center equipment sales and use tax exemption; advance the sunset dateIn committee

What it would do: Advances the sunset date for Georgia's data center equipment sales and use tax exemption from January 1, 2032 to January 1, 2027.

HB 559Sales and use tax; exemption for certain high-technology data center equipment; revise sunset dateIn committee

What it would do: Revises the sunset date for a sales and use tax exemption on high-technology data center equipment from December 31, 2031 to December 31, 2026.

Bill titles link to the Georgia Legislature's own page.

What LawSignals covers

What counts as data center and energy legislation

In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.

Questions

Does Georgia have a data center and energy law?

None of the 12 data center and energy bills in the Georgia Legislature has been enacted in the 2025 and 2026 sessions. 3 bills got past a committee.

Which data center and energy bills are moving in Georgia?

3 bills not yet law have passed a committee or a chamber, the furthest along SB 410 (passed chamber), SB 34 (passed committee) and HB 1063 (passed chamber).

What does Georgia legislate on most in data center and energy?

Tax incentives and clawbacks (6 bills), Large-load tariffs and cost allocation (2 bills) and Siting, zoning and permitting (2 bills).

Are these summaries reviewed by a lawyer?

No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.