North Carolina data center and energy bills
Every data center and energy bill in the North Carolina Legislature, what each would do, and where it stands. 29 states enacted data center and energy laws in the 2025 and 2026 sessions. North Carolina has bills in progress and none enacted yet.
- Bills in scope
- 9bills in scope
- Past committee
- 1past committee
- Most recent action
- 30 June 2026most recent action
Data center and energy in North Carolina, by topic
Large-load tariffs and cost allocation
5 bills. Enacted in 19 states.
Grid reliability and load flexibility
3 bills. Enacted in 11 states.
Tax incentives and clawbacks
2 bills. Enacted in 11 states.
Water, cooling and emissions
1 bill. Enacted in 7 states.
Data center and energy bills in North Carolina
The bills not yet law, furthest along first, with what each would do.
1Past committee
8Introduced or inactive
9 bills in scope
Introduced or inactive
8
What it would do: Modifies fuel cost recovery for electric utilities by requiring an 80/20 cost-sharing mechanism between customers and shareholders for fuel cost variances. Establishes a Bring Your Own Generation program allowing large customers with 1+ MW peak demand to develop on-site generation and sell grid services. Appropriates $35 million to the Workforce Housing Loan Program for fiscal year 2026-2027.
What it would do: Establishes a two-year moratorium on datacenter siting permits from August 1, 2026 to August 1, 2028. Requires datacenters to annually submit detailed documentation to claim sales and use tax exemptions and directs the Department of Commerce to report revenue impacts to the General Assembly.
What it would do: Establishes tariff requirements for electric utilities serving large-load customers (50+ MW peak demand) with minimum 20-year contracts, contribution to infrastructure costs, and exit fees. Creates a surcharge on large-load customers to fund grid modernization projects benefiting other ratepayers.
What it would do: Requires electric utilities to file tariffs with the Utilities Commission for serving large-load data centers (over 20 megawatts), ensuring data center customers pay all costs and other ratepayers are protected through minimum 10-year contracts, 85% minimum billing demands, and financial assurance requirements. Repeals certain data center tax provisions effective January 1, 2027.
What it would do: Requires large data centers with peak demand of 40+ megawatts or annual water use exceeding one billion liters to obtain certificates of operation, install on-site clean generation offsetting 25% of peak demand, pay rates covering full marginal infrastructure costs, and comply with water use standards. Prohibits data centers from receiving state and local economic development incentives and sales tax exemptions.
What it would do: Requires large-load facilities (50+ MW peak demand) to obtain certificates of operation from the Utilities Commission with rates based on cost causation, prohibits disconnections during extreme weather, requires utility bill transparency, and mandates grid modernization plans.
What it would do: Prohibits public utilities from recovering costs for grid upgrades, generation, and fuel related to serving commercial data centers (100+ megawatts peak demand) from general rate payers. Creates a 14-member Special Commission for Data Center Planning to review grid capacity and make recommendations on data center locations and energy infrastructure expansion.
What it would do: Requires fees on new EV and PHEV charging stations and vehicles sold in North Carolina, and mandates data centers provide their own dispatchable power generation or contract with utilities to fund new power supplies, rather than socializing costs across all ratepayers.
Bill titles link to the North Carolina Legislature's own page.
What counts as data center and energy legislation
In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.
Questions
Does North Carolina have a data center and energy law?
None of the 9 data center and energy bills in the North Carolina Legislature has been enacted in the 2025 and 2026 sessions. 1 bill got past a committee.
Which data center and energy bills are moving in North Carolina?
1 bill not yet law has passed a committee or a chamber, the furthest along HB 1213 (passed committee).
What does North Carolina legislate on most in data center and energy?
Large-load tariffs and cost allocation (5 bills), Grid reliability and load flexibility (3 bills) and Tax incentives and clawbacks (2 bills).
Are these summaries reviewed by a lawyer?
No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.
Other practice areas in North Carolina
- AI in North Carolina25
- Alcohol in North Carolina15
- Cannabis in North Carolina14
- Children's Online Safety in North Carolina7
- Cybersecurity in North Carolina8
- Data Privacy in North Carolina17
- Employment in North Carolina74
- Healthcare in North Carolina92
- Insurance in North Carolina80
- Intellectual Property in North Carolina4
- Packaging and PFAS in North Carolina13
- Payments and fintech in North Carolina7
- Rental housing in North Carolina14
- Tobacco and nicotine in North Carolina7
- Transportation in North Carolina7
- All jurisdictions
Data center and energy legislation in other jurisdictions
49 more currently hold bills in this tracker
- Virginia83
- New Jersey68
- Congress61
- Pennsylvania38
- Michigan35
- Illinois23
- West Virginia22
- Maryland21
- New York19
- California16
- South Dakota14
- Minnesota13
- Oklahoma13
- South Carolina13
- Georgia12
- Indiana12
- Iowa11
- Montana11
- Ohio11
- Tennessee11
- Texas11
- Arkansas9
- Arizona9
- Connecticut9
- Idaho9
- Louisiana9
- Nebraska8
- Utah8
- Wisconsin8
- Delaware7
- Kentucky7
- Washington7
- Kansas6
- New Hampshire6
- Colorado5
- Florida5
- Missouri5
- Massachusetts4
- North Dakota4
- Rhode Island4
- Vermont4
- Maine3
- Oregon3
- Alaska2
- Alabama2
- Hawaii2
- Mississippi2
- New Mexico2
- Wyoming2