North Carolina data center and energy bills

Every data center and energy bill in the North Carolina Legislature, what each would do, and where it stands. 29 states enacted data center and energy laws in the 2025 and 2026 sessions. North Carolina has bills in progress and none enacted yet.

Bills in scope
9bills in scope
Past committee
1past committee
Most recent action
30 June 2026most recent action

Data center and energy in North Carolina, by topic

Data center and energy bills in North Carolina

The bills not yet law, furthest along first, with what each would do.

1Past committee

8Introduced or inactive

9 bills in scope

Introduced or inactive

8

HB 1192Energy and Housing Affordability Act.In committee

What it would do: Modifies fuel cost recovery for electric utilities by requiring an 80/20 cost-sharing mechanism between customers and shareholders for fuel cost variances. Establishes a Bring Your Own Generation program allowing large customers with 1+ MW peak demand to develop on-site generation and sell grid services. Appropriates $35 million to the Workforce Housing Loan Program for fiscal year 2026-2027.

HB 1189Datacenter Transparency Act.In committee

What it would do: Establishes a two-year moratorium on datacenter siting permits from August 1, 2026 to August 1, 2028. Requires datacenters to annually submit detailed documentation to claim sales and use tax exemptions and directs the Department of Commerce to report revenue impacts to the General Assembly.

SB 1026Power Bill Protection/Large Load Tariff.In committee

What it would do: Establishes tariff requirements for electric utilities serving large-load customers (50+ MW peak demand) with minimum 20-year contracts, contribution to infrastructure costs, and exit fees. Creates a surcharge on large-load customers to fund grid modernization projects benefiting other ratepayers.

HB 1180Data Center Amendments.In committee

What it would do: Requires electric utilities to file tariffs with the Utilities Commission for serving large-load data centers (over 20 megawatts), ensuring data center customers pay all costs and other ratepayers are protected through minimum 10-year contracts, 85% minimum billing demands, and financial assurance requirements. Repeals certain data center tax provisions effective January 1, 2027.

HB 1063Ratepayer and Resource Protection Act.In committee

What it would do: Requires large data centers with peak demand of 40+ megawatts or annual water use exceeding one billion liters to obtain certificates of operation, install on-site clean generation offsetting 25% of peak demand, pay rates covering full marginal infrastructure costs, and comply with water use standards. Prohibits data centers from receiving state and local economic development incentives and sales tax exemptions.

SB 844Affordable Energy Omnibus.In committee

What it would do: Requires large-load facilities (50+ MW peak demand) to obtain certificates of operation from the Utilities Commission with rates based on cost causation, prohibits disconnections during extreme weather, requires utility bill transparency, and mandates grid modernization plans.

HB 1002Rate Payer Protection Act.In committee

What it would do: Prohibits public utilities from recovering costs for grid upgrades, generation, and fuel related to serving commercial data centers (100+ megawatts peak demand) from general rate payers. Creates a 14-member Special Commission for Data Center Planning to review grid capacity and make recommendations on data center locations and energy infrastructure expansion.

HB 638Equitable Escalation of Electricity Demand Act.In committee

What it would do: Requires fees on new EV and PHEV charging stations and vehicles sold in North Carolina, and mandates data centers provide their own dispatchable power generation or contract with utilities to fund new power supplies, rather than socializing costs across all ratepayers.

Bill titles link to the North Carolina Legislature's own page.

What LawSignals covers

What counts as data center and energy legislation

In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.

Questions

Does North Carolina have a data center and energy law?

None of the 9 data center and energy bills in the North Carolina Legislature has been enacted in the 2025 and 2026 sessions. 1 bill got past a committee.

Which data center and energy bills are moving in North Carolina?

1 bill not yet law has passed a committee or a chamber, the furthest along HB 1213 (passed committee).

What does North Carolina legislate on most in data center and energy?

Large-load tariffs and cost allocation (5 bills), Grid reliability and load flexibility (3 bills) and Tax incentives and clawbacks (2 bills).

Are these summaries reviewed by a lawyer?

No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.

Know when North Carolina's data center and energy law changes

An alert when a bill moves, and one report a month on what changed in every state and Congress.