Hawaii data center and energy bills

Every data center and energy bill in the Hawaii Legislature, what each would do, and where it stands. 29 states enacted data center and energy laws in the 2025 and 2026 sessions. Hawaii has bills in progress and none enacted yet.

Bills in scope
4bills in scope
Past committee
4past committee
Most recent action
27 April 2026most recent action

Data center and energy in Hawaii, by topic

Data center and energy bills in Hawaii

The bills not yet law, furthest along first, with what each would do.

4Past committee

4 bills in scope

Past committee

4

HCR 206REQUESTING THE HAWAII STATE ENERGY OFFICE TO CONVENE A WORKING GROUP TO STUDY THE POTENTIAL IMPACTS OF LARGE DATA CENTERS ON HAWAII'S ELECTRIC UTILITIES, RATEPAYERS, NATURAL RESOURCES, AND CLIMATE GOALS.Passed chamber

What it would do: Requests the Hawaii State Energy Office to convene a working group to study potential impacts of large data centers requiring five megawatts or more instantaneous demand on Hawaii's electric utilities, ratepayers, natural resources, and climate goals, with a report due twenty days before the 2027 legislative session.

HR 196REQUESTING THE HAWAII STATE ENERGY OFFICE TO CONVENE A WORKING GROUP TO STUDY THE POTENTIAL IMPACTS OF LARGE DATA CENTERS ON HAWAII'S ELECTRIC UTILITIES, RATEPAYERS, NATURAL RESOURCES, AND CLIMATE GOALS.Passed chamber

What it would do: Requests the Hawaii State Energy Office to convene a working group to study potential impacts of large data centers on Hawaii's electric utilities, ratepayers, natural resources, and climate goals, and to submit findings and recommendations to the Legislature by twenty days prior to the 2027 Regular Session.

SB 338RELATING TO TAXATION.Passed chamber

What it would do: Reinstates the technology infrastructure renovation tax credit at four percent of renovation costs for taxable years beginning after December 31, 2025 through December 31, 2027, and expands the definition of technology-enabled infrastructure to include data servers.

SB 997RELATING TO ENERGY.Passed chamber

What it would do: Requires persons constructing renewable energy projects of one megawatt or greater capacity to provide a signed attestation to the state within thirty days of construction start, certifying that contractors will use apprentices, maintain workplace diversity policies, comply with wage and safety laws, and offer health benefits.

Bill titles link to the Hawaii Legislature's own page.

What LawSignals covers

What counts as data center and energy legislation

In scope: Large-load tariffs and cost allocation; siting, zoning and permitting; tax incentives and clawbacks; on-site and co-located generation; water, cooling and emissions; and grid reliability and load flexibility.

Questions

Does Hawaii have a data center and energy law?

None of the 4 data center and energy bills in the Hawaii Legislature has been enacted in the 2025 and 2026 sessions. 4 bills got past a committee.

Which data center and energy bills are moving in Hawaii?

4 bills not yet law have passed a committee or a chamber, the furthest along HCR 206 (passed chamber), HR 196 (passed chamber) and SB 338 (passed chamber).

What does Hawaii legislate on most in data center and energy?

Large-load tariffs and cost allocation (2 bills), Water, cooling and emissions (2 bills) and Grid reliability and load flexibility (2 bills).

Are these summaries reviewed by a lawyer?

No. Which bills count as Data center and energy bills, and the line on what each law requires or each bill would do, are drafted by software from the bill's own text and not reviewed by an attorney. Every bill links to the legislature's own record: read the text before relying on it. The list covers bills from the 2025 and 2026 sessions.

Know when Hawaii's data center and energy law changes

An alert when a bill moves, and one report a month on what changed in every state and Congress.